Most of the traditional taxi path planning studies assume that the aircraft is in uniform speed,and the optimization goal is the shortest taxi time.Although it is easy to solve,it does not consider the changes in the ...Most of the traditional taxi path planning studies assume that the aircraft is in uniform speed,and the optimization goal is the shortest taxi time.Although it is easy to solve,it does not consider the changes in the speed profile of the aircraft when turning,and the shortest taxi time does not necessarily bring the best taxi fuel consumption.In this paper,the number of turns is considered,and the improved A*algorithm is used to obtain the P static paths with the shortest sum of the straight-line distance and the turning distance of the aircraft as the feasible taxi paths.By balancing taxi time and fuel consumption,a set of Pareto optimal speed profiles are generated for each preselected path to predict the 4-D trajectory of the aircraft.Based on the 4-D trajectory prediction results,the conflict by the occupied time window in the taxiing area is detected.For the conflict aircraft,based on the priority comparison,the waiting or changing path is selected to solve the taxiing conflict.Finally,the conflict free aircraft taxiing path is generated and the area occupation time window on the path is updated.The experimental results show that the total taxi distance and turn time of the aircraft are reduced,and the fuel consumption is reduced.The proposed method has high practical application value and is expected to be applied in real-time air traffic control decision-making in the future.展开更多
At 7:30 Beijing time on Ocotber17,2016,a LM-2F launch vehicle soared up from the Jiuquan Satellite Launch Center,successfully putting the Shenzhou 11 spaceship and its crew into space.Two astronauts,JING Haipeng and ...At 7:30 Beijing time on Ocotber17,2016,a LM-2F launch vehicle soared up from the Jiuquan Satellite Launch Center,successfully putting the Shenzhou 11 spaceship and its crew into space.Two astronauts,JING Haipeng and CHEN Dong will carry out the 6th manned spaceflight mission of the country.展开更多
China launched Algeria’s communications satellite,Alcomsat-1,on a LM-3B carrier rocket into its preset orbit from the Xichang Satellite Launch Center at 00:40 Beijing time on December 11 successfully.Alcomsat-1 is A...China launched Algeria’s communications satellite,Alcomsat-1,on a LM-3B carrier rocket into its preset orbit from the Xichang Satellite Launch Center at 00:40 Beijing time on December 11 successfully.Alcomsat-1 is Algeria’s first communications satellite as well as the first cooperative project in the aerospace industry between China and Algeria.展开更多
基金supported by the National Key R&D Project(No.2020YFB1600101)National Natural Science Foundations of China(Nos.U1833103,71801215)Civil Aviation Flight Wide Area Surveillance and Safety Control Technology Key Laboratory Open Fund(No.202008)。
文摘Most of the traditional taxi path planning studies assume that the aircraft is in uniform speed,and the optimization goal is the shortest taxi time.Although it is easy to solve,it does not consider the changes in the speed profile of the aircraft when turning,and the shortest taxi time does not necessarily bring the best taxi fuel consumption.In this paper,the number of turns is considered,and the improved A*algorithm is used to obtain the P static paths with the shortest sum of the straight-line distance and the turning distance of the aircraft as the feasible taxi paths.By balancing taxi time and fuel consumption,a set of Pareto optimal speed profiles are generated for each preselected path to predict the 4-D trajectory of the aircraft.Based on the 4-D trajectory prediction results,the conflict by the occupied time window in the taxiing area is detected.For the conflict aircraft,based on the priority comparison,the waiting or changing path is selected to solve the taxiing conflict.Finally,the conflict free aircraft taxiing path is generated and the area occupation time window on the path is updated.The experimental results show that the total taxi distance and turn time of the aircraft are reduced,and the fuel consumption is reduced.The proposed method has high practical application value and is expected to be applied in real-time air traffic control decision-making in the future.
文摘At 7:30 Beijing time on Ocotber17,2016,a LM-2F launch vehicle soared up from the Jiuquan Satellite Launch Center,successfully putting the Shenzhou 11 spaceship and its crew into space.Two astronauts,JING Haipeng and CHEN Dong will carry out the 6th manned spaceflight mission of the country.
文摘China launched Algeria’s communications satellite,Alcomsat-1,on a LM-3B carrier rocket into its preset orbit from the Xichang Satellite Launch Center at 00:40 Beijing time on December 11 successfully.Alcomsat-1 is Algeria’s first communications satellite as well as the first cooperative project in the aerospace industry between China and Algeria.