A real-life milk run system designing problem of an engine manufacturer adopted JIT(just-in-time)production is studied.In the process of milk run system planning and design,the supply base is identified and a supplier...A real-life milk run system designing problem of an engine manufacturer adopted JIT(just-in-time)production is studied.In the process of milk run system planning and design,the supply base is identified and a supplier site map is plotted for an arrangement of routes on which parts are periodically collected in a JIT manner from many scattered suppliers.With unit load designing,vehicle choosing and fleet sizing,pickup routing,vehicle assigning and scheduling problems are studied.Among these problems,a CVRP problem is identified and formulated as the key optimization in designing this milk run system,and it is solved through an optimization process.This tactical planning and optimization process gives a good solution to the real problem,and may shed light on the planning of similar systems.展开更多
With rapid development of unmanned aerial vehicles(UAVs), more and more UAVs access satellite networks for data transmission. To improve the spectral efficiency, non-orthogonal multiple access(NOMA) is adopted to inte...With rapid development of unmanned aerial vehicles(UAVs), more and more UAVs access satellite networks for data transmission. To improve the spectral efficiency, non-orthogonal multiple access(NOMA) is adopted to integrate UAVs into the satellite network, where multiple satellites cooperatively serve the UAVs and mobile terminal using the Ku-band and above. Taking into account the rain fading and the fading correlation, the outage performance is first analytically obtained for fixed power allocation and then efficiently calculated by the proposed power allocation algorithm to guarantee the user fairness. Simulation results verify the outage performance analysis and show the performance improvement of the proposed power allocation scheme.展开更多
基金The National Key Technology R&D Program of China during the 11th Five-Year Plan Period(No.2006BAH02A06)
文摘A real-life milk run system designing problem of an engine manufacturer adopted JIT(just-in-time)production is studied.In the process of milk run system planning and design,the supply base is identified and a supplier site map is plotted for an arrangement of routes on which parts are periodically collected in a JIT manner from many scattered suppliers.With unit load designing,vehicle choosing and fleet sizing,pickup routing,vehicle assigning and scheduling problems are studied.Among these problems,a CVRP problem is identified and formulated as the key optimization in designing this milk run system,and it is solved through an optimization process.This tactical planning and optimization process gives a good solution to the real problem,and may shed light on the planning of similar systems.
基金supported in part by the National Natural Science Foundation of China (No. 91638205, 91438206, 61771286, 61621091)
文摘With rapid development of unmanned aerial vehicles(UAVs), more and more UAVs access satellite networks for data transmission. To improve the spectral efficiency, non-orthogonal multiple access(NOMA) is adopted to integrate UAVs into the satellite network, where multiple satellites cooperatively serve the UAVs and mobile terminal using the Ku-band and above. Taking into account the rain fading and the fading correlation, the outage performance is first analytically obtained for fixed power allocation and then efficiently calculated by the proposed power allocation algorithm to guarantee the user fairness. Simulation results verify the outage performance analysis and show the performance improvement of the proposed power allocation scheme.