The reliability of electric supply to consumers is one of the most important factors that determine the requirements imposed on modem utility companies. This paper presents the results of investigation by computer sof...The reliability of electric supply to consumers is one of the most important factors that determine the requirements imposed on modem utility companies. This paper presents the results of investigation by computer software of the overvoltages resulting from a ferroresonance conditions in MV networks at open phase operating condition with and without connection to earth on source and load sides of distribution transformer. This overvoltage may reach 4.2 pu on one of the HV side of transformer unswitched phases. The results of the study show that ferroresonance overvoltage may be controlled by replacing fuses with circuit breakers on HV side to ensure switching-off all phases. Insertion of resistor or reactor in the neutral of source and loadsides of the transformer with 5% active load will help in suppressing overvoltages.展开更多
文摘The reliability of electric supply to consumers is one of the most important factors that determine the requirements imposed on modem utility companies. This paper presents the results of investigation by computer software of the overvoltages resulting from a ferroresonance conditions in MV networks at open phase operating condition with and without connection to earth on source and load sides of distribution transformer. This overvoltage may reach 4.2 pu on one of the HV side of transformer unswitched phases. The results of the study show that ferroresonance overvoltage may be controlled by replacing fuses with circuit breakers on HV side to ensure switching-off all phases. Insertion of resistor or reactor in the neutral of source and loadsides of the transformer with 5% active load will help in suppressing overvoltages.