期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
CAMBGP如何满足需求的变化──可塑性技术研究
1
作者 沙光平 《工程科学学报》 CSCD 北大核心 1994年第S3期54-58,共5页
在开发软件时,往往先要限定用户的需求不能再有变化,然后再进行系统设计和编程序,然而,某个用户提供的需求往往是不全面的,并且需求是发展变化的,这就要求开发者把“变”也当作一种需求来进行设计。本文介绍CAMBGP软件的设... 在开发软件时,往往先要限定用户的需求不能再有变化,然后再进行系统设计和编程序,然而,某个用户提供的需求往往是不全面的,并且需求是发展变化的,这就要求开发者把“变”也当作一种需求来进行设计。本文介绍CAMBGP软件的设计如何满足需求的变化。 展开更多
关键词 总图CAD 可塑性技术 软件开发
下载PDF
Simulation analysis of construction process of high rock slope's stabilization 被引量:2
2
作者 朱占元 凌贤长 +1 位作者 王宣青 邹祖银 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2008年第2期188-193,共6页
A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the u... A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and displacement vector graphs at different construction steps were obtained, and the behavior of the slope during stabilization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper; the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method. 展开更多
关键词 high rock slope STABILITY STABILIZATION construction process simulation elasto-plastic FEM method
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部