针对汽车检测线运行效率评估及确保给定数量车辆检测时间最短的问题,通过分析检测过程中的驱动事件和状态演变,给出了车辆调度的约束条件,在此基础上把模型中的时间约束与受控Petri网相结合,提出了受控时间Petri网(Controlled Time Petr...针对汽车检测线运行效率评估及确保给定数量车辆检测时间最短的问题,通过分析检测过程中的驱动事件和状态演变,给出了车辆调度的约束条件,在此基础上把模型中的时间约束与受控Petri网相结合,提出了受控时间Petri网(Controlled Time Petri Nets)模型,采用该模型对检测线调度过程中的节拍控制与车辆调度进行可视化的建模与分析。实践表明对于多批次车辆检测任务采用该过程模型可明显缩短检测时间。展开更多
In recent years, computer simulation appears to be very advantageous technique for researching the resource-constrained manufacturing system. This paper presents an object-oriented simulation modeling method, which co...In recent years, computer simulation appears to be very advantageous technique for researching the resource-constrained manufacturing system. This paper presents an object-oriented simulation modeling method, which combines the merits of traditional methods such as IDEF0 and Petri Net. In this paper, a four-layer-one-angel hierarchical modeling framework based on OOP is defined. And the modeling description of these layers is expounded, such as: hybrid production control modeling and human resource dispatch modeling. To validate the modeling method, a case study of an auto-product line in a motor manufacturing company has been carried out.展开更多
文摘针对汽车检测线运行效率评估及确保给定数量车辆检测时间最短的问题,通过分析检测过程中的驱动事件和状态演变,给出了车辆调度的约束条件,在此基础上把模型中的时间约束与受控Petri网相结合,提出了受控时间Petri网(Controlled Time Petri Nets)模型,采用该模型对检测线调度过程中的节拍控制与车辆调度进行可视化的建模与分析。实践表明对于多批次车辆检测任务采用该过程模型可明显缩短检测时间。
基金Nationd Natural Science Foundation of Chiina(No.59889505)
文摘In recent years, computer simulation appears to be very advantageous technique for researching the resource-constrained manufacturing system. This paper presents an object-oriented simulation modeling method, which combines the merits of traditional methods such as IDEF0 and Petri Net. In this paper, a four-layer-one-angel hierarchical modeling framework based on OOP is defined. And the modeling description of these layers is expounded, such as: hybrid production control modeling and human resource dispatch modeling. To validate the modeling method, a case study of an auto-product line in a motor manufacturing company has been carried out.