Aiming to resolve the problem that conventional sewage source heat pump systems cannot satisfy heat peak loads of buildings,a new idea that the freezing latent heat is exacted as the auxiliary heat source at the peak ...Aiming to resolve the problem that conventional sewage source heat pump systems cannot satisfy heat peak loads of buildings,a new idea that the freezing latent heat is exacted as the auxiliary heat source at the peak heat load is proposed.First,on the basis of sewage characteristics,a freezing latent heat exchanger is developed to safely eliminate ice,continuously extract heat and remove sewage soft-dirt.A reasonable form of the urban sewage source heat pump system with freezing latent heat collection is presented.Then,the feasibility of the system is theoretically analyzed.The calculation results under typical operating conditions show that the heating ability of the new system is higher than that of the conventional one and the ratio of these two highest heating rates is between 4.5 and 8.7,which proves that the new system has great application potential in cold regions.展开更多
At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order ...At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order to eliminate the fluctuations and reduce problems, taking start pump, connect pump test under pressure in the water injection station installed the rotor frequency control system Changqing oil field developed. During the experiment, by progressively increasing the pressure pump to verify start pump with pressure feasibility test, the result shows when the pressure in the 0-25MPa pressure start and connect pump can be realized, and forecast the maximum pressure of the current start of the station with pressure pump. Start pump with pressure achieve the elimination of pressure fluctuations, provide the prerequisites about realizeing stable water injection pressure, and ultimately realize oil field water injection station to be automatic water injection laid a foundation.展开更多
基金The National Key Technology R&D Program of Chinaduring the 11th Five-Year Plan Period(No.2008BAJ12B05-05)the Research Foundation of Education Bureau of Heilongjiang Province,China(No.11551114)the China Postdoctoral Science Foundation(No.20100471438).
文摘Aiming to resolve the problem that conventional sewage source heat pump systems cannot satisfy heat peak loads of buildings,a new idea that the freezing latent heat is exacted as the auxiliary heat source at the peak heat load is proposed.First,on the basis of sewage characteristics,a freezing latent heat exchanger is developed to safely eliminate ice,continuously extract heat and remove sewage soft-dirt.A reasonable form of the urban sewage source heat pump system with freezing latent heat collection is presented.Then,the feasibility of the system is theoretically analyzed.The calculation results under typical operating conditions show that the heating ability of the new system is higher than that of the conventional one and the ratio of these two highest heating rates is between 4.5 and 8.7,which proves that the new system has great application potential in cold regions.
文摘At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order to eliminate the fluctuations and reduce problems, taking start pump, connect pump test under pressure in the water injection station installed the rotor frequency control system Changqing oil field developed. During the experiment, by progressively increasing the pressure pump to verify start pump with pressure feasibility test, the result shows when the pressure in the 0-25MPa pressure start and connect pump can be realized, and forecast the maximum pressure of the current start of the station with pressure pump. Start pump with pressure achieve the elimination of pressure fluctuations, provide the prerequisites about realizeing stable water injection pressure, and ultimately realize oil field water injection station to be automatic water injection laid a foundation.