In view of the flaws of component-based software (CBS) reliability modeling and analysis, the low recognition degree of debugging process, too many assumptions and difficulties in obtaining the solution, a CBS relia...In view of the flaws of component-based software (CBS) reliability modeling and analysis, the low recognition degree of debugging process, too many assumptions and difficulties in obtaining the solution, a CBS reliability simulation process is presented incorporating the imperfect debugging and the limitation of debugging resources. Considering the effect of imperfect debugging on fault detec- tion and correction process, a CBS integration testing model is sketched by multi-queue muhichannel and finite server queuing model (MMFSQM). Compared with the analytical method based on pa- rameters and other nonparametric approaches, the simulation approach can relax more of the usual reliability modeling assumptions and effectively expound integration testing process of CBS. Then, CBS reliability process simulation procedure is developed accordingly. The proposed simulation ap- proach is validated to be sound and effective by simulation experiment studies and analysis.展开更多
Against the deficiencies of component-based software(CBS) reliability modeling and analysis,for instance,importing too many assumptions,paying less attention to debugging process without considering imperfect debuggin...Against the deficiencies of component-based software(CBS) reliability modeling and analysis,for instance,importing too many assumptions,paying less attention to debugging process without considering imperfect debugging and change-point(CP) problems adequately,an approach of CBS reliability process analysis is proposed which incorporates the imperfect debugging and CP.First,perfect/imperfect debugging and CP are reviewed.Based on the queuing theory,a multi-queue multichannel and infinite server queuing model(MMISQM) is presented to sketch the integration test process of CBS.Meanwhile,considering the effects of imperfect debugging and CP,expressions for fault detection and correction are derived based on MMISQM.Numerical results demonstrate that the proposed model can sketch the integration test process of CBS with preferable performance which outperforms other models.展开更多
At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order ...At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order to eliminate the fluctuations and reduce problems, taking start pump, connect pump test under pressure in the water injection station installed the rotor frequency control system Changqing oil field developed. During the experiment, by progressively increasing the pressure pump to verify start pump with pressure feasibility test, the result shows when the pressure in the 0-25MPa pressure start and connect pump can be realized, and forecast the maximum pressure of the current start of the station with pressure pump. Start pump with pressure achieve the elimination of pressure fluctuations, provide the prerequisites about realizeing stable water injection pressure, and ultimately realize oil field water injection station to be automatic water injection laid a foundation.展开更多
In order to research the influence of adjustable vane on the aerodynamic performance of the ram-rotor test system, FLUENT soft-ware has been adopted to simulate the flow passage of the ram-rotor test system numericall...In order to research the influence of adjustable vane on the aerodynamic performance of the ram-rotor test system, FLUENT soft-ware has been adopted to simulate the flow passage of the ram-rotor test system numerically. The vane opening is controlled by changing the stagger angle of the vane blades. Results show that flow uniformity of vane outlet is influenced by the vane openings, which has an impact on the aerodynamic loss to some extent. Total pressure ratio, adiabatic efficiency and mass flow rate can be regulated by different openings of the vane. Compared with -8° vane opening, top efficiency of the ram-rotor increases by about 13.8% at +6° opening. And total pressure ratio drops by 5.87%. The rising opening increases the relative Mach number at inlet of the ram-rotor and weakens the intensity of the tip clearance leakage, which comes to a decreasing aerodynamic loss.展开更多
基金Supported by the National High Technology Research and Development Program of China(No.2008AA01A201)the National Nature Science Foundation of China(No.60503015,90818016)
文摘In view of the flaws of component-based software (CBS) reliability modeling and analysis, the low recognition degree of debugging process, too many assumptions and difficulties in obtaining the solution, a CBS reliability simulation process is presented incorporating the imperfect debugging and the limitation of debugging resources. Considering the effect of imperfect debugging on fault detec- tion and correction process, a CBS integration testing model is sketched by multi-queue muhichannel and finite server queuing model (MMFSQM). Compared with the analytical method based on pa- rameters and other nonparametric approaches, the simulation approach can relax more of the usual reliability modeling assumptions and effectively expound integration testing process of CBS. Then, CBS reliability process simulation procedure is developed accordingly. The proposed simulation ap- proach is validated to be sound and effective by simulation experiment studies and analysis.
基金Supported by the National High Technology Research and Development Program of China(No.2008AA01A201)the National Natural ScienceFoundation of China(No.60503015)+1 种基金the National Key R&D Program of China(No.2013BA17F02)the Shandong Province Science andTechnology Program of China(No.2011GGX10108,2010GGX10104)
文摘Against the deficiencies of component-based software(CBS) reliability modeling and analysis,for instance,importing too many assumptions,paying less attention to debugging process without considering imperfect debugging and change-point(CP) problems adequately,an approach of CBS reliability process analysis is proposed which incorporates the imperfect debugging and CP.First,perfect/imperfect debugging and CP are reviewed.Based on the queuing theory,a multi-queue multichannel and infinite server queuing model(MMISQM) is presented to sketch the integration test process of CBS.Meanwhile,considering the effects of imperfect debugging and CP,expressions for fault detection and correction are derived based on MMISQM.Numerical results demonstrate that the proposed model can sketch the integration test process of CBS with preferable performance which outperforms other models.
文摘At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order to eliminate the fluctuations and reduce problems, taking start pump, connect pump test under pressure in the water injection station installed the rotor frequency control system Changqing oil field developed. During the experiment, by progressively increasing the pressure pump to verify start pump with pressure feasibility test, the result shows when the pressure in the 0-25MPa pressure start and connect pump can be realized, and forecast the maximum pressure of the current start of the station with pressure pump. Start pump with pressure achieve the elimination of pressure fluctuations, provide the prerequisites about realizeing stable water injection pressure, and ultimately realize oil field water injection station to be automatic water injection laid a foundation.
基金supported by the National Natural Science Foundation of China(No.51406022)Liaoning Natural Science Foundation(No.2013020129)+1 种基金Science and Technology Research Project from Education Department of Liaoning Province(No.L2013199)Program for Liaoning Innovative Research Team in University(LT2015004)
文摘In order to research the influence of adjustable vane on the aerodynamic performance of the ram-rotor test system, FLUENT soft-ware has been adopted to simulate the flow passage of the ram-rotor test system numerically. The vane opening is controlled by changing the stagger angle of the vane blades. Results show that flow uniformity of vane outlet is influenced by the vane openings, which has an impact on the aerodynamic loss to some extent. Total pressure ratio, adiabatic efficiency and mass flow rate can be regulated by different openings of the vane. Compared with -8° vane opening, top efficiency of the ram-rotor increases by about 13.8% at +6° opening. And total pressure ratio drops by 5.87%. The rising opening increases the relative Mach number at inlet of the ram-rotor and weakens the intensity of the tip clearance leakage, which comes to a decreasing aerodynamic loss.