Based on coal seam geological condition and mining technological characteristic in Jisan Mine, coal seamgeological condition is quantitative evaluated by using fuzzy evaluation with the view of coal mining and coalfac...Based on coal seam geological condition and mining technological characteristic in Jisan Mine, coal seamgeological condition is quantitative evaluated by using fuzzy evaluation with the view of coal mining and coalfaceproduction. The structure and index system of evaluation factor, the membership functions and weights of evaluationfactor, evaluation model and reliability in the coal seam geological conditions are expounded in detail. Eighty-twocoalfaces which will be exploited is classified. All of these have provided a theoretical foundation for the selection ofcoal mining technology and for sustainable development of the coal mine.展开更多
The hydraulic system plays an important role in supplying power and its transition to other working parts of a coal shearer machine. In this paper, the reliability of the hydraulic system of a drum shearer was analyze...The hydraulic system plays an important role in supplying power and its transition to other working parts of a coal shearer machine. In this paper, the reliability of the hydraulic system of a drum shearer was analyzed. A case study was done in the Tabas Coal Mine in Iran for failure data collection. The results of the statistical analysis show that the time between failures (TBF) data of this system followed the 3-parameters Weibull distribution. There is about a 54% chance that the hydraulic system of the drum shearer will not fail for the first 50 h of operation. The developed model shows that the reliability of the hydraulic system reduces to a zero value after approximately 1 650 hours of operation. The failure rate of this system decreases when time increases. Therefore, corrective maintenance (run-to-t^ailure) was selected as the best maintenance strategy for it.展开更多
3D visualization is one of major problems in “Digital Mine” theory and its technological research field. Through the observation of 3D geological models, spatial structural information, connected with the informatio...3D visualization is one of major problems in “Digital Mine” theory and its technological research field. Through the observation of 3D geological models, spatial structural information, connected with the information of production management hidden in geological data, could be detected. In order to meet the requirement of more efficient coal exploration, a case study of geological characters of the Daliuta Coal Mine is presented in which 3D visual models of the ground surface and geologic bodies are established on the basis of data models and data structures of 3D geology modeling. The main conclusions of this study are as follows: (1) Through analysis and organization of spatial discrete data, the drillhole database is designed with the data of the Daliuta mine; the connections amomg drillhole data are real- ized and displayed in a 3D environment. (2) Combining real data of the Daliuta mine, drillhole visualization is realized in a 3D environment by using the CoalMiner system. (3) The ground surface modeling of the Daliuta coal mine adopted a surface-data model and a TIN data structure. (4) 3D models of coal seams and rock formations of the Daliuta mine are established, which provide a method for the simulation of complex surfaces of geologic bodies. In the end, the models are applied to the Daliuta coal mine and the result shows that better geological effects are obtained.展开更多
To solve the issues of calculating gas loss quantity during sampling,simulated gas desorption process of the consumingly destruct coal with the assembly simulation testing device.Through an analysis of the simulation ...To solve the issues of calculating gas loss quantity during sampling,simulated gas desorption process of the consumingly destruct coal with the assembly simulation testing device.Through an analysis of the simulation test datum using SPSS software, established a new formula that can be better description on gas desorption process,more accurate calculation of the gas loss quantity during sampling process,and calculating re- leasable gas quantity during a certain period.Aimed at the new formula,the best time of taking sample is confirmed 3 minutes for consumingly destruct coal,the computative error is less than 10%.Through experiment at laboratory and locale,the new formula could well describe consumingly destruct coal gas desorption law,and it has high calculation preci- sion of gas loss quantity in sampling and desorption quanlity.展开更多
The reliability and maintainability of electrical system of drum shearer at Parvade. 1 Coal Mine in central Iran was analyzed. The maintenance and failure data were collected during 19 months of shearer operation. Acc...The reliability and maintainability of electrical system of drum shearer at Parvade. 1 Coal Mine in central Iran was analyzed. The maintenance and failure data were collected during 19 months of shearer operation. According to trend and serial correlation tests, the data were independent and identically distributed (iid) and therefore the statistical techniques were used for modeling. The data analysis show that the time between failures (TBF) and time to repair (TTR) data obey the lognormal and Weibull 3 parameters distribution respectively. Reliability-based preventive maintenance time intervals for electrical system of the drum shearer were calculated with regard to reliability plot. The reliability-based maintenance intervals for 90%, 80%, 70% and 50% reliability level are respectively 9.91, 17.96, 27.56 and 56.1 h. Also the calculations show that time to repair (TTR) of this system varies in range 0.17-4 h with 1.002 h as mean time to repair (MTTR). There is a 80% chance that the electrical system of shearer of Parvade. 1 mine repair will be accomplished within 1.45 h.展开更多
Data modeling is the foundation of three-dimensional visualization technology. First the paper proposed the 3D integrated data model of stratum, laneway and drill on the basic of TIN and ARTP, and designed the relevan...Data modeling is the foundation of three-dimensional visualization technology. First the paper proposed the 3D integrated data model of stratum, laneway and drill on the basic of TIN and ARTP, and designed the relevant conceptual and logical model from the view of data model, and described the data structure of geometric elements of the model by adopting the object-oriented modeling idea. And then studied the key modeling technology of stratum, laneway and drill, introduced the ARTP modeling process of stratum, laneway and drill and studied the 3D geometric modeling process of different section laneways. At last, the paper realized the three-dimensional visualization system professionally coalmine-oriented, using SQL Server as background database, Visual C++6.0 and OpenGL as foreground development tools.展开更多
In order to safely exploit coal resource, protection coal pillars must be prepared in coal mines. Some correlative parameters of protection coal pillar are calculated by Drop face and Drop line methods. Models of prot...In order to safely exploit coal resource, protection coal pillars must be prepared in coal mines. Some correlative parameters of protection coal pillar are calculated by Drop face and Drop line methods. Models of protecting surface objects and coal pillars are established by TIN modeling and object-oriented technique. By using ACCESS2000as the database and the VC++ and OpenGL as the language, the calculation of protective coal pillars is realized and the 3D-visulizaiton system for protected objects on ground surface and for coal pillars is developed. The system can obtain the data of characteristic points on the surface interactively from the digitized mine topography map, constructing 3D model automatically. It can also obtain the interrelated parameters of the coal seam and drill hole data from existing geolog!cal surveying database to calculate the location, surface area and the total coal columns. The whole process can be computed quickly and accurately. And the 3D visualization system was applied in a mine, showing that the system solve the problem of complex calculation, not only realized the automatic 3D mapping and visualization of coal pillars for buildings protection, but also greatly improves the working efficiency.展开更多
The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established corresponding...The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established correspondingly, and the mathematical equation of the coefficient of velocity matching of coal cutting and caving is obtained, which meets a certain reliability demand for making the working procedure of coal caving not influence coal cutting of coal-cutter. The results show that the relationship between the coefficient of the velocity matching and the reliability of coal cutting and caving system is linear on the whole when R <0.9. It is pointed out that different numerical value should be selected for different coal face according to different demand for reliability.展开更多
China's total coal reserves are enormous, in which recoverable reserves of coal seam thickness ofmineable coal reserves in China accounted for 43% of recoverable reserves When correctly using thick seam mining, minin...China's total coal reserves are enormous, in which recoverable reserves of coal seam thickness ofmineable coal reserves in China accounted for 43% of recoverable reserves When correctly using thick seam mining, mining methods can improve the proper thick seam mining rate and reduce coal loss. Using proper thick seam mining method can effectively reduce the thick seam mining costs. In mining safety, the use of appropriate thick seam mining methods can effectively prevent thick seam mining accidents. But in the process of development and current situation from the perspective of the Chinese coal mining, there are certain aspects of thick seam mining problems. These problems are mainly in the thick seam mining and the coal recovery rate is low, resulting in lots of waste coal. Besides, thick coal mining is less secure, safe and there are frequent accidents. These problems have seriously affected the thick seam mining. And a lot of thick coal seams of coal resources can not be effectively taken out. Now Chinese mining methods in thick seam mining areas are mainly open-pit mining and underground mining exploitation. Because of the open-pit coal burial depth has more stringent requirements, only used in shallow-depth areas. Underground mining is the primary way China is now using in thick seam mining. Underground mining methods include full-height slice mining and mechanized mining caving mining method once adopted. Research on these thick seam mining methods can provide theoretical and technical support for thick seam mining, thick seam mining techniques to enhance the level . I will combine the current situation of thick seam mining in Chinese study with thick seam mining methods, comments and suggestions for the current thick seam mining study展开更多
This paper highlights the role of automation technologies for improving the safety, productivity, and environmental sustainability of underground coal mining processes. This is accomplished by reviewing the impact tha...This paper highlights the role of automation technologies for improving the safety, productivity, and environmental sustainability of underground coal mining processes. This is accomplished by reviewing the impact that the introduction of automation technology has made through the longwall shearer automation research program of Longwall Automation Steering Committee(LASC). This result has been achieved through close integration of sensing, processing, and control technologies into the longwall mining process. Key to the success of the automation solution has been the development of new sensing methods to accurately measure the location of longwall equipment and the spatial configuration of coal seam geology. The relevance of system interoperability and open communications standards for facilitating effective automation is also discussed. Importantly, the insights gained through the longwall automation development process are now leading to new technology transfer activity to benefit other underground mining processes.展开更多
Visible light induced titanium dioxide (TiO2) pillared montmorillonite clay (MMT) photocatalyst coupling-doped with S and N elements was prepared by the two-step ad- sorption method.The photocatalyst was characterized...Visible light induced titanium dioxide (TiO2) pillared montmorillonite clay (MMT) photocatalyst coupling-doped with S and N elements was prepared by the two-step ad- sorption method.The photocatalyst was characterized by X-ray photoelectron spectros- copy (XPS) and ultraviolet-visible (UV-vis) absorption spectroscopy.The photocatalysic ef- ficacy of the prepared photocatalyst for degrading gaseous formaldehyde was evaluated under visible light irradiation.The degrading rate of gaseous formaldehyde is nearly 85% in 300 min visible light irradiation.The results demonstrate that the much higher visible light photocatalytic activity of the photocatalyst is due to the synergistic effects of coupling- doping of S and N elements to TiO2,extensive specific surface area of MMT and quantum sized efficacy between layers of MMT.展开更多
文摘Based on coal seam geological condition and mining technological characteristic in Jisan Mine, coal seamgeological condition is quantitative evaluated by using fuzzy evaluation with the view of coal mining and coalfaceproduction. The structure and index system of evaluation factor, the membership functions and weights of evaluationfactor, evaluation model and reliability in the coal seam geological conditions are expounded in detail. Eighty-twocoalfaces which will be exploited is classified. All of these have provided a theoretical foundation for the selection ofcoal mining technology and for sustainable development of the coal mine.
文摘The hydraulic system plays an important role in supplying power and its transition to other working parts of a coal shearer machine. In this paper, the reliability of the hydraulic system of a drum shearer was analyzed. A case study was done in the Tabas Coal Mine in Iran for failure data collection. The results of the statistical analysis show that the time between failures (TBF) data of this system followed the 3-parameters Weibull distribution. There is about a 54% chance that the hydraulic system of the drum shearer will not fail for the first 50 h of operation. The developed model shows that the reliability of the hydraulic system reduces to a zero value after approximately 1 650 hours of operation. The failure rate of this system decreases when time increases. Therefore, corrective maintenance (run-to-t^ailure) was selected as the best maintenance strategy for it.
基金Project 2002CB412601 supported by Chinese Ministry of Science and Technology
文摘3D visualization is one of major problems in “Digital Mine” theory and its technological research field. Through the observation of 3D geological models, spatial structural information, connected with the information of production management hidden in geological data, could be detected. In order to meet the requirement of more efficient coal exploration, a case study of geological characters of the Daliuta Coal Mine is presented in which 3D visual models of the ground surface and geologic bodies are established on the basis of data models and data structures of 3D geology modeling. The main conclusions of this study are as follows: (1) Through analysis and organization of spatial discrete data, the drillhole database is designed with the data of the Daliuta mine; the connections amomg drillhole data are real- ized and displayed in a 3D environment. (2) Combining real data of the Daliuta mine, drillhole visualization is realized in a 3D environment by using the CoalMiner system. (3) The ground surface modeling of the Daliuta coal mine adopted a surface-data model and a TIN data structure. (4) 3D models of coal seams and rock formations of the Daliuta mine are established, which provide a method for the simulation of complex surfaces of geologic bodies. In the end, the models are applied to the Daliuta coal mine and the result shows that better geological effects are obtained.
基金the National Natural Science Foundation of China(50474011)Key Project of Chinese National Programs for Fundamental Research and Development(973 Program 2006CB202204)+1 种基金Creation Foundation for Extraordinary Scholars in Henan Province of China(0421000400)Major Project of Science and Technology Tackle Key Problem in Henan Province of China(0421000400)
文摘To solve the issues of calculating gas loss quantity during sampling,simulated gas desorption process of the consumingly destruct coal with the assembly simulation testing device.Through an analysis of the simulation test datum using SPSS software, established a new formula that can be better description on gas desorption process,more accurate calculation of the gas loss quantity during sampling process,and calculating re- leasable gas quantity during a certain period.Aimed at the new formula,the best time of taking sample is confirmed 3 minutes for consumingly destruct coal,the computative error is less than 10%.Through experiment at laboratory and locale,the new formula could well describe consumingly destruct coal gas desorption law,and it has high calculation preci- sion of gas loss quantity in sampling and desorption quanlity.
文摘The reliability and maintainability of electrical system of drum shearer at Parvade. 1 Coal Mine in central Iran was analyzed. The maintenance and failure data were collected during 19 months of shearer operation. According to trend and serial correlation tests, the data were independent and identically distributed (iid) and therefore the statistical techniques were used for modeling. The data analysis show that the time between failures (TBF) and time to repair (TTR) data obey the lognormal and Weibull 3 parameters distribution respectively. Reliability-based preventive maintenance time intervals for electrical system of the drum shearer were calculated with regard to reliability plot. The reliability-based maintenance intervals for 90%, 80%, 70% and 50% reliability level are respectively 9.91, 17.96, 27.56 and 56.1 h. Also the calculations show that time to repair (TTR) of this system varies in range 0.17-4 h with 1.002 h as mean time to repair (MTTR). There is a 80% chance that the electrical system of shearer of Parvade. 1 mine repair will be accomplished within 1.45 h.
文摘Data modeling is the foundation of three-dimensional visualization technology. First the paper proposed the 3D integrated data model of stratum, laneway and drill on the basic of TIN and ARTP, and designed the relevant conceptual and logical model from the view of data model, and described the data structure of geometric elements of the model by adopting the object-oriented modeling idea. And then studied the key modeling technology of stratum, laneway and drill, introduced the ARTP modeling process of stratum, laneway and drill and studied the 3D geometric modeling process of different section laneways. At last, the paper realized the three-dimensional visualization system professionally coalmine-oriented, using SQL Server as background database, Visual C++6.0 and OpenGL as foreground development tools.
基金Projects 59904001 supported by National Natural Science Foundation of China
文摘In order to safely exploit coal resource, protection coal pillars must be prepared in coal mines. Some correlative parameters of protection coal pillar are calculated by Drop face and Drop line methods. Models of protecting surface objects and coal pillars are established by TIN modeling and object-oriented technique. By using ACCESS2000as the database and the VC++ and OpenGL as the language, the calculation of protective coal pillars is realized and the 3D-visulizaiton system for protected objects on ground surface and for coal pillars is developed. The system can obtain the data of characteristic points on the surface interactively from the digitized mine topography map, constructing 3D model automatically. It can also obtain the interrelated parameters of the coal seam and drill hole data from existing geolog!cal surveying database to calculate the location, surface area and the total coal columns. The whole process can be computed quickly and accurately. And the 3D visualization system was applied in a mine, showing that the system solve the problem of complex calculation, not only realized the automatic 3D mapping and visualization of coal pillars for buildings protection, but also greatly improves the working efficiency.
文摘The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established correspondingly, and the mathematical equation of the coefficient of velocity matching of coal cutting and caving is obtained, which meets a certain reliability demand for making the working procedure of coal caving not influence coal cutting of coal-cutter. The results show that the relationship between the coefficient of the velocity matching and the reliability of coal cutting and caving system is linear on the whole when R <0.9. It is pointed out that different numerical value should be selected for different coal face according to different demand for reliability.
文摘China's total coal reserves are enormous, in which recoverable reserves of coal seam thickness ofmineable coal reserves in China accounted for 43% of recoverable reserves When correctly using thick seam mining, mining methods can improve the proper thick seam mining rate and reduce coal loss. Using proper thick seam mining method can effectively reduce the thick seam mining costs. In mining safety, the use of appropriate thick seam mining methods can effectively prevent thick seam mining accidents. But in the process of development and current situation from the perspective of the Chinese coal mining, there are certain aspects of thick seam mining problems. These problems are mainly in the thick seam mining and the coal recovery rate is low, resulting in lots of waste coal. Besides, thick coal mining is less secure, safe and there are frequent accidents. These problems have seriously affected the thick seam mining. And a lot of thick coal seams of coal resources can not be effectively taken out. Now Chinese mining methods in thick seam mining areas are mainly open-pit mining and underground mining exploitation. Because of the open-pit coal burial depth has more stringent requirements, only used in shallow-depth areas. Underground mining is the primary way China is now using in thick seam mining. Underground mining methods include full-height slice mining and mechanized mining caving mining method once adopted. Research on these thick seam mining methods can provide theoretical and technical support for thick seam mining, thick seam mining techniques to enhance the level . I will combine the current situation of thick seam mining in Chinese study with thick seam mining methods, comments and suggestions for the current thick seam mining study
文摘This paper highlights the role of automation technologies for improving the safety, productivity, and environmental sustainability of underground coal mining processes. This is accomplished by reviewing the impact that the introduction of automation technology has made through the longwall shearer automation research program of Longwall Automation Steering Committee(LASC). This result has been achieved through close integration of sensing, processing, and control technologies into the longwall mining process. Key to the success of the automation solution has been the development of new sensing methods to accurately measure the location of longwall equipment and the spatial configuration of coal seam geology. The relevance of system interoperability and open communications standards for facilitating effective automation is also discussed. Importantly, the insights gained through the longwall automation development process are now leading to new technology transfer activity to benefit other underground mining processes.
基金the Scientific Research Foundation for the Returned Overseas Chinese Scholars,State Education Ministry,China(LX-2006-3311)
文摘Visible light induced titanium dioxide (TiO2) pillared montmorillonite clay (MMT) photocatalyst coupling-doped with S and N elements was prepared by the two-step ad- sorption method.The photocatalyst was characterized by X-ray photoelectron spectros- copy (XPS) and ultraviolet-visible (UV-vis) absorption spectroscopy.The photocatalysic ef- ficacy of the prepared photocatalyst for degrading gaseous formaldehyde was evaluated under visible light irradiation.The degrading rate of gaseous formaldehyde is nearly 85% in 300 min visible light irradiation.The results demonstrate that the much higher visible light photocatalytic activity of the photocatalyst is due to the synergistic effects of coupling- doping of S and N elements to TiO2,extensive specific surface area of MMT and quantum sized efficacy between layers of MMT.