期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
公立医院医疗设备绩效审计可量化模型研究
1
作者 郑锦嵩 余梅 沈绪婷 《中国卫生经济》 北大核心 2023年第11期85-87,共3页
目的:公立医院属于财政差额拨款单位,开展高效、准确的医疗设备绩效审计有利于提高公立医院的运营管理水平。方法:以“5E”绩效审计模型为基础构建1个包含七要素的医疗设备绩效审计可量化模型,并以样本医院的医疗设备数据演示该模型运... 目的:公立医院属于财政差额拨款单位,开展高效、准确的医疗设备绩效审计有利于提高公立医院的运营管理水平。方法:以“5E”绩效审计模型为基础构建1个包含七要素的医疗设备绩效审计可量化模型,并以样本医院的医疗设备数据演示该模型运用。结果:运用该模型可以高效、准确地发现公立医院医疗设备绩效情况问题并作出审计评价。结论:运用该模型审计样本医院医疗设备绩效情况,审计工作的效率性和准确性都得到了提高。 展开更多
关键词 公立医院 可量化模型 医疗设备 绩效审计
原文传递
Model-based optical metrology and visualization of 3-D complex objects 被引量:2
2
作者 LIU Xiao-li LI A-meng +3 位作者 ZHAO Xiao-bo GAO Peng-dong TIAN Jin-dong PENG Xiang 《Optoelectronics Letters》 EI 2007年第2期115-118,共4页
This letter addresses several key issues in the process of model-based optical metrology, including three dimensional (3D) sensing, calibration, registration and fusion of range images, geometric representation, and v... This letter addresses several key issues in the process of model-based optical metrology, including three dimensional (3D) sensing, calibration, registration and fusion of range images, geometric representation, and visualization of reconstructed 3D model by taking into account the shape measurement of 3D complex structures,and some experimental results are presented. 展开更多
关键词 三维复杂目标 可视化 光学计量 数学模型 距离象 图象融合
下载PDF
Visible calculation of mining index based on stope 3D surveying and block modeling 被引量:7
3
作者 Liu Xiaoming Luo Zhouquan +3 位作者 Yang Biao Lu Guang Cao Shengxiang Jiang Xinjian 《International Journal of Mining Science and Technology》 2012年第2期139-144,共6页
Aimed at the CMS laser scanning theory and characteristic, a combined actual situation of stope N4-5 of Fankou Lead-Zinc Mine and complementary monitoring of the stope were carried out by carefully choos- ing two meas... Aimed at the CMS laser scanning theory and characteristic, a combined actual situation of stope N4-5 of Fankou Lead-Zinc Mine and complementary monitoring of the stope were carried out by carefully choos- ing two measuring points. The cavity 3D visible model was created by large-scale mining industry soft- ware Surpac after changing the measured data. The stope mine design model, bottom structural model and backfill model of the south and north sides of the stope N4-5 were established according to the stope design data. On this basis, the stope block model was established, and then block attribute was estimated. The amount the ore remains, mullock, backfill and total mined ore were calculated through the solid model restrains. Finally, the stope mining dilution rate and loss rate reached 8.2% and 1.47%, respectively. The practice indicates that the mining index visible calculation method based on cavity 3D monitoring and stope block modeling can make up the deficiency of adopting the solid model to directly carry out the Boolean operation, The stope mining indexes obtained by this method are accurate and reliable, and can be used to guide the actual nroduction management and estimate the mining aualitv. 展开更多
关键词 Stope cavityCavity monitoring systemBlock modelMining indexVisible calculation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部