传统的概率转移矩阵(Probabilistic Transfer Matrix,PTM)方法是一种能够比较精确地估计软差错对门级电路可靠度影响的方法,但现有的方法只适用于组合逻辑电路的可靠度估计.本文提出基于PTM的时序电路可靠度估计方法(reliability estima...传统的概率转移矩阵(Probabilistic Transfer Matrix,PTM)方法是一种能够比较精确地估计软差错对门级电路可靠度影响的方法,但现有的方法只适用于组合逻辑电路的可靠度估计.本文提出基于PTM的时序电路可靠度估计方法(reliability estimation of Sequential circuits based on PTM,S-PTM),先把待评估时序电路划分为输出逻辑模块和次态逻辑模块,然后用本文提出的时序电路PTM计算模型得到电路的PTM,最后根据输入信号的概率分布计算出时序电路的可靠度.用ISCAS 89基准电路为对象进行实验和验证,实验表明所提方法是准确和合理的.展开更多
The subject of this work is the assessment on the stability of an excavated high slope in order to insure the security of the building site adjacent to the slope, which is frequently encountered in town construction i...The subject of this work is the assessment on the stability of an excavated high slope in order to insure the security of the building site adjacent to the slope, which is frequently encountered in town construction in mountainous areas due to terrain limit. On the base of some typical engineering cases in Chongqing, several crucial problems on security assessment of building site adjacent to an excavated high slope, including the natural geological conditions and man-destroyed degree, engineering environment, potential failure pattern of the high slope, calculation parameters and analysis methods, are roundly discussed. It is demonstrated that the conclusion of security assessment can be determined according to the aspects above-mentioned, and the security assessment is one of the fundamental data to insure the safety of the related construction, site and buildings.展开更多
文摘传统的概率转移矩阵(Probabilistic Transfer Matrix,PTM)方法是一种能够比较精确地估计软差错对门级电路可靠度影响的方法,但现有的方法只适用于组合逻辑电路的可靠度估计.本文提出基于PTM的时序电路可靠度估计方法(reliability estimation of Sequential circuits based on PTM,S-PTM),先把待评估时序电路划分为输出逻辑模块和次态逻辑模块,然后用本文提出的时序电路PTM计算模型得到电路的PTM,最后根据输入信号的概率分布计算出时序电路的可靠度.用ISCAS 89基准电路为对象进行实验和验证,实验表明所提方法是准确和合理的.
文摘The subject of this work is the assessment on the stability of an excavated high slope in order to insure the security of the building site adjacent to the slope, which is frequently encountered in town construction in mountainous areas due to terrain limit. On the base of some typical engineering cases in Chongqing, several crucial problems on security assessment of building site adjacent to an excavated high slope, including the natural geological conditions and man-destroyed degree, engineering environment, potential failure pattern of the high slope, calculation parameters and analysis methods, are roundly discussed. It is demonstrated that the conclusion of security assessment can be determined according to the aspects above-mentioned, and the security assessment is one of the fundamental data to insure the safety of the related construction, site and buildings.