Ocean platforms are subjected to a variety of environment loads, such as those from winds, waves, currents, etc. In this study, the torsion problems of a gravity platform column with cracks under wind load were invest...Ocean platforms are subjected to a variety of environment loads, such as those from winds, waves, currents, etc. In this study, the torsion problems of a gravity platform column with cracks under wind load were investigated. The colmnn was assumed to be a composite cylinder. Therefore the torsion fracture problem of a composite cylinder was considered, and new boundary integral equations for the Saint-Venant torsion problem of a composite cylinder with curvilinear cracks were derived. The problem was re- duced to solving the boundary integral equations on every boundary. By using the new boundary element method, the torsion prob- lem of the gravity platform colunm with a straight crack under various wind loads was calculated. The obtained results were com- pared with those obtained for a torsion problem of the same column without cracks to prove the applicability of the present method. The comparison showed that the detrimental effect of cracks in a column should be considered in marine engineering.展开更多
The construction of the bridge across Taiwan Strait has been studied for a long time and the feasibility study that has attracted attention among scientists and engineers on both sides of the Taiwan Strait[1-4].The ke...The construction of the bridge across Taiwan Strait has been studied for a long time and the feasibility study that has attracted attention among scientists and engineers on both sides of the Taiwan Strait[1-4].The key question is whether this bridge and dike-road across Taiwan Strait can be constructed with present technology under such complex geological conditions or not.The results of current researches indicate that the sea floor of the Strait is covered with a horizontal layer composed of both the Pleistocene and the Holocene sandstone and shale with a thickness of about 200~300m.The distance from Pingtan island to China's Xinzhu seashore is 124 km,which might be connected by 4-6 section bridges and 5-7 section of dike-roads,and serve as a best program of the route in the north Strait section.The NE offshore fault along the Fujian coast and that along the west coast of Taiwan,China are the major tectonic lines separated by several NW faults under the upper horizontal layer,these fault 3D feature may be detecting by geo-tomography technique,which can help to deal with the foundation of bridge and dike-road piers.It is judged that the construction of bridge and dike-road beginning from Pingtan to the China's Xinzhu seashore is worth recommendation.In the procedure of the construction of large and high height bridges,must consider the steel structural member be detected by industrial CT technology,and might detect the pier of bridge and dike-road which built by steel tube and reinforced concrete at dike-roads two side,in order to get the hard basement and getting the depth of the pier extend below the sea-floor by the seismic tomographic detection method.展开更多
基金supported by the National High-Technology Research and Development Program of China (No.2007AA09Z317)
文摘Ocean platforms are subjected to a variety of environment loads, such as those from winds, waves, currents, etc. In this study, the torsion problems of a gravity platform column with cracks under wind load were investigated. The colmnn was assumed to be a composite cylinder. Therefore the torsion fracture problem of a composite cylinder was considered, and new boundary integral equations for the Saint-Venant torsion problem of a composite cylinder with curvilinear cracks were derived. The problem was re- duced to solving the boundary integral equations on every boundary. By using the new boundary element method, the torsion prob- lem of the gravity platform colunm with a straight crack under various wind loads was calculated. The obtained results were com- pared with those obtained for a torsion problem of the same column without cracks to prove the applicability of the present method. The comparison showed that the detrimental effect of cracks in a column should be considered in marine engineering.
文摘The construction of the bridge across Taiwan Strait has been studied for a long time and the feasibility study that has attracted attention among scientists and engineers on both sides of the Taiwan Strait[1-4].The key question is whether this bridge and dike-road across Taiwan Strait can be constructed with present technology under such complex geological conditions or not.The results of current researches indicate that the sea floor of the Strait is covered with a horizontal layer composed of both the Pleistocene and the Holocene sandstone and shale with a thickness of about 200~300m.The distance from Pingtan island to China's Xinzhu seashore is 124 km,which might be connected by 4-6 section bridges and 5-7 section of dike-roads,and serve as a best program of the route in the north Strait section.The NE offshore fault along the Fujian coast and that along the west coast of Taiwan,China are the major tectonic lines separated by several NW faults under the upper horizontal layer,these fault 3D feature may be detecting by geo-tomography technique,which can help to deal with the foundation of bridge and dike-road piers.It is judged that the construction of bridge and dike-road beginning from Pingtan to the China's Xinzhu seashore is worth recommendation.In the procedure of the construction of large and high height bridges,must consider the steel structural member be detected by industrial CT technology,and might detect the pier of bridge and dike-road which built by steel tube and reinforced concrete at dike-roads two side,in order to get the hard basement and getting the depth of the pier extend below the sea-floor by the seismic tomographic detection method.