期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
合水站址迁移前后主要气象要素对比分析 被引量:6
1
作者 李仲龙 陈学君 +1 位作者 李腊平 陆登荣 《陕西气象》 2014年第6期35-39,共5页
对甘肃合水气象站2013年站址迁移前后对比观测资料中的气温、降水、风、相对湿度等主要气象要素利用差值、风向相符率、显著性检验等方法进行对比分析,发现合水新站的日平均气温、日最高气温、日最低气温低于旧站;新站4—6月降水量小于... 对甘肃合水气象站2013年站址迁移前后对比观测资料中的气温、降水、风、相对湿度等主要气象要素利用差值、风向相符率、显著性检验等方法进行对比分析,发现合水新站的日平均气温、日最高气温、日最低气温低于旧站;新站4—6月降水量小于旧站,7—10月降水量大于旧站;新站平均风速大于旧站,全年风向相符率为30.5%,两站风向差异明显;新站1、2、12月相对湿度小于旧站,其它各月大于旧站,而新站最小相对湿度小于旧站。新、旧站温度、相对湿度在均值和方差方面均无显著性差异,可用新站观测数据替代旧站使用。 展开更多
关键词 气象观测 数据差异 对比分析 合水站
下载PDF
Research and practice of designing hydro/ photovoltaic hybrid power system in microgrid 被引量:2
2
作者 Wang Yibo Xu Honghua 《Engineering Sciences》 EI 2013年第3期80-84,96,共6页
Small-hydro power station is often used in remote areas beside a river,but it doesn't match electricity demand so well,especially in dry seasons. A photovoltaic (PV) system with battery is a suitable option to com... Small-hydro power station is often used in remote areas beside a river,but it doesn't match electricity demand so well,especially in dry seasons. A photovoltaic (PV) system with battery is a suitable option to complement the electricity gap. In this paper,a new structure of megawatt-class PV system integrating battery at DC-bus (DC: direct current) is proposed to be used in hydro/PV hybrid power system,and 4 main designing considerations and several key equipments are discussed. In 2011,a 2 MWp PV station with the proposed structure was built up in Yushu,China. From stability analysis,the station shows a strong stability under load cut-in/off and solar irradiance's fluctuation. 展开更多
关键词 photovoltaic system with battery hydro/PV hybrid power system isolated microgrid
下载PDF
Profit-Based Optimal Operation of a Head-Dependent Hydroelectric Power Station in the Bilateral Market
3
作者 S.J.P.S. Mariano M.R.A. Calado L.A.F.M. Ferreira 《Journal of Energy and Power Engineering》 2011年第5期466-473,共8页
Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants a... Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants are being faced with requirements for which they do not have adequate training and the proper software tools. In this framework, among others, a pure hydro-generation company has to operate its hydro units, throughout the operating day, trying to fulfill the market clearing schedule or a bilateral contract, and modify the program in the intra-day energy markets if necessary (or more suitable) as real-time operation is getting closer. In this scenario the objective is to maximize the hydroelectric power plant profit from selling energy in the spot market or by means of bilateral contracts. In this paper the optimal operation of a head-dependent hydroelectric power station in bilateral market-short-term hourly hydro resource scheduling for energy is obtained. 展开更多
关键词 Hydroelectric power generation hydroelectric generators optimization methods electricity market.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部