A top-down design methodology is proposed for the design of TFT-LCD one-chip driver ICs,and a 260k color, 176RGB× 220-dot TFT-LCD one-chip driver IC is successfully developed with silicon verification. This IC is...A top-down design methodology is proposed for the design of TFT-LCD one-chip driver ICs,and a 260k color, 176RGB× 220-dot TFT-LCD one-chip driver IC is successfully developed with silicon verification. This IC is a typical mixed-signal VLSI and is implemented by a 0.18μm HV CMOS process. The static power dissipation is about 5mW for 260k color display mode,and the settling time of the output grayscale voltages within 0.2% error is less than 26μs.展开更多
An explicit congestion notification (ECN)-based distributed transport protocol,ARROW-WTCP (AcceleRate tRansmission towards Optimal Window size TCP for Wireless network),was proposed.The ARROW-WTCP enables feasible dep...An explicit congestion notification (ECN)-based distributed transport protocol,ARROW-WTCP (AcceleRate tRansmission towards Optimal Window size TCP for Wireless network),was proposed.The ARROW-WTCP enables feasible deployment of ARROW-TCP from wired to wireless networks by providing a joint design of source and router algorithms.The protocol obtains the actual capacity of the wireless channel by calculating the queue variation in base station (BS) and adjusts the congestion window by using the feedback from its bottleneck link.The simulation results show that the ARROW-WTCP achieves strong stability,max-min fairness in dynamic networks,fast convergence to efficiency without introducing much excess traffic,and almost full link utilization in the steady state.It outperforms the XCP-B (eXplicit Control Protocol Blind),the wireless version of XCP,in terms of stability,fairness,convergence and utilization in wireless networks.展开更多
Pile-slab structure roadbed is a new form of ballastless track for high speed railway. Due to lack of corresponding design code, based on the analysis of its structure characteristics and application requirements, it ...Pile-slab structure roadbed is a new form of ballastless track for high speed railway. Due to lack of corresponding design code, based on the analysis of its structure characteristics and application requirements, it is proposed to carry out load effect combination according to ultimate limit state and serviceability limit state, and the most unfavorable combination of each state is chosen to carry through design calculation for pile-slab structure. Space model of pile-slab structure can be simplified as a plane flame model, by using the orthogonal test method, and the design parameter of pile-slab structure is optimized. Moreover, based on the engineering background of Suining-Chongqing high-speed railway, the dynamic deformation characteristics of pile-slab structure roadbed are further researched by carrying on the indoor dynamic model test. The test results show that the settlement after construction of subgrade satisfies the requirement of settlement control to build ballastless track on soil subgrade for high-speed railway. Slab structure plays the role of arch shell as load is transmitted from slab to pile, and the vertical dynamic stress of subgrade soil is approximately of "K" form distribution with the depth. The distribution of pile stress is closely related to soil characteristics, which has an upset triangle shape where the large dynamic stress is at the top. Pile compared with soil shares most dynamic stress. Pile structure expands the depth of the dynamic response of subgrade has limited effect on dynamic response. These results can provide subgrade. and improves the stress of subgrade soil, and the speed of train scientific basis for pile-slab structure roadbed used on soil展开更多
文摘A top-down design methodology is proposed for the design of TFT-LCD one-chip driver ICs,and a 260k color, 176RGB× 220-dot TFT-LCD one-chip driver IC is successfully developed with silicon verification. This IC is a typical mixed-signal VLSI and is implemented by a 0.18μm HV CMOS process. The static power dissipation is about 5mW for 260k color display mode,and the settling time of the output grayscale voltages within 0.2% error is less than 26μs.
基金Projects(60873265,60903222) supported by the National Natural Science Foundation of China Project(IRT0661) supported by the Program for Changjiang Scholars and Innovative Research Team in University of China
文摘An explicit congestion notification (ECN)-based distributed transport protocol,ARROW-WTCP (AcceleRate tRansmission towards Optimal Window size TCP for Wireless network),was proposed.The ARROW-WTCP enables feasible deployment of ARROW-TCP from wired to wireless networks by providing a joint design of source and router algorithms.The protocol obtains the actual capacity of the wireless channel by calculating the queue variation in base station (BS) and adjusts the congestion window by using the feedback from its bottleneck link.The simulation results show that the ARROW-WTCP achieves strong stability,max-min fairness in dynamic networks,fast convergence to efficiency without introducing much excess traffic,and almost full link utilization in the steady state.It outperforms the XCP-B (eXplicit Control Protocol Blind),the wireless version of XCP,in terms of stability,fairness,convergence and utilization in wireless networks.
基金Foundation item: Project(2013CB036405) supported by the National Basic Research Program of China Project(KZZD-EW-05) supported by the Key Research Program of the Chinese Academy of Sciences
文摘Pile-slab structure roadbed is a new form of ballastless track for high speed railway. Due to lack of corresponding design code, based on the analysis of its structure characteristics and application requirements, it is proposed to carry out load effect combination according to ultimate limit state and serviceability limit state, and the most unfavorable combination of each state is chosen to carry through design calculation for pile-slab structure. Space model of pile-slab structure can be simplified as a plane flame model, by using the orthogonal test method, and the design parameter of pile-slab structure is optimized. Moreover, based on the engineering background of Suining-Chongqing high-speed railway, the dynamic deformation characteristics of pile-slab structure roadbed are further researched by carrying on the indoor dynamic model test. The test results show that the settlement after construction of subgrade satisfies the requirement of settlement control to build ballastless track on soil subgrade for high-speed railway. Slab structure plays the role of arch shell as load is transmitted from slab to pile, and the vertical dynamic stress of subgrade soil is approximately of "K" form distribution with the depth. The distribution of pile stress is closely related to soil characteristics, which has an upset triangle shape where the large dynamic stress is at the top. Pile compared with soil shares most dynamic stress. Pile structure expands the depth of the dynamic response of subgrade has limited effect on dynamic response. These results can provide subgrade. and improves the stress of subgrade soil, and the speed of train scientific basis for pile-slab structure roadbed used on soil