The influence of main process parameters on simultaneous nitrification and denitrification (SND) in a sequencing batch reactor (SBR) were investigated while treating actual municipal sewage. The influent average c...The influence of main process parameters on simultaneous nitrification and denitrification (SND) in a sequencing batch reactor (SBR) were investigated while treating actual municipal sewage. The influent average concentration of CODcr and total nitrogen was 350mg-L-l and 35mg.L-l. The experiment indicated the following four operation control strategies: (1) When operation cycle was 6 hours, oxidation of organic pollutants and simultaneous nitrification and denitrification could well completed in the SBR reactor; (2) TN removal rate could be increased significantly, 40% higher than traditional SBR processes when idle period was set between influent and aeration; (3) The time of idle period could affect simultaneous nitrification and denitrification and the best time is 30 minutes; (4) Increase of sludge organic load may improve TN removal efficiency, but NH3-N removal efficiency declines.展开更多
文摘The influence of main process parameters on simultaneous nitrification and denitrification (SND) in a sequencing batch reactor (SBR) were investigated while treating actual municipal sewage. The influent average concentration of CODcr and total nitrogen was 350mg-L-l and 35mg.L-l. The experiment indicated the following four operation control strategies: (1) When operation cycle was 6 hours, oxidation of organic pollutants and simultaneous nitrification and denitrification could well completed in the SBR reactor; (2) TN removal rate could be increased significantly, 40% higher than traditional SBR processes when idle period was set between influent and aeration; (3) The time of idle period could affect simultaneous nitrification and denitrification and the best time is 30 minutes; (4) Increase of sludge organic load may improve TN removal efficiency, but NH3-N removal efficiency declines.