This paper presents an analytical procedure for massive water-sealing barriers(MWSBs)that are made of partially overlapped jet-grouting columns used for deep excavations,in which two crucial factors of the permeabilit...This paper presents an analytical procedure for massive water-sealing barriers(MWSBs)that are made of partially overlapped jet-grouting columns used for deep excavations,in which two crucial factors of the permeability and strength of jet-grouted materials are considered.Subsequently,a calculation example is analyzed and discussed.Results show that“tension failure”mechanism is a major concern for the structural failure during a design of MWSBs.The maximum allowable seepage discharge is a crucial index for the design of MWSBs,which has a significant influence on determining the design parameters of MWSBs.Compared with the design procedure for MWSBs that is proposed in this paper,the design parameters of MWSBs determined by the stability equilibrium and seepage stability equilibrium approaches are conservative due to the fact that it fails to consider the permeability or strength of jet-grouted materials that makes a contribution to the structural safety.Based on the proposed design method,the ranges of both the thickness and depth of MWSBs for a case history of subway excavation in Fuzhou,China were determined.Finally,field pumping test results showed that the water-tightness performance of MWSBs performed at site was quite well.展开更多
Based on the hydro-geological conditions of 1028 mining face in Suntuan Coal Mine, mining seepage strain mechanism of seam floor was simulated by a nonlinear coupling method, which applied fluid-solid coupling analysi...Based on the hydro-geological conditions of 1028 mining face in Suntuan Coal Mine, mining seepage strain mechanism of seam floor was simulated by a nonlinear coupling method, which applied fluid-solid coupling analysis module of FLAC^3D. The results indicate that the permeability coefficient of adjoining rock changes a lot due to mining. The maximum value reaches 1 379.9 times to the original value, where it is at immediate roof of the mined-out area. According to the analysis on the seepage field, mining does not destroy water resistance of the floor aquiclude. The mining fissure does not conduct lime-stone aquifer, and it is less likely to form damage. The plastic zone does not exactly correspond to the seepage area, and the scope of the altered seepage area is much larger than the plastic zone.展开更多
During the construction of the south caisson anchorage of Taizhou Bridge, the drainage area is located in the lower reaches of the Yangtze River and the permeability of stratums there is considerable. In order to main...During the construction of the south caisson anchorage of Taizhou Bridge, the drainage area is located in the lower reaches of the Yangtze River and the permeability of stratums there is considerable. In order to maintain progress and guarantee safety during the sinking of the caisson, water should be drained in the initial period. Subsequently, detailed information about the aquifer permeability is required to make sure that the drainage will proceed successfully, which consequently necessitates the on-site estimation of the aquifer permeability in the drainage area. Therefore, the traditional pumping test and slug test are implemented respectively on site. The comparison of computational results of these two tests indicates that they are consistent overall. Notwithstanding, as slug test can be conducted with portable facilities in a short time and the manipulation is easy and few people need to be involved, the advantages of slug test is conspicuous compared with the traditional pumping test. It could be speculated that slug test will gain a prevalent application in the measurement of aquifer permeability in the future.展开更多
基金Projects(52090084, 51938008) supported by the National Natural Science Foundation of ChinaProject(2021T140474)supported by the China Postdoctoral Science Foundation。
文摘This paper presents an analytical procedure for massive water-sealing barriers(MWSBs)that are made of partially overlapped jet-grouting columns used for deep excavations,in which two crucial factors of the permeability and strength of jet-grouted materials are considered.Subsequently,a calculation example is analyzed and discussed.Results show that“tension failure”mechanism is a major concern for the structural failure during a design of MWSBs.The maximum allowable seepage discharge is a crucial index for the design of MWSBs,which has a significant influence on determining the design parameters of MWSBs.Compared with the design procedure for MWSBs that is proposed in this paper,the design parameters of MWSBs determined by the stability equilibrium and seepage stability equilibrium approaches are conservative due to the fact that it fails to consider the permeability or strength of jet-grouted materials that makes a contribution to the structural safety.Based on the proposed design method,the ranges of both the thickness and depth of MWSBs for a case history of subway excavation in Fuzhou,China were determined.Finally,field pumping test results showed that the water-tightness performance of MWSBs performed at site was quite well.
文摘Based on the hydro-geological conditions of 1028 mining face in Suntuan Coal Mine, mining seepage strain mechanism of seam floor was simulated by a nonlinear coupling method, which applied fluid-solid coupling analysis module of FLAC^3D. The results indicate that the permeability coefficient of adjoining rock changes a lot due to mining. The maximum value reaches 1 379.9 times to the original value, where it is at immediate roof of the mined-out area. According to the analysis on the seepage field, mining does not destroy water resistance of the floor aquiclude. The mining fissure does not conduct lime-stone aquifer, and it is less likely to form damage. The plastic zone does not exactly correspond to the seepage area, and the scope of the altered seepage area is much larger than the plastic zone.
基金Special Fund of"333"High Level Talent Training Project of Jiangsu ProvinceNational Scienceand Technology Support Program of China ( No. 2009BAG15B02) Key Programs for Science and Technology De-velopment of Chinese Transportation Industry( No. 2008-353-332-150)
文摘During the construction of the south caisson anchorage of Taizhou Bridge, the drainage area is located in the lower reaches of the Yangtze River and the permeability of stratums there is considerable. In order to maintain progress and guarantee safety during the sinking of the caisson, water should be drained in the initial period. Subsequently, detailed information about the aquifer permeability is required to make sure that the drainage will proceed successfully, which consequently necessitates the on-site estimation of the aquifer permeability in the drainage area. Therefore, the traditional pumping test and slug test are implemented respectively on site. The comparison of computational results of these two tests indicates that they are consistent overall. Notwithstanding, as slug test can be conducted with portable facilities in a short time and the manipulation is easy and few people need to be involved, the advantages of slug test is conspicuous compared with the traditional pumping test. It could be speculated that slug test will gain a prevalent application in the measurement of aquifer permeability in the future.