期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
回采井选井方法的改进
1
作者 Щ.,АА 黎发文 《油气田开发工程译丛》 北大核心 1990年第2期10-11,共2页
关键词 回采井 油田开发
下载PDF
A numerical evaluation of continuous backfilling in cemented paste backfilled stope through an application of wick drains 被引量:2
2
作者 Li Li Yang Pengyu 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第6期897-904,共8页
Cemented paste backfill (CPB) is gaining popularity in many underground mines worldwide. Sufficient water is added into CPB to make a flowable material for pipe transportation. Barricades are built near the drawpoin... Cemented paste backfill (CPB) is gaining popularity in many underground mines worldwide. Sufficient water is added into CPB to make a flowable material for pipe transportation. Barricades are built near the drawpoints to prevent in-rush of the fill slurry. To avoid barricade failures resulting from excessive backfill pressures, backfilling is typically performed with a plug pour followed by a final pour. The interval between the two pours should be shortened or removed to increase mining productivity and avoid pipe clogging. Recently, Li proposed to apply wick drains in backfilled stopes to promote drainage and consolidation. The preliminary simulations by considering an instantaneous filling indicated that the drainage of CPB can be significantly accelerated by using wick drains. Barricade was not considered. Here, some new numerical modeUings are presented with more representative filling sequences, stope geometry, and different draining configurations. The results illustrate that the stope can be backfilled continuously by using wick drains. 展开更多
关键词 Mines Cemented paste backfill Backfilled stopes Numerical analyses Drainage Wick drains
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部