For the Guanshui Road Station tunnel project of Guiyang Metro Line 2,the wind pavilion group was moved out of the main tunnel to reduce the number of openings in the main tunnel,and the wind pavilion group was excavat...For the Guanshui Road Station tunnel project of Guiyang Metro Line 2,the wind pavilion group was moved out of the main tunnel to reduce the number of openings in the main tunnel,and the wind pavilion group was excavated in a triangular configuration at the entrance of the main tunnel.Based on the finite element software ABAQUS,a three-dimensional model is established to study the influence of different triangular-distribution tunnels excavation schemes on the surface settlement and tunnel stability.The objective of this study is to reveal the change rules of surface settlement,deformation and force in the support structures and the surrounding rock and identify the best excavation scheme for this tunnel configuration.Results show that to control the surface settlement and the deformation of the support structures,the optimal excavation sequence involves excavating the upper fresh air exhaust tunnel before the lower running tunnel.To control the stress of the support structures,the optimal excavation involves excavating the lower running tunnel before the upper fresh air exhaust tunnel.In this project,the most reasonable excavation sequence of the tunnel is from top to bottom.The most reasonable thickness of tunnel penetration is 5 m.展开更多
Aiming to effectively solve the problem of deep mining with safety and high efficiency, according to geological conditions, production and stress analysis in roadway surrounding rock, experimental studies on roadway s...Aiming to effectively solve the problem of deep mining with safety and high efficiency, according to geological conditions, production and stress analysis in roadway surrounding rock, experimental studies on roadway supporting of workface 103 under three types of roof conditions with different supporting technologies and parameters were carried out based on the theory of supporting technology of gob-side entry. The results show the supporting of gob-side entry retaining is successful, and the deep surrounding rock is effectively controlled by field monitoring and drilling-hole photos. After stress in surrounding rock of roadways restores stable, the final roadway deformation of surrounding rock of haulage roadway and air-roadway are both about 300 mm; width of gob-side entry is 3.8-4.0 m and average height is 2.0-2.2 m; roadway section is above 8.0 m^2, which solves the problems of gob-side entry retaining support strength and safe mining; necessary conditions of mining safety in workface 103 are met.展开更多
Based on the characteristics of the deep circular tunnel, the surrounding rock was divided into three regions: the cracked region, the plastic region and the viscoelastic region. The process of rock stress deformatio...Based on the characteristics of the deep circular tunnel, the surrounding rock was divided into three regions: the cracked region, the plastic region and the viscoelastic region. The process of rock stress deformation and change was divided into three stages after the roadway excavation. By using the elastic-plastic mechanics theory, the analytical solutions of the surrounding stress and displacement at different stages and the radii of cracked and plastic regions were formulated. We additionally explained the surrounding rock stress and displacement which appeared in practical project. Simultaneously, based on the problem which emerged from a mine in Xuzhou during the excavating process of rock roadway's transport, we got the theoretical solutions for the stress and displacement in the process of rock roadway's excavation and considered that the broken area of rock roadway was largely loosing circle. The results indicate that according to the rheological characteristics of surrounding rock, in the primeval excavation of rock roadway, we should increase the length of anchor bolt and cooperate it with anchor nets cable-U steel supporting frame. In addition, when the deformation rate of the surrounding rock is descending after the 15 days' excavation, we should use the "three anchor" supporting method (anchor bolt spray, anchor note and anchor rove) and set aside about 20 cm as the reserved deformation laver.展开更多
In order to determine how a roadway withstands a momentum wave and determinethe extent of damage to rock surrounding the roadway under different force wavepeak impacts,the roadway dynamic response state was analysed u...In order to determine how a roadway withstands a momentum wave and determinethe extent of damage to rock surrounding the roadway under different force wavepeak impacts,the roadway dynamic response state was analysed using numerical simulationmethod.The roadway's critical peak force wave and fracture region under dynamicwave action were put forward.It is concluded that the method has practical value to roadwaysupport and rockburst prevention.展开更多
基金Projects(B200204032,2019B07914)supported by the Fundamental Research Funds for the Central Universities,ChinaProjects(51878667,51678571,51808193)supported by the National Natural Science Foundation of China。
文摘For the Guanshui Road Station tunnel project of Guiyang Metro Line 2,the wind pavilion group was moved out of the main tunnel to reduce the number of openings in the main tunnel,and the wind pavilion group was excavated in a triangular configuration at the entrance of the main tunnel.Based on the finite element software ABAQUS,a three-dimensional model is established to study the influence of different triangular-distribution tunnels excavation schemes on the surface settlement and tunnel stability.The objective of this study is to reveal the change rules of surface settlement,deformation and force in the support structures and the surrounding rock and identify the best excavation scheme for this tunnel configuration.Results show that to control the surface settlement and the deformation of the support structures,the optimal excavation sequence involves excavating the upper fresh air exhaust tunnel before the lower running tunnel.To control the stress of the support structures,the optimal excavation involves excavating the lower running tunnel before the upper fresh air exhaust tunnel.In this project,the most reasonable excavation sequence of the tunnel is from top to bottom.The most reasonable thickness of tunnel penetration is 5 m.
文摘Aiming to effectively solve the problem of deep mining with safety and high efficiency, according to geological conditions, production and stress analysis in roadway surrounding rock, experimental studies on roadway supporting of workface 103 under three types of roof conditions with different supporting technologies and parameters were carried out based on the theory of supporting technology of gob-side entry. The results show the supporting of gob-side entry retaining is successful, and the deep surrounding rock is effectively controlled by field monitoring and drilling-hole photos. After stress in surrounding rock of roadways restores stable, the final roadway deformation of surrounding rock of haulage roadway and air-roadway are both about 300 mm; width of gob-side entry is 3.8-4.0 m and average height is 2.0-2.2 m; roadway section is above 8.0 m^2, which solves the problems of gob-side entry retaining support strength and safe mining; necessary conditions of mining safety in workface 103 are met.
基金provided by the National Basic Research Program of China (No. 2007CB209408)the National Natural Science Foundation of China (No. 51074166)the Research Innovation Program for College Graduates of Jiangsu (No.CX098B_108Z)
文摘Based on the characteristics of the deep circular tunnel, the surrounding rock was divided into three regions: the cracked region, the plastic region and the viscoelastic region. The process of rock stress deformation and change was divided into three stages after the roadway excavation. By using the elastic-plastic mechanics theory, the analytical solutions of the surrounding stress and displacement at different stages and the radii of cracked and plastic regions were formulated. We additionally explained the surrounding rock stress and displacement which appeared in practical project. Simultaneously, based on the problem which emerged from a mine in Xuzhou during the excavating process of rock roadway's transport, we got the theoretical solutions for the stress and displacement in the process of rock roadway's excavation and considered that the broken area of rock roadway was largely loosing circle. The results indicate that according to the rheological characteristics of surrounding rock, in the primeval excavation of rock roadway, we should increase the length of anchor bolt and cooperate it with anchor nets cable-U steel supporting frame. In addition, when the deformation rate of the surrounding rock is descending after the 15 days' excavation, we should use the "three anchor" supporting method (anchor bolt spray, anchor note and anchor rove) and set aside about 20 cm as the reserved deformation laver.
基金Supported by the National Key Technology R&D Program in 11 th Five Years Plan of China(2006BAK03B06)
文摘In order to determine how a roadway withstands a momentum wave and determinethe extent of damage to rock surrounding the roadway under different force wavepeak impacts,the roadway dynamic response state was analysed using numerical simulationmethod.The roadway's critical peak force wave and fracture region under dynamicwave action were put forward.It is concluded that the method has practical value to roadwaysupport and rockburst prevention.