In order to exactly provide scientific basis for pressure dynamic balance control of working chamber of earth pressure balance shield (EPBS),study on optimal arrangement of pressure measurement points in working chamb...In order to exactly provide scientific basis for pressure dynamic balance control of working chamber of earth pressure balance shield (EPBS),study on optimal arrangement of pressure measurement points in working chamber was conducted. Based on mathematical description of optimal arrangement for pressure measurement points,fuzzy clustering analysis and discriminant analysis were used to divide pressure regions of nodes on bulkhead. Finally,the selection method of optimal measurement points was proposed,and by selecting d6.28 m EPBS as study object,the case study was conducted. By contrast,based on optimal arrangement scheme of pressure measurement points,through adopting weighted algorithm,the absolute error mean of equivalent pressure of working chamber is the smallest. In addition,pressure curve of optimal arrangement points presents parabola,and it can show the state of pressure distribution on bulkhead truly. It is concluded that the optimal arrangement method of pressure measurement points in working chamber is effective and feasible,and the method can provide basis for realizing high precision pressure control of EPBS.展开更多
The back analysis of initial stress is usually based on measured stress values, but the measuring of initial stress demands substantial investment. Therefore, amounts of underground engineering have no measured initia...The back analysis of initial stress is usually based on measured stress values, but the measuring of initial stress demands substantial investment. Therefore, amounts of underground engineering have no measured initial stress data, such as tunneling engineering. Focusing on this problem, a new back analysis method which does not need measured initial stress data is developed. The fault is assumed to be caused by initial load, the displacement discontinuity method (DDM) which considered non-linear fault is adopted to establish a numerical model of the engineering site, and the multivariable regression analysis of the initial stress field around the faults is carried out based on the fault throw. The result shows that the initial stress field around the faults is disturbed significantly, stress concentration appears in the tip zone, the regressive fault throw matches the measured values well, and the regressive initial stress field is reliable.展开更多
基金Project(2007CB714006) supported by the National Basic Research Program of China
文摘In order to exactly provide scientific basis for pressure dynamic balance control of working chamber of earth pressure balance shield (EPBS),study on optimal arrangement of pressure measurement points in working chamber was conducted. Based on mathematical description of optimal arrangement for pressure measurement points,fuzzy clustering analysis and discriminant analysis were used to divide pressure regions of nodes on bulkhead. Finally,the selection method of optimal measurement points was proposed,and by selecting d6.28 m EPBS as study object,the case study was conducted. By contrast,based on optimal arrangement scheme of pressure measurement points,through adopting weighted algorithm,the absolute error mean of equivalent pressure of working chamber is the smallest. In addition,pressure curve of optimal arrangement points presents parabola,and it can show the state of pressure distribution on bulkhead truly. It is concluded that the optimal arrangement method of pressure measurement points in working chamber is effective and feasible,and the method can provide basis for realizing high precision pressure control of EPBS.
基金the Western Transport Construction Science and Technology Project of the Ministry of Transport of the People's Republic of China(No.2009318000046)
文摘The back analysis of initial stress is usually based on measured stress values, but the measuring of initial stress demands substantial investment. Therefore, amounts of underground engineering have no measured initial stress data, such as tunneling engineering. Focusing on this problem, a new back analysis method which does not need measured initial stress data is developed. The fault is assumed to be caused by initial load, the displacement discontinuity method (DDM) which considered non-linear fault is adopted to establish a numerical model of the engineering site, and the multivariable regression analysis of the initial stress field around the faults is carried out based on the fault throw. The result shows that the initial stress field around the faults is disturbed significantly, stress concentration appears in the tip zone, the regressive fault throw matches the measured values well, and the regressive initial stress field is reliable.