Starting with the Ertan arch dam (240 m high, 3300 MW) in 2000, China successfully built a total of seven ultra-high arch dams over 200 m tall by the end of 2014. Among these, the ]inping 1 (305 m), Xiaowan (294...Starting with the Ertan arch dam (240 m high, 3300 MW) in 2000, China successfully built a total of seven ultra-high arch dams over 200 m tall by the end of 2014. Among these, the ]inping 1 (305 m), Xiaowan (294.5m), and Xiluodu (285.5 m) arch dams have reached the 300 m height level (i.e., near or over 300 m), making them the tallest arch dams in the world. The design and construction of these 300 m ultra-high arch dams posed significant challenges, due to high water pressures, high seismic de- sign criteria, and complex geological conditions. The engineering team successfully tackled these chal- lenges and made critical breakthroughs, especially in the area of safety control. In this paper, the author summarizes various key technological aspects involved in the design and construction of 300 m ultra- high arch dams, including the strength and stability of foundation rock, excavation of the dam base and surface treatment, dam shape optimization, safety design guidelines, seismic analysis and design, treatment of a complex foundation, concrete temperature control, and crack prevention. The experience gained from these projects should be valuable for future practitioners.展开更多
In order to investigate the seismic performance of geosynthetic reinforced and pile supported(GRPS) embankment under seismic loads, an input method for three-dimensional oblique incidence of P wave was proposed. This ...In order to investigate the seismic performance of geosynthetic reinforced and pile supported(GRPS) embankment under seismic loads, an input method for three-dimensional oblique incidence of P wave was proposed. This method is based on the explicit finite element method while considering the viscous-spring artificial boundary(VSAB) condition. Using the proposed method, a numerical study was conducted, and the influence of oblique incidence on the seismic response of GRPS embankment under the oblique incident P waves was analyzed. The results indicate that in comparison with vertical incidence, the oblique incidence can significantly increase the displacement, velocity and acceleration of key locations in the GRPS embankment. The existence of geosynthetics can alleviate the impact of seismic load on the response of the embankment to a certain degree. Moreover, the number of reinforcement layers and modulus of geogrid also greatly influence the seismic performance of GRPS embankment.展开更多
文摘Starting with the Ertan arch dam (240 m high, 3300 MW) in 2000, China successfully built a total of seven ultra-high arch dams over 200 m tall by the end of 2014. Among these, the ]inping 1 (305 m), Xiaowan (294.5m), and Xiluodu (285.5 m) arch dams have reached the 300 m height level (i.e., near or over 300 m), making them the tallest arch dams in the world. The design and construction of these 300 m ultra-high arch dams posed significant challenges, due to high water pressures, high seismic de- sign criteria, and complex geological conditions. The engineering team successfully tackled these chal- lenges and made critical breakthroughs, especially in the area of safety control. In this paper, the author summarizes various key technological aspects involved in the design and construction of 300 m ultra- high arch dams, including the strength and stability of foundation rock, excavation of the dam base and surface treatment, dam shape optimization, safety design guidelines, seismic analysis and design, treatment of a complex foundation, concrete temperature control, and crack prevention. The experience gained from these projects should be valuable for future practitioners.
基金Projects(41202220,41472278,51478438)supported by the National Natural Science Foundation of ChinaProjects(20120022120003,20134101120009)supported by the Research Fund for the Doctoral Program of Higher Education,China+1 种基金Project(2652012065)supported by the Fundamental Research Funds for the Central Universities,ChinaProject(14A560014)supported by the Key Project of Education Department in Henan Province,China
文摘In order to investigate the seismic performance of geosynthetic reinforced and pile supported(GRPS) embankment under seismic loads, an input method for three-dimensional oblique incidence of P wave was proposed. This method is based on the explicit finite element method while considering the viscous-spring artificial boundary(VSAB) condition. Using the proposed method, a numerical study was conducted, and the influence of oblique incidence on the seismic response of GRPS embankment under the oblique incident P waves was analyzed. The results indicate that in comparison with vertical incidence, the oblique incidence can significantly increase the displacement, velocity and acceleration of key locations in the GRPS embankment. The existence of geosynthetics can alleviate the impact of seismic load on the response of the embankment to a certain degree. Moreover, the number of reinforcement layers and modulus of geogrid also greatly influence the seismic performance of GRPS embankment.