期刊文献+
共找到7篇文章
< 1 >
每页显示 20 50 100
土石坝浇筑式沥青混凝土防渗心墙施工新技术的应用 被引量:5
1
作者 付明 《黑龙江水利科技》 2013年第6期34-36,共3页
随着我国大中小型水利水电工程的不断发展,土石坝浇筑式沥青混凝土防渗心墙施工新技术得以广泛推广和应用,既消除了传统混凝土工程中的分层离析现象,既提高了混凝土整体的均匀性,又可以保证混凝土防渗心墙的可靠性与安全性。本文针对土... 随着我国大中小型水利水电工程的不断发展,土石坝浇筑式沥青混凝土防渗心墙施工新技术得以广泛推广和应用,既消除了传统混凝土工程中的分层离析现象,既提高了混凝土整体的均匀性,又可以保证混凝土防渗心墙的可靠性与安全性。本文针对土石坝浇筑式沥青混凝土防渗心墙施工新技术的研究与应用作了四个方面的探讨。 展开更多
关键词 石坝浇筑 沥青混凝 防渗心墙 施工新技术 研究应用
下载PDF
水厂水池的大体积墙板混凝土施工
2
作者 王如森 《广东科技》 2007年第10X期32-33,共2页
对于水厂水池大体积墙壁板混凝土的施工,模板的设计和施工相当重要,这不仅直接影响单位的经济效益,而且还影响混凝土的浇筑质量,甚至还会影响到工程安全问题。
关键词 施工 水池 模板 混凝 土浇筑
下载PDF
Key technologies for the construction of the Xiluodu high arch dam on the Jinsha River in the development of hydropower in western China 被引量:3
3
作者 Lu Youmei Fan Qixiang Zhou Shaowu Li Bingfeng Li Wenwei 《Engineering Sciences》 EI 2012年第2期16-28,共13页
Hydropower development in China is concentrated in the country's western regions.Among all the rivers in China,the lower course of the Jinsha River contains the richest hydro-energy resource,and therefore,4 mammot... Hydropower development in China is concentrated in the country's western regions.Among all the rivers in China,the lower course of the Jinsha River contains the richest hydro-energy resource,and therefore,4 mammoth hydropower plants are under construction on this particular section of the river at Wudongde,Baihetan,Xiluodu,and Xiangjiaba.The water-blocking structures of the hydropower facilities at Wudongde,Baihetan and Xiluodu are all arch dams of around 300 m high.In view of changes in the geological conditions at the foundation of the Xiluodu dam on the riverbed after excavation started,the designs of expanding foundation surface excavation and dovetailing the dam body and foundation rock on both upstream and downstream sides were introduced,allowing the arch dam and foundation to fit each other and improving the stress conditions of the dam body and foundation.By dividing the dam body into various concrete sections,the dynamic properties of concrete were adequately adjusted to the distribution of stress in the dam body.In addition,the use of the most optimal concrete material and mixture ratio allowed thermodynamics of concrete to satisfy the requirements of the strength,durability,temperature control and crack prevention of the concrete.Moreover,rigorous temperature control measures were introduced to prevent harmful cracking,thus enhancing the integrity of the arch dam.Furthermore,sophisticated construction machinery,scientific testing methods,and sound construction techniques were employed to ensure the uniformity and reliability of concrete placement.The "Digital Dam" for the Xiluodu project,which is based on the theory of total life cycle,has supplied strong support for construction process control and decision-making. 展开更多
关键词 high arch dam key technologies Xiluodu hydropower development
下载PDF
Crucial technologies in the design of Xiluodu Super High Arch Dam 被引量:3
4
作者 Wang Renkun 《Engineering Sciences》 EI 2012年第2期35-44,55,共11页
Some super high arch dams ( SHADs), like Xiluodu Arch Dam, after their heights reaching the magnitude of 300 m, confront lots of technical challenges in design and construction. Several crucial technologies of 6 SHA... Some super high arch dams ( SHADs), like Xiluodu Arch Dam, after their heights reaching the magnitude of 300 m, confront lots of technical challenges in design and construction. Several crucial technologies of 6 SHADs will be reviewed and discussed in this and consecutive papers, including Xiluodu, Jinping I in China, Baktiary in Iran, ete. , on the topics of the research method, criterion for evaluation and engineering application of dam safety analysis and evaluation, reasonable dam base interface, dam shape optimization, comprehensive treatments of complex foundation, anti-seismic engineering, dam construction material, concrete placement and temperature control, instrumentation and monitoring of dam operation, etc. This paper will mainly focus on the overall safety of SHADs, reasonable dam base interface analysis and evaluation and their engineering application. 展开更多
关键词 overall safety reasonable dam base interface super high arch dam
下载PDF
Determination of initial cable force of cantilever casting concrete arch bridge using stress balance and influence matrix methods 被引量:7
5
作者 TIAN Zhong-chu PENG Wen-ping +2 位作者 ZHANG Jian-ren JIANG Tian-yong DENG Yang 《Journal of Central South University》 SCIE EI CAS CSCD 2019年第11期3140-3155,共16页
Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and inf... Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and influence matrix methods were developed to determine the initial cable force of cantilever casting concrete arch bridge.The stress balance equation and influence matrix of arch rib critical section were established,and the buckle cable force range was determined by the allowable stress of arch rib critical section.Then a group of buckle cable forces were selected and substituted into the stress balance equation,and the reasonable initial buckle cable force was determined through iteration.Based on the principle of force balance,the initial anchor cable force was determined.In an engineering application example,it is shown that the stress balance and influence matrix methods for the determination of initial cable force are feasible and reliable.The initial cable forces of arch rib segments only need to be adjusted once in the corresponding construction process,which improves the working efficiency and reduces the construction risk.It is found that the methods have great advantages for determining initial cable force in cantilever casting construction process of concrete arch bridge. 展开更多
关键词 concrete arch bridge cantilever casting initial cable force stress balance method influence matrix method
下载PDF
Use of ANSYS for Thermal Analysis in Mass Concrete 被引量:2
6
作者 Nailde de Amorim Coelho Lineu Jose Pedroso Joao Henrique da Silva Rego Antonio Alberto Nepomuceno 《Journal of Civil Engineering and Architecture》 2014年第7期860-868,共9页
With the increasing development of Brazil in recent years, major engineering construction works have been designed and built, partieutarly those involving large volumes of mass concrete, such as in the case of dams. M... With the increasing development of Brazil in recent years, major engineering construction works have been designed and built, partieutarly those involving large volumes of mass concrete, such as in the case of dams. Mass concrete, due to its large size and volume, presents a considerable temperature rise caused by cement grain hydration. This temperature rise can be sufficient to cause concrete crack and/or cracking, which may lead to serious problems. In this paper, we sought to study heat generation and temperature field in mass concrete through ANSYS software, which uses finite element method to analyze the problem. This program allows temperatures to be checked for different concrete ages. With that, it is possible to evaluate the temperatures obtained and the factors influencing the results in a short period of time at a low cost. With the help of the software, it is possible to check the temperatures for different concrete properties by analyzing them on different concreting days. Therefore, it was possible to establish that the properties of the concrete directly influence the temperature evolution phenomenon. 展开更多
关键词 TEMPERATURE mass concrete isotherms numerical analysis.
下载PDF
Concrete Placement for Bridge Decks on an Expressway Extension Project
7
作者 Janusz Holowaty 《Journal of Civil Engineering and Architecture》 2015年第11期1354-1361,共8页
The paper presents examples of technological designs for concrete placement in road bridges constructed during the S5/S 10 expressway extension in Poland. The project included eight concrete or composite bridge struct... The paper presents examples of technological designs for concrete placement in road bridges constructed during the S5/S 10 expressway extension in Poland. The project included eight concrete or composite bridge structures with different numbers of decks. The concrete placement technology is presented for the following bridge decks: slabs cast-in-situ, composite with precast or VFT (prefabricated composite beam) beams and mixed with cast in situ slabs and VFT-WIB (filler beam) beams. Continuous concrete placement was adopted for almost all the bridge superstructures except the mixed-type decks where construction joints were necessary. To control shrinkage, formwork deformations and existing restraints, the concrete was poured in layers and in stages. The design pace of concrete placement was moderate to be regulated at site without compromising safety and quality. The placement methods enabled both efficient and safe concrete pours. 展开更多
关键词 Concrete bridge CURING flesh concrete placement and consolidation shrinkage.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部