厚软土层下高层建筑长短桩复合地基承载性能研究
1
作者 乔旭 《宁波工程学院学报》 2024年第3期56-62,共7页
为了提升厚软土层下高层建筑地基的承载力,提出长短桩复合地基承载性能研究。基于地质勘测结果设计长短桩复合地基,分析其承载性状及沉降情况;利用Mohr-Coulomb模型,完成承载性能模拟。实验结果显示:在短桩和长桩桩体的单桩承载载荷最大... 为了提升厚软土层下高层建筑地基的承载力,提出长短桩复合地基承载性能研究。基于地质勘测结果设计长短桩复合地基,分析其承载性状及沉降情况;利用Mohr-Coulomb模型,完成承载性能模拟。实验结果显示:在短桩和长桩桩体的单桩承载载荷最大时,沉降结果均在5.00 cm左右;楼体层高为30.00 m时,单位载荷沉降平均值为0.51 cm。所提方法能够可靠分析厚软土层的高层建筑长短桩复合地基承载性能,为厚软土层的高层建筑长短桩复合地基设计提供可靠依据。 展开更多
关键词 厚软 高层建筑 长短桩复合地基 土顶应力 单桩桩径
下载PDF
Effect of insufficient tunnel crown thickness on the post-tensioned concrete lining of the Yellow River Crossing Tunnel and its strengthening schemes 被引量:2
2
作者 Qin Gan Cao Shengrong +1 位作者 Lai Xu Yang Fan 《Journal of Southeast University(English Edition)》 EI CAS 2018年第3期356-363,共8页
The effect of deficiency in tunnel crown thickness on the Yellow River Crossing Tunnel with post-tensioned concrete inner lining was investigated by the elasto-plastic finite element method. Changes in the deformation... The effect of deficiency in tunnel crown thickness on the Yellow River Crossing Tunnel with post-tensioned concrete inner lining was investigated by the elasto-plastic finite element method. Changes in the deformations and circumferential stresses of the post-tensioned concrete inner lining with the gradual decrease of the tunnel crown thickness were compared, and the potential bearing risk of insufficient tunnel crown thickness for the Yellow River Crossing Tunnel was revealed. Based on the finite element calculation results of circumferential stresses under different defective cases, the corresponding reinforcement schemes were proposed. The calculation results show that the inner lining can still maintain a satisfactory stress state when the tunnel crown thickness is equal to or greater than 0. 28 m. When the tunnel crown thickness decreases below 0.28 m, the external surface of the crown and internal surface of the crown's adjacent areas may be under tension. The tension stresses will incrementally increase and ultimately exceed the tensile strength of the inner lining concrete as the tunnel crown thickness further decreases gradually. Then, the Yellow River Crossing Tunnel cannot operate normally, and severe cracking, leaking or even failure may occur. When the tunnel crown thickness is equal to or greater than 0.28 m, the reinforcement suggestions are that the void spaces between the inner lining and the outer lining should be back-filled with concrete. When the tunnel crown thickness is less than 0. 28 m, the inner lining should be reinforced by steel plates after concrete back-filling. 展开更多
关键词 post-tensioned concrete linings runnel crownthickness stress redistribution finite element analysis tunnelreinforcement Yellow River Crossing Tunnel
下载PDF