Owing to perfect impermeability,dynamics stability,flexible and efficient operation mode and strong adjustment,underground salt cavern natural gas storage is especially adapted to be used for short-term dispatch.Based...Owing to perfect impermeability,dynamics stability,flexible and efficient operation mode and strong adjustment,underground salt cavern natural gas storage is especially adapted to be used for short-term dispatch.Based on characteristics of gas flow and heat transfer,dynamic mathematic models were built to simulate the injection and withdrawal performance of underground salt cavern gas storage.Temperature and pressure variations of natural gas in gas storage were simulated on the basis of building models during withdrawal operation,and factors affecting on the operation of gas storage were also analyzed.Therefore,these models can provide theore-tic foundation and technology support for the design,building and operation of salt cavern gas storage.展开更多
Caspian Gas into Balkans over medium to long term becames Albanian case on June 2013 when TAP route was selected. After Albanian National Territory Council approved TAP AG's Compound Development Permit, the project s...Caspian Gas into Balkans over medium to long term becames Albanian case on June 2013 when TAP route was selected. After Albanian National Territory Council approved TAP AG's Compound Development Permit, the project should start Construction Phase 1. Existing gas pipeline connections of Albania within the European network via TAP, is highly estimated by energy authorities in both technical and regulating aspects. New pipelines are projected to be build in order to meet local energy consume and seasonal fluctuations, as well as needs of Kosovo and FYROM. Some of important points: determination on the capacity sector building for a due Albanian Gas Market Model, supply options on the future gasification, alternatives of opening underground gas storages in the salt domes of Dumre region and extending pipelines to neighboring countries. By assistance of the Secretariat of Energy Community, MEI starts drafting the new gas law to meet Third Energy Package. TAP project, IAP project, Albania-Kosovo Pipeline, an LNG plant and terminals coastal construction, can contribute on the diversification of gas supply. Underground Gas Storage potentials are geologic solution target, considering the Upper Miocene depleted sandstone gas fields of Divjaka, as well as the Dumre evaporitic deposits diapir of the Upper Triassic.展开更多
基金Sponsored by the National Natural Science Foundation of China (Grant No. 50676025)National Great Project of Scientific and Technical Supporting Programs Funded by Ministry of Science & Technology of China During the 11th Five-year Plan (Grand No.2006BAB03B09)
文摘Owing to perfect impermeability,dynamics stability,flexible and efficient operation mode and strong adjustment,underground salt cavern natural gas storage is especially adapted to be used for short-term dispatch.Based on characteristics of gas flow and heat transfer,dynamic mathematic models were built to simulate the injection and withdrawal performance of underground salt cavern gas storage.Temperature and pressure variations of natural gas in gas storage were simulated on the basis of building models during withdrawal operation,and factors affecting on the operation of gas storage were also analyzed.Therefore,these models can provide theore-tic foundation and technology support for the design,building and operation of salt cavern gas storage.
文摘Caspian Gas into Balkans over medium to long term becames Albanian case on June 2013 when TAP route was selected. After Albanian National Territory Council approved TAP AG's Compound Development Permit, the project should start Construction Phase 1. Existing gas pipeline connections of Albania within the European network via TAP, is highly estimated by energy authorities in both technical and regulating aspects. New pipelines are projected to be build in order to meet local energy consume and seasonal fluctuations, as well as needs of Kosovo and FYROM. Some of important points: determination on the capacity sector building for a due Albanian Gas Market Model, supply options on the future gasification, alternatives of opening underground gas storages in the salt domes of Dumre region and extending pipelines to neighboring countries. By assistance of the Secretariat of Energy Community, MEI starts drafting the new gas law to meet Third Energy Package. TAP project, IAP project, Albania-Kosovo Pipeline, an LNG plant and terminals coastal construction, can contribute on the diversification of gas supply. Underground Gas Storage potentials are geologic solution target, considering the Upper Miocene depleted sandstone gas fields of Divjaka, as well as the Dumre evaporitic deposits diapir of the Upper Triassic.