This paper presents the reason for instability of underground construction. In order to know failure mechanism during the whole construction process, a research framework of multi-scale based on experiments and numeri...This paper presents the reason for instability of underground construction. In order to know failure mechanism during the whole construction process, a research framework of multi-scale based on experiments and numerical analysis is established. Some promising aspects in the topics of stability control are also given in the paper.展开更多
With consideration of the special hydrogeological conditions and layout characteristics of the hydraulic structures, the seepage control measures of dam abutment and underground powerhouse on the right bank of JinPing...With consideration of the special hydrogeological conditions and layout characteristics of the hydraulic structures, the seepage control measures of dam abutment and underground powerhouse on the right bank of JinPing-I hydropower station is drawn up. Based on the three dimensional finite element analysis of seepage control with dry area virtual flow constant mesh analysis method, the rationality of the seepage control measures of dam abutment and underground powerhouse has been verified and the key factors affecting the effect of seepage have been compared. In combination with the curtain of dam abutment, the curtain of underground powerhouse is reasonable. The results showed that the steel liner of penstock after the curtain is necessary.展开更多
基金National Basic Research Program of China(No.2007CB714001)National Natural Science Foundation of China(No.50878193)New century Excellent Talents in University(NCET-08-0491)
文摘This paper presents the reason for instability of underground construction. In order to know failure mechanism during the whole construction process, a research framework of multi-scale based on experiments and numerical analysis is established. Some promising aspects in the topics of stability control are also given in the paper.
文摘With consideration of the special hydrogeological conditions and layout characteristics of the hydraulic structures, the seepage control measures of dam abutment and underground powerhouse on the right bank of JinPing-I hydropower station is drawn up. Based on the three dimensional finite element analysis of seepage control with dry area virtual flow constant mesh analysis method, the rationality of the seepage control measures of dam abutment and underground powerhouse has been verified and the key factors affecting the effect of seepage have been compared. In combination with the curtain of dam abutment, the curtain of underground powerhouse is reasonable. The results showed that the steel liner of penstock after the curtain is necessary.