The theoretical framework of visual simulation in virtual reality is discussed. The new concept of visual image space is supposed. On the basis of visual image space, in visual perceptive sense, VR is considered as a ...The theoretical framework of visual simulation in virtual reality is discussed. The new concept of visual image space is supposed. On the basis of visual image space, in visual perceptive sense, VR is considered as a spatial simulation. The objective of the spatial simulation is to transform physical space to visual image space. Last, the prototype system, surveying & mapping virtual Reality (SMVR), is developed, and the space simulation above is realized. By use of SMVR, the real 3D representation, 3D visual analysis, virtual plan and designs can be implemented.展开更多
If a geocentric 3D coordinate system is adopted in China to replace 2D non-geocentric coordinate system, the coordinates of the surface points will be changed accordingly. The influences on the current maps of China, ...If a geocentric 3D coordinate system is adopted in China to replace 2D non-geocentric coordinate system, the coordinates of the surface points will be changed accordingly. The influences on the current maps of China, especially the topographic maps, are discussed due to the replacement of the coordinate systems. Taking the replacement of Xi’an 80 coordinate system by GRS80 for a numerical example, this paper analyzes the changes of latitude, longitude, Gauss plane coordinates of the surface points, as well as the orientation and the length changes between the points on the map, including the changes of map border lines and sheet corner points.展开更多
On the basis of the principles of simple random sampling, the statistical model of rate of disfigurement (RD) is put forward and described in detail. According to the definition of simple random sampling for the attri...On the basis of the principles of simple random sampling, the statistical model of rate of disfigurement (RD) is put forward and described in detail. According to the definition of simple random sampling for the attribute data in GIS, the mean and variance of the RD are deduced as the characteristic value of the statistical model in order to explain the feasibility of the accuracy measurement of the attribute data in GIS by using the RD. Moreover, on the basis of the mean and variance of the RD, the quality assessment method for attribute data of vector maps during the data collecting is discussed. The RD spread graph is also drawn to see whether the quality of the attribute data is under control. The RD model can synthetically judge the quality of attribute data, which is different from other measurement coefficients that only discuss accuracy of classification.展开更多
On the basis of the comparison data of Stage II of the tunnel site leveling project at Hutubi seismic station and the observation data of Stage IV of the site cross fault leveling project at Hutubi and the level obser...On the basis of the comparison data of Stage II of the tunnel site leveling project at Hutubi seismic station and the observation data of Stage IV of the site cross fault leveling project at Hutubi and the level observation data from the cross fault survey lines in Dafeng from 1987 to 2012,this paper analyses the variation rates of the tunnel site leveling observation results and the difference of annual change rates of the cross fault level observations at Hongshan seismic station in Hutubi. This paper concludes the reliability of the Ni004 optical level used by the station and puts forward a proposal based on the analysis. This paper also explores the cross fault leveling research on the ground deformation in the region concerned on the basis of the historical observation of the cross fault level at Dafeng and the comparison results of the tunnel site leveling observation in Hutubi.展开更多
In order to quickly explore the quality of cut-off wall in dams, a new method of high-density seismic image was adopted and estimated by model and in-situ wall tests.The vibration exciter was employed and several para...In order to quickly explore the quality of cut-off wall in dams, a new method of high-density seismic image was adopted and estimated by model and in-situ wall tests.The vibration exciter was employed and several parameters such as hypocentral distance, length of signal record and sampling space in signal collection were determined, which are 8 m, 0.25 ms and 128 ms respectively. Through time and frequency field signal analyses, it is concluded that, the smaller arrival times of reflected longitudinal and surface waves, and the higher their main frequencies, the higher the strength of the wall, vice versa. Accordingly the construction quality of the wall can be evaluated quickly by high-density seismic image.展开更多
Terrain referenced navigation estimates an aircraft navigation status by utilizing a radar altimeter measuring a distance between the aircraft and terrain elevation. Accurate digital elevation map is essential to esti...Terrain referenced navigation estimates an aircraft navigation status by utilizing a radar altimeter measuring a distance between the aircraft and terrain elevation. Accurate digital elevation map is essential to estimate the aircraft states correctly. However, the elevation map cannot represent the real terrain perfectly and there exists map error between the estimated and the true maps. In this paper, an influence of the map error on measurement equation is analyzed and a technique to incorporate the error in the filter is proposed. The map error is divided into two sources, accuracy error and resolution error. The effectiveness of the suggested technique is verified by simulation results. The method modifies a sensor noise covariance only so there is no additional computational burden from the conventional filter.展开更多
A method for shadow detection and compensation for color aerial images is presented. It is considered that the intensity value of each image pixel is the product of illumination function and ground object reflection, ...A method for shadow detection and compensation for color aerial images is presented. It is considered that the intensity value of each image pixel is the product of illumination function and ground object reflection, and the shadowed regions on the image are mainly caused by the short of illumination, so the information compensation for the shadowed regions should concentrate on the illumination adjustment of concerned area on the basis of the analysis of whole image. The shadow detection and compensation procedure proposed by this paper consists of four steps.展开更多
This paper presents experiment results of the measurement conducted at the Roznew Dam power plant. For a course of starting and operating of turbo-plants, downstream face of the dam was monitored in relation to its ev...This paper presents experiment results of the measurement conducted at the Roznew Dam power plant. For a course of starting and operating of turbo-plants, downstream face of the dam was monitored in relation to its eventual displacements on direction parallel to the construction axis. For the purpose of the experiment, geodetic measurement techniques and 2D DIC (digital image correlation) method (utilizing photographs of the object recorded with digital camera) were compared with regard to credibility, efficiency and accuracy. The vertical and horizontal displacements were monitored by tachometers measurements. The deformations in x-axis and y-axis on the wall surface was monitored by 2D DIC. It has been noticed that 2D DIC method is a surface method, continuous--not discreet. It allows for continuous observations of surface deformations, which is not possible in case of tachemetric measurements. Despite many advantages, the 2D DIC method lacks unambiguous evaluation of precision and relevance of designated displacements, which is rather significant for possibilities of utilization in technical control of large engineered objects. It should be also marked that the tachometric method is more reliable but is more laborious. Research of this type might comprise additional element for the assessment of the influence of dynamic loads, such as activating turbine water flow, onto the overall condition of the surveyed structure.展开更多
The Hamming distances of all negacyclic codes of length 28 over the Gaiois ring GR (2^α, m) are given. In particular, the Lee distances of all negacyclic codes over Z4 of length 2^s are obtained. The Gray images of...The Hamming distances of all negacyclic codes of length 28 over the Gaiois ring GR (2^α, m) are given. In particular, the Lee distances of all negacyclic codes over Z4 of length 2^s are obtained. The Gray images of such negacyclic codes over Z4 are also determined under the Gray map.展开更多
文摘The theoretical framework of visual simulation in virtual reality is discussed. The new concept of visual image space is supposed. On the basis of visual image space, in visual perceptive sense, VR is considered as a spatial simulation. The objective of the spatial simulation is to transform physical space to visual image space. Last, the prototype system, surveying & mapping virtual Reality (SMVR), is developed, and the space simulation above is realized. By use of SMVR, the real 3D representation, 3D visual analysis, virtual plan and designs can be implemented.
文摘If a geocentric 3D coordinate system is adopted in China to replace 2D non-geocentric coordinate system, the coordinates of the surface points will be changed accordingly. The influences on the current maps of China, especially the topographic maps, are discussed due to the replacement of the coordinate systems. Taking the replacement of Xi’an 80 coordinate system by GRS80 for a numerical example, this paper analyzes the changes of latitude, longitude, Gauss plane coordinates of the surface points, as well as the orientation and the length changes between the points on the map, including the changes of map border lines and sheet corner points.
基金ProjectsupportedbytheNationalNaturalScienceFoundationofChina (No .40 1 71 0 78) ,FundfromHongKongPolytechnicUniversity (No.1 .34 .970 9)andtheResearchGrantsCouncilofHongKongSAR (No .3 ZB40 ) .
文摘On the basis of the principles of simple random sampling, the statistical model of rate of disfigurement (RD) is put forward and described in detail. According to the definition of simple random sampling for the attribute data in GIS, the mean and variance of the RD are deduced as the characteristic value of the statistical model in order to explain the feasibility of the accuracy measurement of the attribute data in GIS by using the RD. Moreover, on the basis of the mean and variance of the RD, the quality assessment method for attribute data of vector maps during the data collecting is discussed. The RD spread graph is also drawn to see whether the quality of the attribute data is under control. The RD model can synthetically judge the quality of attribute data, which is different from other measurement coefficients that only discuss accuracy of classification.
基金sponsored by the Natural Science Foundation of Xinjiang Uighur Autonomous Region2012211B56)the Natural Science Foundation of China(41374031)the Earthquake Science and Technology Spark Plan(XH1030),and the Earthquake Science and Technology Spark Progam XH14054Y)
文摘On the basis of the comparison data of Stage II of the tunnel site leveling project at Hutubi seismic station and the observation data of Stage IV of the site cross fault leveling project at Hutubi and the level observation data from the cross fault survey lines in Dafeng from 1987 to 2012,this paper analyses the variation rates of the tunnel site leveling observation results and the difference of annual change rates of the cross fault level observations at Hongshan seismic station in Hutubi. This paper concludes the reliability of the Ni004 optical level used by the station and puts forward a proposal based on the analysis. This paper also explores the cross fault leveling research on the ground deformation in the region concerned on the basis of the historical observation of the cross fault level at Dafeng and the comparison results of the tunnel site leveling observation in Hutubi.
文摘In order to quickly explore the quality of cut-off wall in dams, a new method of high-density seismic image was adopted and estimated by model and in-situ wall tests.The vibration exciter was employed and several parameters such as hypocentral distance, length of signal record and sampling space in signal collection were determined, which are 8 m, 0.25 ms and 128 ms respectively. Through time and frequency field signal analyses, it is concluded that, the smaller arrival times of reflected longitudinal and surface waves, and the higher their main frequencies, the higher the strength of the wall, vice versa. Accordingly the construction quality of the wall can be evaluated quickly by high-density seismic image.
文摘Terrain referenced navigation estimates an aircraft navigation status by utilizing a radar altimeter measuring a distance between the aircraft and terrain elevation. Accurate digital elevation map is essential to estimate the aircraft states correctly. However, the elevation map cannot represent the real terrain perfectly and there exists map error between the estimated and the true maps. In this paper, an influence of the map error on measurement equation is analyzed and a technique to incorporate the error in the filter is proposed. The map error is divided into two sources, accuracy error and resolution error. The effectiveness of the suggested technique is verified by simulation results. The method modifies a sensor noise covariance only so there is no additional computational burden from the conventional filter.
文摘A method for shadow detection and compensation for color aerial images is presented. It is considered that the intensity value of each image pixel is the product of illumination function and ground object reflection, and the shadowed regions on the image are mainly caused by the short of illumination, so the information compensation for the shadowed regions should concentrate on the illumination adjustment of concerned area on the basis of the analysis of whole image. The shadow detection and compensation procedure proposed by this paper consists of four steps.
文摘This paper presents experiment results of the measurement conducted at the Roznew Dam power plant. For a course of starting and operating of turbo-plants, downstream face of the dam was monitored in relation to its eventual displacements on direction parallel to the construction axis. For the purpose of the experiment, geodetic measurement techniques and 2D DIC (digital image correlation) method (utilizing photographs of the object recorded with digital camera) were compared with regard to credibility, efficiency and accuracy. The vertical and horizontal displacements were monitored by tachometers measurements. The deformations in x-axis and y-axis on the wall surface was monitored by 2D DIC. It has been noticed that 2D DIC method is a surface method, continuous--not discreet. It allows for continuous observations of surface deformations, which is not possible in case of tachemetric measurements. Despite many advantages, the 2D DIC method lacks unambiguous evaluation of precision and relevance of designated displacements, which is rather significant for possibilities of utilization in technical control of large engineered objects. It should be also marked that the tachometric method is more reliable but is more laborious. Research of this type might comprise additional element for the assessment of the influence of dynamic loads, such as activating turbine water flow, onto the overall condition of the surveyed structure.
基金the National Natural Science Foundation of China under Grant No.60673074
文摘The Hamming distances of all negacyclic codes of length 28 over the Gaiois ring GR (2^α, m) are given. In particular, the Lee distances of all negacyclic codes over Z4 of length 2^s are obtained. The Gray images of such negacyclic codes over Z4 are also determined under the Gray map.