To keep the tunnel face stable is very important for tunnel construction.In this paper,the tunnel face stability under the advanced pipe was analyzed using the Winkler foundation model and rigid limit equilibrium.The ...To keep the tunnel face stable is very important for tunnel construction.In this paper,the tunnel face stability under the advanced pipe was analyzed using the Winkler foundation model and rigid limit equilibrium.The tunnel face deformation characteristics were also analyzed using the numerical simulation.The influence of parameters on the deflection of the pipe roof and the stability of the tunnel face were discussed.The results show that the tunnel face stability can be improved through increasing the pipe diameter,decreasing the initial displacement at the beginning of the pipe seat,and adopting the short round length and small excavation height.With the increase of tunnel burial depth,the safety factor of tunnel face stability first decreases,then increases,and then remains unchanged.The deformation at the center of the tunnel face is larger than the deformation at the surround sides and at the corner.The horizontal displacement varies little with the increasing of the pipe length.The horizontal displacement at the center of the tunnel face increases with the increase of the pipe ring spacing and the pipe longitudinal spacing.There is an optimum external angle.展开更多
A West Kentucky mine operation in No. 11 seam encountered floor heave, due to the localized increase in the thickness of the fireclay mine floor. Floor heave has overridden seals installed in two mined out panels. The...A West Kentucky mine operation in No. 11 seam encountered floor heave, due to the localized increase in the thickness of the fireclay mine floor. Floor heave has overridden seals installed in two mined out panels. The third seal's location was planned for isolating that area from the Mains. A plan of support has been developed to prevent repetition of the floor heave and related problems outby the seals. The applied ground control measures were successful. An attempt of a 3D numerical modeling was made; thus, it would match the observed behavior of the mine floor and could be used as a design tool in similar conditions. The paper describes sequence of events, an applied mitigation ground control system, and the first stage of numerical modeling.展开更多
To obtain the vertical earth pressure on a soft foundation box culvert and investigate the interaction of the soil-culvert-foundation system, both a centrifugal model test and a numerical simulation were conducted and...To obtain the vertical earth pressure on a soft foundation box culvert and investigate the interaction of the soil-culvert-foundation system, both a centrifugal model test and a numerical simulation were conducted and the comparisons with the current methods to determine the load on a culvert were completed. The results of the model test and numerical analysis are in satisfactory agreement, which shows that the direction of the shear stress between the culvert and the adjacent embankment depends on the differential settlement between them. A vertical earth pressure concentration appears on the culvert with a rigid piles foundation because of a downward shear stress. The ratio of the load on a soft foundation culvert and the overburden pressure above the culvert raises first and then decreases as the backfill height increases. In order to reduce the load on a culvert, it is suggested to limit the stiffness difference of the foundations under the culvert and embankment and to use a light backfill over the culvert.展开更多
A new construction method of pile foundation in composite ground, in which, prior to installing piles, the ground is improved around the heads of the piles in soft ground or ground subject to liquefaction, which is in...A new construction method of pile foundation in composite ground, in which, prior to installing piles, the ground is improved around the heads of the piles in soft ground or ground subject to liquefaction, which is introduced in this paper. This construction method uses a combination of pile foundation construction together with common ground improvement methods, including deep mixing, preloading and sand compaction piling, and it is referred to as the composite ground pile method. Since an artificial ground with relatively high rigidity comparing with that of the original ground was formed around the pile in this method, and the seismic performance has not been made clear, thus the seismic performance of piles in composite ground was systematically analyzed through a series of centrifuge model tests and numerical analyses by using dynamic nonlinear finite element method, and a verification method for the seismic performance of piles in composite ground was proposed on the basis of the experimental and numerical results.展开更多
基金Project(20A187)supported by the Hunan Provincial Department of Education,ChinaProjects(51408216,51308209)supported by the National Natural Science Foundation of China。
文摘To keep the tunnel face stable is very important for tunnel construction.In this paper,the tunnel face stability under the advanced pipe was analyzed using the Winkler foundation model and rigid limit equilibrium.The tunnel face deformation characteristics were also analyzed using the numerical simulation.The influence of parameters on the deflection of the pipe roof and the stability of the tunnel face were discussed.The results show that the tunnel face stability can be improved through increasing the pipe diameter,decreasing the initial displacement at the beginning of the pipe seat,and adopting the short round length and small excavation height.With the increase of tunnel burial depth,the safety factor of tunnel face stability first decreases,then increases,and then remains unchanged.The deformation at the center of the tunnel face is larger than the deformation at the surround sides and at the corner.The horizontal displacement varies little with the increasing of the pipe length.The horizontal displacement at the center of the tunnel face increases with the increase of the pipe ring spacing and the pipe longitudinal spacing.There is an optimum external angle.
文摘A West Kentucky mine operation in No. 11 seam encountered floor heave, due to the localized increase in the thickness of the fireclay mine floor. Floor heave has overridden seals installed in two mined out panels. The third seal's location was planned for isolating that area from the Mains. A plan of support has been developed to prevent repetition of the floor heave and related problems outby the seals. The applied ground control measures were successful. An attempt of a 3D numerical modeling was made; thus, it would match the observed behavior of the mine floor and could be used as a design tool in similar conditions. The paper describes sequence of events, an applied mitigation ground control system, and the first stage of numerical modeling.
基金Project(2012AA112504) supported by the National High Technology Research and Development Program of ChinaProjects(51108048,51478054) supported by the National Natural Science Foundation of China
文摘To obtain the vertical earth pressure on a soft foundation box culvert and investigate the interaction of the soil-culvert-foundation system, both a centrifugal model test and a numerical simulation were conducted and the comparisons with the current methods to determine the load on a culvert were completed. The results of the model test and numerical analysis are in satisfactory agreement, which shows that the direction of the shear stress between the culvert and the adjacent embankment depends on the differential settlement between them. A vertical earth pressure concentration appears on the culvert with a rigid piles foundation because of a downward shear stress. The ratio of the load on a soft foundation culvert and the overburden pressure above the culvert raises first and then decreases as the backfill height increases. In order to reduce the load on a culvert, it is suggested to limit the stiffness difference of the foundations under the culvert and embankment and to use a light backfill over the culvert.
文摘A new construction method of pile foundation in composite ground, in which, prior to installing piles, the ground is improved around the heads of the piles in soft ground or ground subject to liquefaction, which is introduced in this paper. This construction method uses a combination of pile foundation construction together with common ground improvement methods, including deep mixing, preloading and sand compaction piling, and it is referred to as the composite ground pile method. Since an artificial ground with relatively high rigidity comparing with that of the original ground was formed around the pile in this method, and the seismic performance has not been made clear, thus the seismic performance of piles in composite ground was systematically analyzed through a series of centrifuge model tests and numerical analyses by using dynamic nonlinear finite element method, and a verification method for the seismic performance of piles in composite ground was proposed on the basis of the experimental and numerical results.