期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
1997年工勘施工业发展情况
1
作者 李明祥 《工程勘察与施工信息》 1998年第4期6-8,共3页
关键词 工程勘察 施工业发展 建筑工业 地矿勘测
下载PDF
Magnetic Signature of the Kusi Mineral Prospect, Papua New Guinea
2
作者 Nathan Taovasi Mosusu 《Journal of Earth Science and Engineering》 2012年第4期209-219,共11页
A ground magnetic survey was conducted on the Kusi mineral prospect, Papua New Guinea, to provide insights into the magnetic properties of the mineralisation and help define drill targets for an exploration programme.... A ground magnetic survey was conducted on the Kusi mineral prospect, Papua New Guinea, to provide insights into the magnetic properties of the mineralisation and help define drill targets for an exploration programme. The results of the survey suggest three distinct magnetic zones: (1) a magnetic high zone covering the northern portion of the survey area; (2) a northeast-southwest trending magnetic low zone occupying the southern portion and (3) a possible buried intrusive body separating the magnetic high from the low magnetic zone. The results of the survey suggest that drilling is concentrated on the zone of low magnetic response, and the periphery of the interpreted intrusion is adjacent to the contact to the limestone defining the mineralisation style of the two zones. A further ground magnetic survey is required to determine the western limits of the low magnetic zone. 展开更多
关键词 Ground magnetism MINERALIZATION PORPHYRY hydrotherm.
下载PDF
Application of transient electromagnetic method in tunnel exploration
3
作者 ZHANG Zhenguang SUN Xiaodong WANG Xuegang 《Global Geology》 2017年第1期46-52,共7页
Along with the economic development,large tunnels need to be constructed in many high mountains or complex structure regions,and the design and construction of detailed tunnel exploration become particularly important... Along with the economic development,large tunnels need to be constructed in many high mountains or complex structure regions,and the design and construction of detailed tunnel exploration become particularly important.Transient electromagnetic method( TEM) uses a non-grounded loop or an electrode to send a primary electromagnetic pulse into the ground,and observes spatial and temporal distribution of secondary electromagnetic field,which is widely applied in mineral resource exploration,engineering geology,etc.The application of TEM in the tunnel construction of Kaiyuan Temple is researched in this study.The smoke loop inversion is adopted for inverting the transient electromagnetic data.The drilling data and high density resistivity method data are combined for comparison.The obtained inversion result greatly coincides with the actual conditions.Therefore,the geophysical prospecting basis can be provided for the division of stratum,delineation of geological structure,and design and construction of tunnel pavement.By virtue of TEM,drilling data and high density resistivity method,the tunnel construction of Kaiyuan Temple has obtained satisfactory results. 展开更多
关键词 transient electromagnetic tunnel design and construction smoke loop inversion
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部