期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
秦山核电厂海堤工程土工织物应用实例分析
1
作者 郑祖桢 《东海海洋》 1990年第1期42-50,共9页
本文通过对近三年的渗压计、地表沉降板和分阶段现场十字板剪力试验等三项实测资料的反算,证明了它们各自推求的地基固结系数、固结度、最终沉降量及地基强度增值等参数能互相配合,资料可靠。同时,通过上述诸参数与设计采用值的比较分析... 本文通过对近三年的渗压计、地表沉降板和分阶段现场十字板剪力试验等三项实测资料的反算,证明了它们各自推求的地基固结系数、固结度、最终沉降量及地基强度增值等参数能互相配合,资料可靠。同时,通过上述诸参数与设计采用值的比较分析,证实了用土工合成材料处理类似秦山核电厂的低矮海堤具有众多的优越性,处理方法合理可行。 展开更多
关键词 海堤工程 土工织物 渗压计 地表沉降板 地基固结系数
下载PDF
Ground subsidence induced by pillar deterioration in abandoned mine districts 被引量:7
2
作者 LUO Rong LI Guang-yue +3 位作者 CHEN Lu YANG Qi-yi ZANG Chuan-wei CAO Wen-zhuo 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第7期2160-2172,共13页
When roadways are constructed above or adjacent to heavily mined regions, the ground subsidence caused by pillar collapse inflicts severe damage on these roadways. In this study, some surface subsidence events were fi... When roadways are constructed above or adjacent to heavily mined regions, the ground subsidence caused by pillar collapse inflicts severe damage on these roadways. In this study, some surface subsidence events were first reviewed to present roof caving characteristics caused by pillar failure. The bearing characteristic and failure pattern of a single pillar with or without effect of discontinuity were further numerically simulated using distinct element code(3 DEC). It was found that the spalling of pillar or slippage of discontinuity would damage the bearing capacity of pillar during the failure process. The stress at the pillar core could be greater than uniaxial compressive strength of the pillar. However, when a discontinuity runs through a pillar, the slippage of discontinuity would significantly degrade the bearing capacity of the pillar. In pillar support system, if any pillar unexpectedly degrades or loses its bearing capacity, the load transferred from the degraded pillar acts on neighboring pillars, and the shear force also increases at relevant positions. However, the roof cutting and surface subsidence characteristics would perform in different patterns. In some cases, surface subsides slowly;in the worst scenario, shock bump may be induced by pillar and roof collapse. 展开更多
关键词 SUBSIDENCE deteriorating pillar failure process roof cutting
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部