The principle of Accurately Controlled Routinely Operated Signal System (ACROSS) is introduced in this paper. A sample machine is made and tested. The experiment shows that the signal stacking technique is effective i...The principle of Accurately Controlled Routinely Operated Signal System (ACROSS) is introduced in this paper. A sample machine is made and tested. The experiment shows that the signal stacking technique is effective in improving signal to noise ratio and the sompi cepstrum method is applicable to deconvolute a set of travel times of wave elements from accurate transfer function data in frequency domain.展开更多
A fully probabilistic seismic risk assessment was developed in Manizales, Colombia, considering assets of different types. The first type includes elements that are part of the water and sewage network, and the second...A fully probabilistic seismic risk assessment was developed in Manizales, Colombia, considering assets of different types. The first type includes elements that are part of the water and sewage network, and the second type includes public and private buildings. This assessment required the development of a probabilistic seismic hazard analysis that accounts for the dynamic soil response,assembling high resolution exposure databases, and the development of damage models for different types of elements. The economic appraisal of the exposed assets was developed together with specialists of the water utilities company of Manizales and the city administration. The risk assessment was performed using several Comprehensive Approach to Probabilistic Risk Assessment modules as well as the R-System, obtaining results in terms of traditional metrics such as loss exceedance curve, average annual loss, and probable maximum loss. For the case of pipelines, repair rates were also estimated. The results for the water and sewage network were used in activities related to the expansion and maintenance strategies, as well as for the exploration of financial retention and transfer alternatives using insurance schemes based on technical,probabilistic, and prospective damage and loss estimations.In the case of the buildings, the results were used in the update of the technical premium values of the existing collective insurance scheme.展开更多
文摘The principle of Accurately Controlled Routinely Operated Signal System (ACROSS) is introduced in this paper. A sample machine is made and tested. The experiment shows that the signal stacking technique is effective in improving signal to noise ratio and the sompi cepstrum method is applicable to deconvolute a set of travel times of wave elements from accurate transfer function data in frequency domain.
文摘A fully probabilistic seismic risk assessment was developed in Manizales, Colombia, considering assets of different types. The first type includes elements that are part of the water and sewage network, and the second type includes public and private buildings. This assessment required the development of a probabilistic seismic hazard analysis that accounts for the dynamic soil response,assembling high resolution exposure databases, and the development of damage models for different types of elements. The economic appraisal of the exposed assets was developed together with specialists of the water utilities company of Manizales and the city administration. The risk assessment was performed using several Comprehensive Approach to Probabilistic Risk Assessment modules as well as the R-System, obtaining results in terms of traditional metrics such as loss exceedance curve, average annual loss, and probable maximum loss. For the case of pipelines, repair rates were also estimated. The results for the water and sewage network were used in activities related to the expansion and maintenance strategies, as well as for the exploration of financial retention and transfer alternatives using insurance schemes based on technical,probabilistic, and prospective damage and loss estimations.In the case of the buildings, the results were used in the update of the technical premium values of the existing collective insurance scheme.