Based on the basic principles of hydrogeology and soil mechanics, studied thegenesis mechanism and control factors of settling of ground surface caused by the drainageof the aquifer in the construction of coal mines, ...Based on the basic principles of hydrogeology and soil mechanics, studied thegenesis mechanism and control factors of settling of ground surface caused by the drainageof the aquifer in the construction of coal mines, and put forward a corresponding calculatingmodel demonstrated by practical example.The study provides mining areas,which are covered with a very thick Quaternary soil layer and abundant ground water, witha theoretical basis aimed at forecasting the settling of ground surface.展开更多
In order to investigate the feasibility of pretreating the micro-polluted Yellow River raw water by constructed wetland, an experiment was conducted using a surface flow constructed wetland with composite plant bed. T...In order to investigate the feasibility of pretreating the micro-polluted Yellow River raw water by constructed wetland, an experiment was conducted using a surface flow constructed wetland with composite plant bed. The contamination removal efficiency and their trends in the wetland treatment system were studied under different hydraulic loading rates(HLR). The contamination removal efficiencies were compared according to the seasonal change under optimum HLR. The result shows that in the same season, under different hydraulic loadings ranging from 2 to 6 m3/(m2·d) at the same period, the best HLR is 4 m3/(m2·d) in the experimental system. The average removal rates of COD, TN, ammoniacal nitrogen(NH4+-N), and TP in the constructed wetland are 38.37%, 45.97%, 39.86% and 41.69%, respectively. According to China Standard for Surface Water Resources (GB3838-2002), mean effluent of COD, TN, NH4+-N and TP can nearly reach Grade Ⅲ, GradeⅤ, GradeⅠand GradeⅠ, respectively. Furthermore, treatment efficiency of the system in summer is obvious higher than that in other seasons. The expenditure of constructing the constructed wetland with the average treating capacity of 176 m3/d and lifetime of 20 years is 17075.00 RMB. The average disposal cost is summed up to 0.17 RMB/m3, which shows that the pretreatment of the micro-polluted Yellow River raw water by constructed wetland is feasible.展开更多
About 75% water-inrush accidents in China are caused by geological structure such as faults, therefore, it is necessary to investigate the water-inrush mechanism of faults to provide references for the mining activity...About 75% water-inrush accidents in China are caused by geological structure such as faults, therefore, it is necessary to investigate the water-inrush mechanism of faults to provide references for the mining activity above confined water. In this paper, based on the fluid-solid coupling theory, we built the stress-seepage coupling model for rock, then we combined with an example of water-inrush caused by fault, studied the water-inrush mechanism by using the numerical software COMSOL Mutiphysics, analyzed the change rule of shear stress, vertical stress, plastic area and water pressure for stope with a fault, and estimated the water-inrush risk at the different distances between working faces and the fault. The numerical simula- tion results indicate that: (1) the water-inrush risk will grow as the decrease of the distance between working face and the fault; (2) the failure mode of the rock in floor with fault is shear failure; (3) the rock between water-containing fault and working face failure is the reason for water-inrush.展开更多
This study aims at identifying possible correlations between shapes, types of geophysical anomalies and borehole productivity according to geological and hydrogeotogical contexts. The methodology adopted was a two-pro...This study aims at identifying possible correlations between shapes, types of geophysical anomalies and borehole productivity according to geological and hydrogeotogical contexts. The methodology adopted was a two-pronged one--the first step sought to: (1) interpret the electrical resistivity values from horizontal profiling and vertical electrical sounding implemented in Seno province that preceded the drilling of 513 boreholes; (ii) interpret data from pumping tests carried out on boreholes having a discharge superior to 1 m3/h ("positive borehole") by using Cooper-Jacob's method. In the second step, according to geology, authors tried to identify possible correlations between each of the qualitative geophysical parameters: ~shape of anomaly〉〉, tttype of anomaly〉〉 and ~〈type curve〉〉 on the one hand, and hydrogeological parameters such as discharge, alteration thickness, transmissivity and saturated level on the other. The results of this study have shown that the chances of having a positive borehole in Seno province are higher when the type of anomaly is TCC (80%), shape of anomaly is "W" and when type curve is "H" (80%) for all geological formations. Granitic formations are those that record higher discharges while schists record high transmissivity values.展开更多
文摘Based on the basic principles of hydrogeology and soil mechanics, studied thegenesis mechanism and control factors of settling of ground surface caused by the drainageof the aquifer in the construction of coal mines, and put forward a corresponding calculatingmodel demonstrated by practical example.The study provides mining areas,which are covered with a very thick Quaternary soil layer and abundant ground water, witha theoretical basis aimed at forecasting the settling of ground surface.
基金the National High Technology Research and Development Program of China(863 Program)(Grant No.2006AA06Z303).
文摘In order to investigate the feasibility of pretreating the micro-polluted Yellow River raw water by constructed wetland, an experiment was conducted using a surface flow constructed wetland with composite plant bed. The contamination removal efficiency and their trends in the wetland treatment system were studied under different hydraulic loading rates(HLR). The contamination removal efficiencies were compared according to the seasonal change under optimum HLR. The result shows that in the same season, under different hydraulic loadings ranging from 2 to 6 m3/(m2·d) at the same period, the best HLR is 4 m3/(m2·d) in the experimental system. The average removal rates of COD, TN, ammoniacal nitrogen(NH4+-N), and TP in the constructed wetland are 38.37%, 45.97%, 39.86% and 41.69%, respectively. According to China Standard for Surface Water Resources (GB3838-2002), mean effluent of COD, TN, NH4+-N and TP can nearly reach Grade Ⅲ, GradeⅤ, GradeⅠand GradeⅠ, respectively. Furthermore, treatment efficiency of the system in summer is obvious higher than that in other seasons. The expenditure of constructing the constructed wetland with the average treating capacity of 176 m3/d and lifetime of 20 years is 17075.00 RMB. The average disposal cost is summed up to 0.17 RMB/m3, which shows that the pretreatment of the micro-polluted Yellow River raw water by constructed wetland is feasible.
基金Supported by the National Basic Research Program of China (2010CB226800) the National Natural Science Foundation of China (50904065) the Program for New Century Excellent Talents in University (NCET-09-0728)
文摘About 75% water-inrush accidents in China are caused by geological structure such as faults, therefore, it is necessary to investigate the water-inrush mechanism of faults to provide references for the mining activity above confined water. In this paper, based on the fluid-solid coupling theory, we built the stress-seepage coupling model for rock, then we combined with an example of water-inrush caused by fault, studied the water-inrush mechanism by using the numerical software COMSOL Mutiphysics, analyzed the change rule of shear stress, vertical stress, plastic area and water pressure for stope with a fault, and estimated the water-inrush risk at the different distances between working faces and the fault. The numerical simula- tion results indicate that: (1) the water-inrush risk will grow as the decrease of the distance between working face and the fault; (2) the failure mode of the rock in floor with fault is shear failure; (3) the rock between water-containing fault and working face failure is the reason for water-inrush.
文摘This study aims at identifying possible correlations between shapes, types of geophysical anomalies and borehole productivity according to geological and hydrogeotogical contexts. The methodology adopted was a two-pronged one--the first step sought to: (1) interpret the electrical resistivity values from horizontal profiling and vertical electrical sounding implemented in Seno province that preceded the drilling of 513 boreholes; (ii) interpret data from pumping tests carried out on boreholes having a discharge superior to 1 m3/h ("positive borehole") by using Cooper-Jacob's method. In the second step, according to geology, authors tried to identify possible correlations between each of the qualitative geophysical parameters: ~shape of anomaly〉〉, tttype of anomaly〉〉 and ~〈type curve〉〉 on the one hand, and hydrogeological parameters such as discharge, alteration thickness, transmissivity and saturated level on the other. The results of this study have shown that the chances of having a positive borehole in Seno province are higher when the type of anomaly is TCC (80%), shape of anomaly is "W" and when type curve is "H" (80%) for all geological formations. Granitic formations are those that record higher discharges while schists record high transmissivity values.