To test the performance of the Chinese whole-surface electromagnetic prospecting (SEP) system, system integrations, instrument performances, and large-scale production viabilities in Liaoning province and Inner Mong...To test the performance of the Chinese whole-surface electromagnetic prospecting (SEP) system, system integrations, instrument performances, and large-scale production viabilities in Liaoning province and Inner Mongolia were measured via extensive field tests. Resultant electric fields, magnetic fields, apparent resistivities, impedance phases, and inversion profiles compared favorably with results of commercial equipment from other countries. The inversion results agreed well with the geologic information from boreholes. Field tests showed that the SEP system is stable, reliable, lightweight, and easy to operate, making it suitable and ready for real-field exploration.展开更多
The construction of waste rock dumps on existing tailing ponds has been put into practice in China to save precious land resources. This work focuses on the safety assessment of the Daheishan molybdenum mine waste roc...The construction of waste rock dumps on existing tailing ponds has been put into practice in China to save precious land resources. This work focuses on the safety assessment of the Daheishan molybdenum mine waste rock dump under construction on two adjoining tailings ponds. The consolidation of the tailings foundation and the filling quality of the waste rock are investigated by the transient electromagnetic method through detecting water-rich areas and loose packing areas, from which, the depth of phreatic line is also estimated. With such information and the material parameters, the numerical method based on shear strength reduction is applied to analyzing the overall stability of the waste rock dump and the tailings ponds over a number of typical cross sections under both current and designed conditions, where the complex geological profiles exposed by site investigation are considered. Through numerical experiments, the influence of soft lenses in the tailings and possible loose packing areas in the waste rock is examined. Although large displacements may develop due to the soft tailings foundation, the results show that the waste rock dump satisfies the safety requirements under both present and designed conditions.展开更多
The study of artificial slope stability has been a key item of geological engineering projects. Though more evaluation methods are available,result of stability evaluation simulation does not explain the actual proble...The study of artificial slope stability has been a key item of geological engineering projects. Though more evaluation methods are available,result of stability evaluation simulation does not explain the actual problem owing to the diversified geological engineering factors and complexity. The author made a detailed study based on surveys of large amount of geological engineering research on Donggang Power Plant slope project,discussed the comprehensive factors influencing the project,and gave analytical calculation and evaluation to the improved response surface of the slope project. The study result shows that the slope is stable,which can provide scientific basis for designing the slope.展开更多
基金supported by Sino Probe Project(Sino Probe-09-02,201011079)Development Project of National Key Scientific Equipment(No.ZDYZ2012-1-05)the Strategic Priority Research Program of Chinese Academy of Sciences(No.XDA14050100)
文摘To test the performance of the Chinese whole-surface electromagnetic prospecting (SEP) system, system integrations, instrument performances, and large-scale production viabilities in Liaoning province and Inner Mongolia were measured via extensive field tests. Resultant electric fields, magnetic fields, apparent resistivities, impedance phases, and inversion profiles compared favorably with results of commercial equipment from other countries. The inversion results agreed well with the geologic information from boreholes. Field tests showed that the SEP system is stable, reliable, lightweight, and easy to operate, making it suitable and ready for real-field exploration.
基金Projects(51209118,71373245)supported by the National Natural Science Foundation of ChinaProject(2014JBKY01)supported by the Fundamental Research Funds for CASST,China
文摘The construction of waste rock dumps on existing tailing ponds has been put into practice in China to save precious land resources. This work focuses on the safety assessment of the Daheishan molybdenum mine waste rock dump under construction on two adjoining tailings ponds. The consolidation of the tailings foundation and the filling quality of the waste rock are investigated by the transient electromagnetic method through detecting water-rich areas and loose packing areas, from which, the depth of phreatic line is also estimated. With such information and the material parameters, the numerical method based on shear strength reduction is applied to analyzing the overall stability of the waste rock dump and the tailings ponds over a number of typical cross sections under both current and designed conditions, where the complex geological profiles exposed by site investigation are considered. Through numerical experiments, the influence of soft lenses in the tailings and possible loose packing areas in the waste rock is examined. Although large displacements may develop due to the soft tailings foundation, the results show that the waste rock dump satisfies the safety requirements under both present and designed conditions.
文摘The study of artificial slope stability has been a key item of geological engineering projects. Though more evaluation methods are available,result of stability evaluation simulation does not explain the actual problem owing to the diversified geological engineering factors and complexity. The author made a detailed study based on surveys of large amount of geological engineering research on Donggang Power Plant slope project,discussed the comprehensive factors influencing the project,and gave analytical calculation and evaluation to the improved response surface of the slope project. The study result shows that the slope is stable,which can provide scientific basis for designing the slope.