期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
芜湖东编组站过渡开通场间结合设计方案
1
作者 钱旭东 《铁道通信信号》 2017年第7期11-13,共3页
介绍了芜湖东编组站过渡开通时,三场与四场场间结合过渡设计方案,提出了编组站过渡开通时,场联电路设计思路,为类似工程的过渡设计提供参考。
关键词 编组站开通 场间结合 过渡设计
下载PDF
Least squares reverse-time migration in the pseudodepth domain and reservoir exploration 被引量:3
2
作者 Sun Xiao-Dong Jia Yan-Rui +2 位作者 Zhang Min Li Qing-Yang Li Zhen-Chun 《Applied Geophysics》 SCIE CSCD 2018年第2期234-239,363,共7页
Least squares reverse-time migration (LSRTM) is an inversion method that removes artificial images and preserves the amplitude of reflectivity sections. LSRTM has been used in reservoir exploration and processing of... Least squares reverse-time migration (LSRTM) is an inversion method that removes artificial images and preserves the amplitude of reflectivity sections. LSRTM has been used in reservoir exploration and processing of 4D seismic data. LSRTM is, however, a computationally costly and memory-intensive method. In this study, LSRTM in the pseudodepth domain was combined with the conjugate gradient method to reduce the computational cost while maintaining precision. The velocity field in the depth domain was transformed to the velocity field in the pseudodepth domain; thus, the total number of vertical sampling points was reduced and oversampling was avoided. Synthetic and field data were used to validate the proposed method. LSRTM in the pseudodepth domain in conjunction with the conjugate gradient method shows potential in treating field data. 展开更多
关键词 Least squares reverse-time migration pseudodepth domain conjugate gradient
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部