渝利铁路高填方深基础明洞结构力学特性研究 被引量:4
1
作者 黎康 《高速铁路技术》 2020年第3期79-84,共6页
受城市规划影响,渝利铁路以桥改隧跨越丰都斜南溪沟谷,为典型的高填方深基础明洞案例。本文研究制定了沟谷中先建造大体积混凝土隧道坝基,再在坝基上修建明洞,最后在明洞上方超厚回填土至规划标高的技术方案。并采用理论计算和数值分析... 受城市规划影响,渝利铁路以桥改隧跨越丰都斜南溪沟谷,为典型的高填方深基础明洞案例。本文研究制定了沟谷中先建造大体积混凝土隧道坝基,再在坝基上修建明洞,最后在明洞上方超厚回填土至规划标高的技术方案。并采用理论计算和数值分析,系统分析了混凝土坝基、双层明洞衬砌、填土在不同施工步中的变形和内力。分析结果表明,混凝土坝基、明洞、填土在施工和运营阶段均整体稳定,明洞内衬的施作时机对内、外衬砌内力的影响较大,应结合工期综合考虑。研究结论可为类似明洞隧道施工提供参考。 展开更多
关键词 明洞 坝型基础 高填方 双层衬砌 施工步骤
下载PDF
Optimal Evacuation Scheme Based on Dam-Break Flood Numerical Simulation 被引量:2
2
作者 王晓玲 孙蕊蕊 +1 位作者 周正印 黄凌 《Transactions of Tianjin University》 EI CAS 2011年第6期424-430,共7页
The optimal evacuation scheme is studied based on the dam-break flood numerical simulation. A three- dimensional dam-break mathematical model combined with the volume of fluid (VOF) method is adopted. According to t... The optimal evacuation scheme is studied based on the dam-break flood numerical simulation. A three- dimensional dam-break mathematical model combined with the volume of fluid (VOF) method is adopted. According to the hydraulic information obtained from numerical simulation and selecting principles of evacuation emergency scheme, evacuation route analysis model is proposed, which consists of the road right model and random degree model. The road right model is used to calculate the consumption time in roads, and the random degree model is used to judge whether the roads are blocked. Then the shortest evacuation route is obtained based on Dijstra algorithm. Gongming Reservoir located in Shenzhen is taken as a case to study. The results show that industrial area I is flooded at 2 500 s, and after 5 500 s, most of industrial area II is submerged. The Hushan, Loucun Forest and Chaishan are not flooded around industrial area I and II. Based on the above analysis, the optimal evacuation scheme is determined. 展开更多
关键词 three-dimensional dam-break numerical model volume of fluid method evacuation route analysis model evacuation scheme
下载PDF
Analysis and evaluation on seepage stability of Hongxing reservoir dam,Heilongjiang 被引量:2
3
作者 YANG Zhishuang LI Xiaole ZHANG Qinqyu 《Global Geology》 2009年第4期230-235,共6页
Hongxing reservoir was constructed on the floodplain of Hulan River in Heilongjiang. The geological problem of the reservoir is the seepage of the dam base and its related seepage stability. The leakage of the reservo... Hongxing reservoir was constructed on the floodplain of Hulan River in Heilongjiang. The geological problem of the reservoir is the seepage of the dam base and its related seepage stability. The leakage of the reservoir is caused by the water head differences between the upstream and downstream of the dam. Severe seepage could decrease the engineering benefits of the reservoir. Moreover,infiltration function of water will influence the safety of the dam. Through the analysis on the granule constitute and the formation of the dam base,the types of the seepage failure apt to happen were defined and the anti-infiltration and the permissible depression ratio were determined. Using the numerical simulation software GMS,the two-dimension numerical modeling has been carried out to analyze the seepage field of the reservoir. Through the two conditions modeling with concrete impervious wall and no concrete impervious wall,the largest flow rate,single-wide seepage discharge and the max infiltration gradient of the dam base were calculated. According to the permeable depression ratio of the dam base,the seepage stability of Hongxing reservoir dam base was analyzed. 展开更多
关键词 dam base seepage stability two-dimension seepage flow finite element analysis
下载PDF