CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the...CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the benefits of thousands of hot, seholds. Only strengthening the supervision and management during the construction and strictly designing and specifying CFG pile can ensure the construction quality of CFG pile. But most researches focus on operating mechanism and theoretical analysis, and there are fewer researches about the construction of CFG pile. The real construction of CFG pile has no specified operation and lacks of the construction guidance, which not only causes great problems and has great influence on the intensity of CFG pile, but also makes the real pile body have great difference from the design requirements. Therefore, the study on construction of CFG pile in the paper has great significance.展开更多
There are many karst areas within Wuhan-Guangzhou route. Karst grouting is one of the main construction procedures of the sub-grade construction. Through construction art tests,construction principles,water and cement...There are many karst areas within Wuhan-Guangzhou route. Karst grouting is one of the main construction procedures of the sub-grade construction. Through construction art tests,construction principles,water and cementation ratio,grouting construction key points and quality check requirements were determined. Grouting quantity and pressure can be determined according to different geology conditions. Recommendations for quality problems such as bad practicability of grouting,unexpected dissipation of slurry,slurry belching,and overfeeding of slurry going to non-grouting area were proposed.展开更多
Formwork construction has been the important and difficult of the construction process, so the design plan is very important. This paper relies on the Shun Ping Yu subordinate Fertgbo bridge rebuilding project, detail...Formwork construction has been the important and difficult of the construction process, so the design plan is very important. This paper relies on the Shun Ping Yu subordinate Fertgbo bridge rebuilding project, detailing the cast-in-place box beam formwork support system safety special construction plan, focuses on box girder formwork design scheme of foundation design, box girder bracket design and box girder formwork design, to provide a reasonable reference for similar projects.展开更多
文摘CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the benefits of thousands of hot, seholds. Only strengthening the supervision and management during the construction and strictly designing and specifying CFG pile can ensure the construction quality of CFG pile. But most researches focus on operating mechanism and theoretical analysis, and there are fewer researches about the construction of CFG pile. The real construction of CFG pile has no specified operation and lacks of the construction guidance, which not only causes great problems and has great influence on the intensity of CFG pile, but also makes the real pile body have great difference from the design requirements. Therefore, the study on construction of CFG pile in the paper has great significance.
文摘There are many karst areas within Wuhan-Guangzhou route. Karst grouting is one of the main construction procedures of the sub-grade construction. Through construction art tests,construction principles,water and cementation ratio,grouting construction key points and quality check requirements were determined. Grouting quantity and pressure can be determined according to different geology conditions. Recommendations for quality problems such as bad practicability of grouting,unexpected dissipation of slurry,slurry belching,and overfeeding of slurry going to non-grouting area were proposed.
文摘Formwork construction has been the important and difficult of the construction process, so the design plan is very important. This paper relies on the Shun Ping Yu subordinate Fertgbo bridge rebuilding project, detailing the cast-in-place box beam formwork support system safety special construction plan, focuses on box girder formwork design scheme of foundation design, box girder bracket design and box girder formwork design, to provide a reasonable reference for similar projects.