The study of transient heat conduction in multilayered slabs is widely used in various engineering fields. In this paper, the transient heat conduction in multilayered slabs with general boundary conditions and arbitr...The study of transient heat conduction in multilayered slabs is widely used in various engineering fields. In this paper, the transient heat conduction in multilayered slabs with general boundary conditions and arbitrary heat generations is analysed. The boundary conditions are general and include various combinations of Dirichlet, Neumann or Robin boundary conditions at either surface. Moreover, arbitrary heat generations in the slabs are taken into account. The solutions are derived by basic methods, including the superposition method, separation variable method and orthogonal expansion method. The simplified double-layered analytical solution is validated by a numerical method and applied to predicting the temporal and spatial distribution of the temperature inside a landfill. It indicates the ability of the proposed analytical solutions for solving the wide range of applied transient heat conduction problems.展开更多
A solution of the optimization garbage removal problem in the large cities is suggested. In this paper there is described a system architecture to find time-optimal dynamic route for garbage trucks within "Smart Clea...A solution of the optimization garbage removal problem in the large cities is suggested. In this paper there is described a system architecture to find time-optimal dynamic route for garbage trucks within "Smart Clean City" project which unites an approach to put special electronic devices on the garbage containers with the developed software responsible for the detecting the filled up containers and building the optimal way to collect the garbage. There is proposed a formal mathematical model of the task of dynamic optimal route and formal the optimization criterion for time-optimal garbage collection of all waste from landfills. The system includes the knowledge base which contains the rule describing the expert knowledge of the city traffic situation.展开更多
waste dam is one of the most important infrastructures in the project of valley sanitary landfill. On one hand, it forms the landfill capacity required. On the other hand, it improves the slope stability of waste body...waste dam is one of the most important infrastructures in the project of valley sanitary landfill. On one hand, it forms the landfill capacity required. On the other hand, it improves the slope stability of waste body. Consequently, I think it is very significant to maintain the stability of waste dana for the whole sanitary landfill. Combining with a project example, aiming at the special geological conditions, we have made three plans of waste dam structure, calculation and analysis comparison respectively. Reinforced concrete frame waste dam is highlighted in the project for its advantages, smoothly solving the three problems in the engineering.展开更多
基金Projects(41530637,41877222,41702290)supported by the National Natural Science Foundation of China
文摘The study of transient heat conduction in multilayered slabs is widely used in various engineering fields. In this paper, the transient heat conduction in multilayered slabs with general boundary conditions and arbitrary heat generations is analysed. The boundary conditions are general and include various combinations of Dirichlet, Neumann or Robin boundary conditions at either surface. Moreover, arbitrary heat generations in the slabs are taken into account. The solutions are derived by basic methods, including the superposition method, separation variable method and orthogonal expansion method. The simplified double-layered analytical solution is validated by a numerical method and applied to predicting the temporal and spatial distribution of the temperature inside a landfill. It indicates the ability of the proposed analytical solutions for solving the wide range of applied transient heat conduction problems.
文摘A solution of the optimization garbage removal problem in the large cities is suggested. In this paper there is described a system architecture to find time-optimal dynamic route for garbage trucks within "Smart Clean City" project which unites an approach to put special electronic devices on the garbage containers with the developed software responsible for the detecting the filled up containers and building the optimal way to collect the garbage. There is proposed a formal mathematical model of the task of dynamic optimal route and formal the optimization criterion for time-optimal garbage collection of all waste from landfills. The system includes the knowledge base which contains the rule describing the expert knowledge of the city traffic situation.
文摘waste dam is one of the most important infrastructures in the project of valley sanitary landfill. On one hand, it forms the landfill capacity required. On the other hand, it improves the slope stability of waste body. Consequently, I think it is very significant to maintain the stability of waste dana for the whole sanitary landfill. Combining with a project example, aiming at the special geological conditions, we have made three plans of waste dam structure, calculation and analysis comparison respectively. Reinforced concrete frame waste dam is highlighted in the project for its advantages, smoothly solving the three problems in the engineering.