This paper discusses some aspects of finite element computation,such as the automatic generation of finite element ,refinement of mesh,process of node density, distribution of load,optimum design and the drawing o...This paper discusses some aspects of finite element computation,such as the automatic generation of finite element ,refinement of mesh,process of node density, distribution of load,optimum design and the drawing of stress contour, and describes the developing process of software for a planar 8 node element.展开更多
Processes of filtering two-phase media in filtration devices play an important role in various industries. Significant role in the process of filtering is the initial section of flow, which defines the basic parameter...Processes of filtering two-phase media in filtration devices play an important role in various industries. Significant role in the process of filtering is the initial section of flow, which defines the basic parameters: the profile and value of the velocity, pressure gradients, concentration and dispersion of sediment particles, etc.. The problem is solved by the method of surfaces of equal cost, the results enabled to establish the influence of the input section on the filtering process.展开更多
There is recent trend of providing additional treatment of wastewater beyond tertiary level. The purpose is to refine water to a quality that is safe for reuse for unrestricted irrigation and other non potable uses. F...There is recent trend of providing additional treatment of wastewater beyond tertiary level. The purpose is to refine water to a quality that is safe for reuse for unrestricted irrigation and other non potable uses. For this purpose, Kuwait has built and operated an advanced wastewater treatment plant with capacity of 500,000 m3·dl. This plant providing treatment beyond tertiary utilizes the process of Ultra Filtration (UF) and Reverse Osmosis (RO). The reject water of this unit contains high concentration of total nitrogen and total phosphate. Safe disposal of this water into the environment or possible reuse needs substantial reduction of these chemicals. In this study, a bench scale up-flow sludge blanket filtration system was investigated. The system operated with an average Hydraulic-Retention Time (HRT) of 19 h, whereas, sludge age varied within the range of 14 days to 16.5 days. The results show that the average removal efficiencies of the system for Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD) were over 86% and 82% respectively. The phosphate and nitrogen's average removal were found to be 50% and 45% respectively.展开更多
文摘This paper discusses some aspects of finite element computation,such as the automatic generation of finite element ,refinement of mesh,process of node density, distribution of load,optimum design and the drawing of stress contour, and describes the developing process of software for a planar 8 node element.
文摘Processes of filtering two-phase media in filtration devices play an important role in various industries. Significant role in the process of filtering is the initial section of flow, which defines the basic parameters: the profile and value of the velocity, pressure gradients, concentration and dispersion of sediment particles, etc.. The problem is solved by the method of surfaces of equal cost, the results enabled to establish the influence of the input section on the filtering process.
文摘There is recent trend of providing additional treatment of wastewater beyond tertiary level. The purpose is to refine water to a quality that is safe for reuse for unrestricted irrigation and other non potable uses. For this purpose, Kuwait has built and operated an advanced wastewater treatment plant with capacity of 500,000 m3·dl. This plant providing treatment beyond tertiary utilizes the process of Ultra Filtration (UF) and Reverse Osmosis (RO). The reject water of this unit contains high concentration of total nitrogen and total phosphate. Safe disposal of this water into the environment or possible reuse needs substantial reduction of these chemicals. In this study, a bench scale up-flow sludge blanket filtration system was investigated. The system operated with an average Hydraulic-Retention Time (HRT) of 19 h, whereas, sludge age varied within the range of 14 days to 16.5 days. The results show that the average removal efficiencies of the system for Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD) were over 86% and 82% respectively. The phosphate and nitrogen's average removal were found to be 50% and 45% respectively.