Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and th...Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and the stability of rockmass.According to sampling and testing of ore-rock and backfill and in-situ stress field measurement,safety factor method calculation model based on stress-strain strength reduction at arbitrary points and Mohr-Coulomb yield criterion was established and limit displacement subsidence values under the safety factor of different limit stoping steps were calculated.The results from three years in-situ mining and strata movement monitoring using multi-point displacements meter showed that the lower settlement frame stope hierarchical level filling mining method,mining sequence are reasonable and rockmass stability evaluation using safety factor method,in-situ real-time monitoring can provide the technical foundation for the safety of seabed mining.展开更多
An access control model is proposed based on the famous Bell-LaPadula (BLP) model.In the proposed model,hierarchical relationships among departments are built,a new concept named post is proposed,and assigning secur...An access control model is proposed based on the famous Bell-LaPadula (BLP) model.In the proposed model,hierarchical relationships among departments are built,a new concept named post is proposed,and assigning security tags to subjects and objects is greatly simplified.The interoperation among different departments is implemented through assigning multiple security tags to one post, and the more departments are closed on the organization tree,the more secret objects can be exchanged by the staff of the departments.The access control matrices of the department,post and staff are defined.By using the three access control matrices,a multi granularity and flexible discretionary access control policy is implemented.The outstanding merit of the BLP model is inherited,and the new model can guarantee that all the information flow is under control.Finally,our study shows that compared to the BLP model,the proposed model is more flexible.展开更多
In order to improve the performance of the security-reliability tradeoff (SRT), a joint jammer and user scheduling (JJUS) scheme is proposed. First, a user with the maximal instantaneous channel capacity is select...In order to improve the performance of the security-reliability tradeoff (SRT), a joint jammer and user scheduling (JJUS) scheme is proposed. First, a user with the maximal instantaneous channel capacity is selected to transmit its signal to the base station ( BS) in the transmission time slot. Then, when the user transmits its signal to BS, the jammer is invoked for transmitting artificial noise in order to perturb the eavesdropper’s reception. Simulation results show that increasing the number of users can enhance the SRT performance of the proposed JJUS scheme. In addition, the SRT performance of the proposed JJUS scheme is better than that of the traditional round-robin scheduling and pure user scheduling schemes. The proposed JJUS scheme can guarantee the secure transmission even in low main-to-eavesdropper ratio( MER) regions.展开更多
Based on characteristic of the associated mining of multi-coal seam and the engineering geological characteristics of overburden,the mining impact pattern of multi- seam mining and the dynamic fracture mechanism of ov...Based on characteristic of the associated mining of multi-coal seam and the engineering geological characteristics of overburden,the mining impact pattern of multi- seam mining and the dynamic fracture mechanism of overburden were characterized by applying the engineering geological mechanical model test.The related strata movement parameters and influence area of multi-seam mining were obtained,the strike boundary angle is 61°,the full extraction coefficient is 0.93,the greatest subsidence angle is 81°,the horizontal movement factor is 0.38,the deviation of inflection point/mining deep is 0.11. The development height of caving zone and water flowing fractured zone of multi-seam mining were calculated,is 32 m and 81.5 m separatly.The assess of influence degree of coal layer safety mining is that,there exists the possibility of water and sand inflow when mining,some messures for mine water prevention and control should be used,and the mining thickness should be local strictly limit.展开更多
基金Project(10872218) supported by the National Natural Science Foundation of ChinaProject(2010CB732004) supported by the National Key Basic Research Program of China+1 种基金Project(20090461022) supported by the National Postdoctoral Foundation of ChinaProject (11MX21) supported by the Students' Innovation Project Aubsidize Award of Arcelor Mittal
文摘Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and the stability of rockmass.According to sampling and testing of ore-rock and backfill and in-situ stress field measurement,safety factor method calculation model based on stress-strain strength reduction at arbitrary points and Mohr-Coulomb yield criterion was established and limit displacement subsidence values under the safety factor of different limit stoping steps were calculated.The results from three years in-situ mining and strata movement monitoring using multi-point displacements meter showed that the lower settlement frame stope hierarchical level filling mining method,mining sequence are reasonable and rockmass stability evaluation using safety factor method,in-situ real-time monitoring can provide the technical foundation for the safety of seabed mining.
基金The National Natural Science Foundation of China(No.60403027,60773191,70771043)the National High Technology Research and Development Program of China(863 Program)(No.2007AA01Z403)
文摘An access control model is proposed based on the famous Bell-LaPadula (BLP) model.In the proposed model,hierarchical relationships among departments are built,a new concept named post is proposed,and assigning security tags to subjects and objects is greatly simplified.The interoperation among different departments is implemented through assigning multiple security tags to one post, and the more departments are closed on the organization tree,the more secret objects can be exchanged by the staff of the departments.The access control matrices of the department,post and staff are defined.By using the three access control matrices,a multi granularity and flexible discretionary access control policy is implemented.The outstanding merit of the BLP model is inherited,and the new model can guarantee that all the information flow is under control.Finally,our study shows that compared to the BLP model,the proposed model is more flexible.
基金The National Natural Science Foundation of China(No.61271207,61372104)the Science and Technology Project of SGCC(No.SGRIXTKJ[2015]349)
文摘In order to improve the performance of the security-reliability tradeoff (SRT), a joint jammer and user scheduling (JJUS) scheme is proposed. First, a user with the maximal instantaneous channel capacity is selected to transmit its signal to the base station ( BS) in the transmission time slot. Then, when the user transmits its signal to BS, the jammer is invoked for transmitting artificial noise in order to perturb the eavesdropper’s reception. Simulation results show that increasing the number of users can enhance the SRT performance of the proposed JJUS scheme. In addition, the SRT performance of the proposed JJUS scheme is better than that of the traditional round-robin scheduling and pure user scheduling schemes. The proposed JJUS scheme can guarantee the secure transmission even in low main-to-eavesdropper ratio( MER) regions.
基金the National Natural Science Foundation of China(40372123)
文摘Based on characteristic of the associated mining of multi-coal seam and the engineering geological characteristics of overburden,the mining impact pattern of multi- seam mining and the dynamic fracture mechanism of overburden were characterized by applying the engineering geological mechanical model test.The related strata movement parameters and influence area of multi-seam mining were obtained,the strike boundary angle is 61°,the full extraction coefficient is 0.93,the greatest subsidence angle is 81°,the horizontal movement factor is 0.38,the deviation of inflection point/mining deep is 0.11. The development height of caving zone and water flowing fractured zone of multi-seam mining were calculated,is 32 m and 81.5 m separatly.The assess of influence degree of coal layer safety mining is that,there exists the possibility of water and sand inflow when mining,some messures for mine water prevention and control should be used,and the mining thickness should be local strictly limit.