Wuhan Tianxingzhou Changjiang (WTC) Bridge and Nanjing Dashengguan Changjiang (NDC) Bridge are two super high-speed railway 3-trusses composite bridges. This is the first time of using three trusses in such large brid...Wuhan Tianxingzhou Changjiang (WTC) Bridge and Nanjing Dashengguan Changjiang (NDC) Bridge are two super high-speed railway 3-trusses composite bridges. This is the first time of using three trusses in such large bridges in the world. These two types of railway floor systems of the two bridges have never been used in China before. The problem how to conform the deformations and stress levels of the railway floor system of WTC Bridge was studied. After finite element analysis and comparison,the plan of arranging one expansion stringer every two panels in railway floor system were proposed and good effect was obtained. Because of the application of three trusses,the allocation of the loads acted on the deck in three trusses is different and varies in different places of NDC Bridge. This problem was studied by model experiment and 3D finite element analysis. The results of 3D FEM analysis coincide with the model test results. The allocation rule of the loads acting on the deck in three trusses was presented. Because of the application of monolithic decks,the stiffness and structural integrity of NDC Bridge are high.展开更多
It is helpful to improve the seismic design theory of long-span continuous bridges for studying the seismic performance of each cantilever construction state.Taking the Bridge 1 in the north of Changbai-Mountain inter...It is helpful to improve the seismic design theory of long-span continuous bridges for studying the seismic performance of each cantilever construction state.Taking the Bridge 1 in the north of Changbai-Mountain international tourism resort as an example,the authors studied it in shutdown phase and the cantilever construction process,established the simulation model by using Midas / civil,and analyzed time-history of each construction stage for the bridge.The study shows that long-span bridge cantilever construction in northeastern China can be divided into two-year tasks for construction(suspending in winter).It is needed to think about seismic stability of the cantilever position in shut-down phase of winter.The effect of longitudinal vibration is the most disadvantageous influence to bridge,and its calculation results can provide reference for seismic design of similar bridges in the future.展开更多
During the construction of the south caisson anchorage of Taizhou Bridge, the drainage area is located in the lower reaches of the Yangtze River and the permeability of stratums there is considerable. In order to main...During the construction of the south caisson anchorage of Taizhou Bridge, the drainage area is located in the lower reaches of the Yangtze River and the permeability of stratums there is considerable. In order to maintain progress and guarantee safety during the sinking of the caisson, water should be drained in the initial period. Subsequently, detailed information about the aquifer permeability is required to make sure that the drainage will proceed successfully, which consequently necessitates the on-site estimation of the aquifer permeability in the drainage area. Therefore, the traditional pumping test and slug test are implemented respectively on site. The comparison of computational results of these two tests indicates that they are consistent overall. Notwithstanding, as slug test can be conducted with portable facilities in a short time and the manipulation is easy and few people need to be involved, the advantages of slug test is conspicuous compared with the traditional pumping test. It could be speculated that slug test will gain a prevalent application in the measurement of aquifer permeability in the future.展开更多
Taizhou Bridge is the first kilometer level three-pylon two-span suspension bridge in the world and the structural complexity has significant effects on the seismic performance of the bridge. Shaking table test of Tai...Taizhou Bridge is the first kilometer level three-pylon two-span suspension bridge in the world and the structural complexity has significant effects on the seismic performance of the bridge. Shaking table test of Taizhou Bridge is arranged to investigate the effects of non-uniform ground motion input, collision between main and side spans and optimal seismic structural system. It's very important and difficult to design and manufacture the scaled down model of Taizhou Bridge used during the shaking table test. The key point is that the girder and pylons are very hard to be manufactured if the similarity ratio is strictly followed. Based on the finite element method (FEM) analysis, a simplified scaled down model is designed and the bending stiffness of the girder and pylon are strictly simulated, and the torsion stiffness and axial stiffness are not strictly simulated. The inner forces and displacements of critical sections, points of simplified model and theoretical model are compared by FEM analysis, and it's found out that the difference between the seismic responses is relatively small. So, the simplified model can be used to conduct the shaking table test by the FEM verification.展开更多
A rigid central buckle is employed in Runyang Suspension Bridge (RSB) to replace commonly used short suspenders in the main span. Based on the seismic waves with 2% probabilities of exceedance, the nonlinear seismic...A rigid central buckle is employed in Runyang Suspension Bridge (RSB) to replace commonly used short suspenders in the main span. Based on the seismic waves with 2% probabilities of exceedance, the nonlinear seismic response time-domain analysis are then conducted and influence of central buckles on seismic response of long-span suspension bridge is specially studied. Analysis resuits show that the central buckle can effectively control the longitudinal floating vibration mode of the deck, and therefore reduce earthquake-excited longitudinal displacement at the end of the deck. However, the central buckle may cause increment of longitudinal displacement at the top of main tower and bending moment at the bottom of the main tower, which should be paid special attention to. Results provide references for anti-earthquake analysis and design of long-span suspension bridges using rigid central buckles.展开更多
Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span...Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span cable-stayed bridges.According to the approach,the seismic performance evaluation of the Sutong Bridge,which is a cable-stayed bridge with a main span of 1 088 m,is completed,and the practicality of the approach is validated.The earthquake resistance level for super-long span cable-stayed bridges is discussed,including the earthquake level,its corresponding structural performance and check indices.And a set of formula for capacity/demand ratio calculation of bridge components is proposed.展开更多
基金Projects(2004G028, 2004G016) supported by the Science and Technology Development Program of Railways Department, China
文摘Wuhan Tianxingzhou Changjiang (WTC) Bridge and Nanjing Dashengguan Changjiang (NDC) Bridge are two super high-speed railway 3-trusses composite bridges. This is the first time of using three trusses in such large bridges in the world. These two types of railway floor systems of the two bridges have never been used in China before. The problem how to conform the deformations and stress levels of the railway floor system of WTC Bridge was studied. After finite element analysis and comparison,the plan of arranging one expansion stringer every two panels in railway floor system were proposed and good effect was obtained. Because of the application of three trusses,the allocation of the loads acted on the deck in three trusses is different and varies in different places of NDC Bridge. This problem was studied by model experiment and 3D finite element analysis. The results of 3D FEM analysis coincide with the model test results. The allocation rule of the loads acting on the deck in three trusses was presented. Because of the application of monolithic decks,the stiffness and structural integrity of NDC Bridge are high.
文摘It is helpful to improve the seismic design theory of long-span continuous bridges for studying the seismic performance of each cantilever construction state.Taking the Bridge 1 in the north of Changbai-Mountain international tourism resort as an example,the authors studied it in shutdown phase and the cantilever construction process,established the simulation model by using Midas / civil,and analyzed time-history of each construction stage for the bridge.The study shows that long-span bridge cantilever construction in northeastern China can be divided into two-year tasks for construction(suspending in winter).It is needed to think about seismic stability of the cantilever position in shut-down phase of winter.The effect of longitudinal vibration is the most disadvantageous influence to bridge,and its calculation results can provide reference for seismic design of similar bridges in the future.
基金Special Fund of"333"High Level Talent Training Project of Jiangsu ProvinceNational Scienceand Technology Support Program of China ( No. 2009BAG15B02) Key Programs for Science and Technology De-velopment of Chinese Transportation Industry( No. 2008-353-332-150)
文摘During the construction of the south caisson anchorage of Taizhou Bridge, the drainage area is located in the lower reaches of the Yangtze River and the permeability of stratums there is considerable. In order to maintain progress and guarantee safety during the sinking of the caisson, water should be drained in the initial period. Subsequently, detailed information about the aquifer permeability is required to make sure that the drainage will proceed successfully, which consequently necessitates the on-site estimation of the aquifer permeability in the drainage area. Therefore, the traditional pumping test and slug test are implemented respectively on site. The comparison of computational results of these two tests indicates that they are consistent overall. Notwithstanding, as slug test can be conducted with portable facilities in a short time and the manipulation is easy and few people need to be involved, the advantages of slug test is conspicuous compared with the traditional pumping test. It could be speculated that slug test will gain a prevalent application in the measurement of aquifer permeability in the future.
基金National Science and Technology Support Program of China(No.2009BAG15B01)Key Programs for Science and Technology Development of Chinese Transportation Industry(No.2008-353-332-190)+2 种基金Natural Science Foundation of China(No.50708074)the Ministry of Science and Technology of China(No.SLDRCE08-B-04)Kwang-Hua Fund for College of Civil Engineering,Tongji University
文摘Taizhou Bridge is the first kilometer level three-pylon two-span suspension bridge in the world and the structural complexity has significant effects on the seismic performance of the bridge. Shaking table test of Taizhou Bridge is arranged to investigate the effects of non-uniform ground motion input, collision between main and side spans and optimal seismic structural system. It's very important and difficult to design and manufacture the scaled down model of Taizhou Bridge used during the shaking table test. The key point is that the girder and pylons are very hard to be manufactured if the similarity ratio is strictly followed. Based on the finite element method (FEM) analysis, a simplified scaled down model is designed and the bending stiffness of the girder and pylon are strictly simulated, and the torsion stiffness and axial stiffness are not strictly simulated. The inner forces and displacements of critical sections, points of simplified model and theoretical model are compared by FEM analysis, and it's found out that the difference between the seismic responses is relatively small. So, the simplified model can be used to conduct the shaking table test by the FEM verification.
文摘A rigid central buckle is employed in Runyang Suspension Bridge (RSB) to replace commonly used short suspenders in the main span. Based on the seismic waves with 2% probabilities of exceedance, the nonlinear seismic response time-domain analysis are then conducted and influence of central buckles on seismic response of long-span suspension bridge is specially studied. Analysis resuits show that the central buckle can effectively control the longitudinal floating vibration mode of the deck, and therefore reduce earthquake-excited longitudinal displacement at the end of the deck. However, the central buckle may cause increment of longitudinal displacement at the top of main tower and bending moment at the bottom of the main tower, which should be paid special attention to. Results provide references for anti-earthquake analysis and design of long-span suspension bridges using rigid central buckles.
基金National Key Technologies R&D Program(No.2006BAG04B01),research on technical standards,key structures and their characteristics of kilometer-magnitude cable-stayed bridges
文摘Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span cable-stayed bridges.According to the approach,the seismic performance evaluation of the Sutong Bridge,which is a cable-stayed bridge with a main span of 1 088 m,is completed,and the practicality of the approach is validated.The earthquake resistance level for super-long span cable-stayed bridges is discussed,including the earthquake level,its corresponding structural performance and check indices.And a set of formula for capacity/demand ratio calculation of bridge components is proposed.