来安县屯仓水库大坝工程的设计探讨
1
作者 周军 《陕西水利》 2023年第12期120-121,共2页
来安县是安徽省距六朝古都南京最近的县,属南京都市圈的核心层,所辖的汊河镇与南京高新技术开发区相邻,离南京长江一桥仅12 km。来安县境内的屯仓水库水库始建于1958年,是来安县的主要骨干水利工程,近年来随着城市人口的不断增加,水资... 来安县是安徽省距六朝古都南京最近的县,属南京都市圈的核心层,所辖的汊河镇与南京高新技术开发区相邻,离南京长江一桥仅12 km。来安县境内的屯仓水库水库始建于1958年,是来安县的主要骨干水利工程,近年来随着城市人口的不断增加,水资源短缺、水环境差等水利问题日益突出,扩建屯仓水库是来安县开拓城市供水水源优先选择。文章结合屯仓水库现状,分析扩建后大坝的加高设计,可为工程安全运行提供保障。 展开更多
关键词 来安县 屯仓水库 大坝工程设计
下载PDF
The dam design of Three Gorges Project
2
作者 Wang Xiaomao Xu Linxiang Liao Renqiang 《Engineering Sciences》 EI 2011年第3期57-65,共9页
The dam of Three Gorges Project is a concrete gravity dam with the crest elevation of 185 m,the maximum height of 181 m and dam axis length of 2 309.5 m.The dam consists of spillway,powerhouse,non-over flow,ship-lift,... The dam of Three Gorges Project is a concrete gravity dam with the crest elevation of 185 m,the maximum height of 181 m and dam axis length of 2 309.5 m.The dam consists of spillway,powerhouse,non-over flow,ship-lift,temporary ship-lock,left diversion wall and longitudinal cofferdam blocks.Some key techniques relating to dam structure design are presented,including hydraulics of flood discharge structure,dam joint design,layout and structural type of penstock,deep anti-sliding stability of dam foundation,reconstruction of temporary ship-lock and closed drainage and pumping of dam foundation. 展开更多
关键词 Three Gorges Project DAM DESIGN
下载PDF
The research and practice of major technological issues on design of Three Gorges Project
3
作者 Zheng Shouren Niu Xinqiang 《Engineering Sciences》 EI 2011年第3期22-30,共9页
The dam of Three Gorges Project is characterized by large flood discharge capacity,more outlets,complicated flood discharge and energy dissipation structure,and the stability of the bank powerhouse dam foundation is e... The dam of Three Gorges Project is characterized by large flood discharge capacity,more outlets,complicated flood discharge and energy dissipation structure,and the stability of the bank powerhouse dam foundation is endangered by large gentle-dip structural plane of the bedrock due to the deep excavation of powerhouse at the dam-toe.For the dam body concrete,the durability requirement is high and the temperature control and crack prevention are difficult.The practical experience which could be used for reference in the design and construction of asphalt concrete core wall for Maopingxi protective earth-rock dam is scarce.The power station operates with high water head and large head variation.The type selection of penstock and intake as well as the embedding way of spiral case are complicated in technique,and the tailrace tunnel with sloping ceiling of underground power plant is arranged instead of traditional tailrace surge tank.For the double-line five-step ship-lock,the design of fully lined ship-lock,high head delivery system and large-sized miter gates and hoists is very challenging due to high operation head,complicated delivery conditions and building in deep excavated rock.The preferred solutions,optimal schemes and technical measures for various structures,as well as the innovation achievements proved by practice are highlighted. 展开更多
关键词 Three Gorges Project structure DESIGN key techniques PRACTICE