期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Unanticipated Bond Failure over Supporting Band Beams in Grouted Post-Tensioned Slab Tendons with Little or No Initial Prestress
1
作者 Raymond Ian Gilbert 《Journal of Civil Engineering and Architecture》 2013年第11期1343-1352,共10页
After grouting the ducts in a large band beam and one-way slab post-tensioned floor system in a large shopping mall (in excess of 1.5 km2 in plan), doubts arose concerning the level of initial prestress and the stre... After grouting the ducts in a large band beam and one-way slab post-tensioned floor system in a large shopping mall (in excess of 1.5 km2 in plan), doubts arose concerning the level of initial prestress and the strength and serviceability of the slabs was questioned. To assess the strength of the slabs, it was assumed, as a worst case scenario, that some spans may have been constructed with zero initial prestress. Load tests on prototype specimens, with similar dimensions and reinforcement quantities as the floor slabs, were performed to assess the stress development in initially unstressed, but fully grouted, tendons. Unexpected bond failures occurred at the junctions of slab and band beam where the abrupt change in section depth caused a sudden change in tendon stress. The maximum stress that was developed in the initially unstressed tendons at these locations was about 60% of the strength of the tendons. 展开更多
关键词 ANCHORAGE development length post-tensioned slabs stress development TENDONS unbonded construction.
下载PDF
Risk Analysis for Mega Shopping Mall Projects in Egypt
2
作者 Samer Ezeldin Hesham H. Ibrahim 《Journal of Civil Engineering and Architecture》 2015年第6期644-651,共8页
Mega shopping mall projects have seen dramatic growth and great development in recent years in Egypt. Many new mega shopping mall projects are under construction and expecting to start working in the few coming years.... Mega shopping mall projects have seen dramatic growth and great development in recent years in Egypt. Many new mega shopping mall projects are under construction and expecting to start working in the few coming years. In the absence of researches studying the Egyptian mega shopping mall projects, this study tries to highlight the most critical risks that face these projects and the associated most effective response methods to be employed. The scope covers the analysis from different perspectives by including owners/developers, designers, consultants, project managers, and contractors that have previous experience in large-scale projects such as shopping mall projects. In this study, 30 construction project risks are classified into six main categories according to their type and 150 risk mitigation/elimination measures are introduced to overcome the impact of risks under each of these risk categories. The results reveal that the main risk category that faces the mega shopping mall projects in Egypt is the one including the financial risk factors. The most critical risk factor that faces these projects is the financial ability of the client. These results are similar to findings by previous researches conducted for large projects in other countries. 展开更多
关键词 Mega shopping mall projects commercial projects critical risks risk mitigation/elimination measures
下载PDF
2010年武汉商圈发展态势分析与2011年展望
3
作者 王谟 《武汉商务》 2011年第4期30-33,共4页
一、2010年武汉商圈发展基本态势2010年,武汉商业围绕拉动内需的总体目标,进一步完善城市商业网点发展规划,继续推进传统商业改造。
关键词 商业网点 态势分析 拉动内需 商业经营 发展规划 社区商业 零售商业 新商圈 商业心区 大型购物中
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部