This paper,from three aspects including construction conditions,foundation design and construction,introduces some considerations in the designing of main-pylon foundations and some practical measures to deal with cer...This paper,from three aspects including construction conditions,foundation design and construction,introduces some considerations in the designing of main-pylon foundations and some practical measures to deal with certain unfavorable construction conditions,such as deep water,tidal effect,soft stratum and heavy traffic,during the construction of main-pylon foundations.展开更多
Because of the computation difficulty of the beating capacity of large underwater caisson foundation on thick overburden layer ground, the geotechnieal software FLAC3D was utilized in the 3D numerical analysis on the ...Because of the computation difficulty of the beating capacity of large underwater caisson foundation on thick overburden layer ground, the geotechnieal software FLAC3D was utilized in the 3D numerical analysis on the bearing capacity of middle pylon foundation. From the computational results, it is concluded that the caisson foundation has a good bearing capacity on thick overburden layer ground and the beating capacity can be improved assuming that the soil near the area of basal comer is reinforced.展开更多
Pile group foundation and caisson foundation are two common foundation schemes of long-span bridges, and the seismic performances of the two kinds of foundations are different. Taking Taizhou Bridge as an example, whi...Pile group foundation and caisson foundation are two common foundation schemes of long-span bridges, and the seismic performances of the two kinds of foundations are different. Taking Taizhou Bridge as an example, which is the first kilometer level three-pylon two-span suspension bridge in the world, two foundation schemes are designed for the middle pylon, and two whole bridge models with two different foundation schemes of the middle pylon are established respectively in this paper. The effects of foundation-soil interaction are simulated by equivalent linear soil springs whose stiffnesses are calculated according to m method. Seismic capacity/demand ratios of the two models are calculated. The following conclusions can be drawn: the weak positions of the two schemes are not the same; if caisson foundation is adopted for the middle pylon, the weak position is the bearing capacity of the middle pylon foundation, while if pile group foundation is adopted for the middle pylon, the weak position is the bearing capacity of the side pylon foundation.展开更多
Taizhou Yangtze River Bridge is the first three-pylon two-span suspension bridge in the world. The middle pylon adopts deep water caisson foundation. The superstructure of the middle pylon employs herringbone shape al...Taizhou Yangtze River Bridge is the first three-pylon two-span suspension bridge in the world. The middle pylon adopts deep water caisson foundation. The superstructure of the middle pylon employs herringbone shape along the bridge, and portal shape in the transverse direction for the first time in China. In this paper, the basic construction procedure, equipment, construction steps, the key construction technologies and methods of steel pylon are introduced.展开更多
The paper analyzes existing state of innovation system in the field of public infrastructure construction in China and elaborates on the duty and role of owner in establishment of a technical innovation system with en...The paper analyzes existing state of innovation system in the field of public infrastructure construction in China and elaborates on the duty and role of owner in establishment of a technical innovation system with enterprise as the main body following the process of production-education-research.This paper also claims that the key project construction is an important resource to enhance national capability of innovation and accordingly puts forward an effective approach to cultivate the core competitiveness of leading enterprises on the basis of practice in the Sutong Bridge project.展开更多
The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream a...The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream anchorage cables, underwater topography, the drag forces of the caisson cutting edge and frictional resistances of the sidewall and etc. are monitored in real time. According to the synthesized data analysis and decision-making system, the spatial states of the caisson are adjusted in time to locate and embed the deep water caisson precisely. The offset error of the caisson is less than 30 cm and the vertical error is 1/363 at the final stage. The control technology for construction of large caisson under deep water is concluded and would be helpful for the construction of bridge foundation in the future.展开更多
Digital cable-stayed bridge maintenance and management system (DCBMS) was developed for the need of maintenance and management of long-span cable-stayed bridges. In this paper, the major functions and theoretical ap...Digital cable-stayed bridge maintenance and management system (DCBMS) was developed for the need of maintenance and management of long-span cable-stayed bridges. In this paper, the major functions and theoretical application of eight modules were systematically stated with the background of Harbin Songhua River cable-stayed bridge, which include data management module, inspection and measurement module, assessment module, finite dement analysis module, disease diagnosis and prediction module, maintenance module, query module and help module. By analyzing and calculating the data from manual inspection database, basic database and health monitoring subsystem, DCBMS can accomplish the functions like life prediction, disease diagnosis, comprehensive assessment, maintenance and management of bridges. Therefore, the maintenance and management of long-span cable-stayed bridges can be made digital, professional and scientific. By running this system, a real-time and specific technical guidance can be provided for the maintainers and managers of long- span cable-stayed bridges.展开更多
Sutong Bridge,as a world-record cable-stayed bridge with its main span exceeding 1 000 m constructed in Yangtze River estuary region in China,is located at a site with complicated hydrologic conditions and poor geotec...Sutong Bridge,as a world-record cable-stayed bridge with its main span exceeding 1 000 m constructed in Yangtze River estuary region in China,is located at a site with complicated hydrologic conditions and poor geotechnical conditions and therefore,scour protection will be a decisive factor for ensuring smooth and successful construction of this bridge.This paper,starting from structural description of deep-water group pile foundation,analyzes impact to the bridge safety introduced by scour and its protection and further presents different solutions of scour protection for foundation structures of this bridge.展开更多
This article introduces three outstanding innovations, i.e. utilization of the steel casing for the piles to establish a construction platform for Sutong Bridge's large and deep-pile groups; 5000 ton steel cofferd...This article introduces three outstanding innovations, i.e. utilization of the steel casing for the piles to establish a construction platform for Sutong Bridge's large and deep-pile groups; 5000 ton steel cofferdam lowered as a whole and used as a protective structure against impact from ship collision; Permanent scour protection. This article also presents economical and reasonable design method for large bridge foundation and explains the significance of innovation and technical integration to large and complicated project construction based on the above theory.展开更多
A caisson foundation is applied to the north anchorage of Taizhou Yangtze River Highway Bridge of which the initial caisson sinking requires dewatering. Since the caisson foundation is quite close to nearby buildings,...A caisson foundation is applied to the north anchorage of Taizhou Yangtze River Highway Bridge of which the initial caisson sinking requires dewatering. Since the caisson foundation is quite close to nearby buildings, a system control model is established with source (sink) distribution and intensity being the object function, minimum requirements of settlement and deformation of surroundings caused by dewatering and dynamic water levels during different working procedures being constraints, and the design parameter of pumping wells being the variable,so as to lower the jeopardizing of surrounding buildings, which provides a new method for active control over settlement during dewatering. Such a method of dewatering based on system control model should be of significance for similar projects involving dewatering.展开更多
基金National Science and Technology Support Program(No.2006BAG04B05)
文摘This paper,from three aspects including construction conditions,foundation design and construction,introduces some considerations in the designing of main-pylon foundations and some practical measures to deal with certain unfavorable construction conditions,such as deep water,tidal effect,soft stratum and heavy traffic,during the construction of main-pylon foundations.
基金National Science and Technology Support Program of China(No.2009BAG15B02)"333 High-level Personnel Training Project"Special Funded Projects in Jiangsu Province
文摘Because of the computation difficulty of the beating capacity of large underwater caisson foundation on thick overburden layer ground, the geotechnieal software FLAC3D was utilized in the 3D numerical analysis on the bearing capacity of middle pylon foundation. From the computational results, it is concluded that the caisson foundation has a good bearing capacity on thick overburden layer ground and the beating capacity can be improved assuming that the soil near the area of basal comer is reinforced.
基金National Science and Technology Support Program of China(No.2009BAG15B01)Key Programs for Science and Technology Development of Chinese Transportation Industry(No.2008-353-332-190)+1 种基金the Ministry of Science and Technology of China(No.SLDRCE 08-B-04)the Fundamental Research Funds for the Central Universities and Kwang-Hua Fund for College of Civil Engineering of Tongji University
文摘Pile group foundation and caisson foundation are two common foundation schemes of long-span bridges, and the seismic performances of the two kinds of foundations are different. Taking Taizhou Bridge as an example, which is the first kilometer level three-pylon two-span suspension bridge in the world, two foundation schemes are designed for the middle pylon, and two whole bridge models with two different foundation schemes of the middle pylon are established respectively in this paper. The effects of foundation-soil interaction are simulated by equivalent linear soil springs whose stiffnesses are calculated according to m method. Seismic capacity/demand ratios of the two models are calculated. The following conclusions can be drawn: the weak positions of the two schemes are not the same; if caisson foundation is adopted for the middle pylon, the weak position is the bearing capacity of the middle pylon foundation, while if pile group foundation is adopted for the middle pylon, the weak position is the bearing capacity of the side pylon foundation.
基金National Science and Technology Support Program of China ( No. 2009BAG15B02) Key Pro-grams for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-180)
文摘Taizhou Yangtze River Bridge is the first three-pylon two-span suspension bridge in the world. The middle pylon adopts deep water caisson foundation. The superstructure of the middle pylon employs herringbone shape along the bridge, and portal shape in the transverse direction for the first time in China. In this paper, the basic construction procedure, equipment, construction steps, the key construction technologies and methods of steel pylon are introduced.
基金National Science and Technology Support Program(No.2006BAG04B06)
文摘The paper analyzes existing state of innovation system in the field of public infrastructure construction in China and elaborates on the duty and role of owner in establishment of a technical innovation system with enterprise as the main body following the process of production-education-research.This paper also claims that the key project construction is an important resource to enhance national capability of innovation and accordingly puts forward an effective approach to cultivate the core competitiveness of leading enterprises on the basis of practice in the Sutong Bridge project.
基金National Science and Technology Support Program of China ( No. 2009BAG15B02)Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-150)
文摘The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream anchorage cables, underwater topography, the drag forces of the caisson cutting edge and frictional resistances of the sidewall and etc. are monitored in real time. According to the synthesized data analysis and decision-making system, the spatial states of the caisson are adjusted in time to locate and embed the deep water caisson precisely. The offset error of the caisson is less than 30 cm and the vertical error is 1/363 at the final stage. The control technology for construction of large caisson under deep water is concluded and would be helpful for the construction of bridge foundation in the future.
基金Sponsored by the Research Fund for the Doctoral Program of Higher Education of China(Grant No.20050213008)Scientific and Technical Plan Item of Communications Department of Heilongjiang Province of China(Grant No.2004).
文摘Digital cable-stayed bridge maintenance and management system (DCBMS) was developed for the need of maintenance and management of long-span cable-stayed bridges. In this paper, the major functions and theoretical application of eight modules were systematically stated with the background of Harbin Songhua River cable-stayed bridge, which include data management module, inspection and measurement module, assessment module, finite dement analysis module, disease diagnosis and prediction module, maintenance module, query module and help module. By analyzing and calculating the data from manual inspection database, basic database and health monitoring subsystem, DCBMS can accomplish the functions like life prediction, disease diagnosis, comprehensive assessment, maintenance and management of bridges. Therefore, the maintenance and management of long-span cable-stayed bridges can be made digital, professional and scientific. By running this system, a real-time and specific technical guidance can be provided for the maintainers and managers of long- span cable-stayed bridges.
基金National Science and Technology Support Program(No.2006BAG04B05)
文摘Sutong Bridge,as a world-record cable-stayed bridge with its main span exceeding 1 000 m constructed in Yangtze River estuary region in China,is located at a site with complicated hydrologic conditions and poor geotechnical conditions and therefore,scour protection will be a decisive factor for ensuring smooth and successful construction of this bridge.This paper,starting from structural description of deep-water group pile foundation,analyzes impact to the bridge safety introduced by scour and its protection and further presents different solutions of scour protection for foundation structures of this bridge.
文摘This article introduces three outstanding innovations, i.e. utilization of the steel casing for the piles to establish a construction platform for Sutong Bridge's large and deep-pile groups; 5000 ton steel cofferdam lowered as a whole and used as a protective structure against impact from ship collision; Permanent scour protection. This article also presents economical and reasonable design method for large bridge foundation and explains the significance of innovation and technical integration to large and complicated project construction based on the above theory.
基金National Science and Technology Support Program of China ( No. 2009BAG15B02) Key Pro-grams for Science and Technology Development of Chinese Transportation industry ( No. 2008-353-332-160) +2 种基金Jiangsu Province College Graduate Research and Innovation Program ( No. CX08B_123Z) 2009 Natural ScienceFoundation of Hohai University ( No. 2009424011)the Fundamental Research Funds for the Central Universi-ties ( No. 2009B11814)
文摘A caisson foundation is applied to the north anchorage of Taizhou Yangtze River Highway Bridge of which the initial caisson sinking requires dewatering. Since the caisson foundation is quite close to nearby buildings, a system control model is established with source (sink) distribution and intensity being the object function, minimum requirements of settlement and deformation of surroundings caused by dewatering and dynamic water levels during different working procedures being constraints, and the design parameter of pumping wells being the variable,so as to lower the jeopardizing of surrounding buildings, which provides a new method for active control over settlement during dewatering. Such a method of dewatering based on system control model should be of significance for similar projects involving dewatering.