This paper presents a highly efficient method for recognizing the existence of bridge coating rust defects by using color image processing. The detection of defects on steel bridge surfaces during the operation and ma...This paper presents a highly efficient method for recognizing the existence of bridge coating rust defects by using color image processing. The detection of defects on steel bridge surfaces during the operation and maintenance of bridge structures is important to ensure the safety and reliability of them. More advanced techniques such as digital image processing have been studied for better monitoring and detection as existing infrastructure systems are aged and deteriorated rapidly. Recently, image-based defect recognition and assessment methods have gained considerable attention in the civil engineering domain due to their accuracy, speed, and lower cost. The proposed method in this paper is a fast decision-making system by utilizing color image processing. It was developed by processing original bridge coating images to generate color values and calculating eigenvalues from each digitized image. The values from two different groups, a defective group and a nondefective group, are compared each other to figure out the feasibility of this approach. Finally, an automated defect recognition method is presented and tested with more images. This method can be used to make a decision whether a given digitized image contains defects.展开更多
This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding...This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze.展开更多
Wuhan Tianxingzhou Changjiang (WTC) Bridge and Nanjing Dashengguan Changjiang (NDC) Bridge are two super high-speed railway 3-trusses composite bridges. This is the first time of using three trusses in such large brid...Wuhan Tianxingzhou Changjiang (WTC) Bridge and Nanjing Dashengguan Changjiang (NDC) Bridge are two super high-speed railway 3-trusses composite bridges. This is the first time of using three trusses in such large bridges in the world. These two types of railway floor systems of the two bridges have never been used in China before. The problem how to conform the deformations and stress levels of the railway floor system of WTC Bridge was studied. After finite element analysis and comparison,the plan of arranging one expansion stringer every two panels in railway floor system were proposed and good effect was obtained. Because of the application of three trusses,the allocation of the loads acted on the deck in three trusses is different and varies in different places of NDC Bridge. This problem was studied by model experiment and 3D finite element analysis. The results of 3D FEM analysis coincide with the model test results. The allocation rule of the loads acting on the deck in three trusses was presented. Because of the application of monolithic decks,the stiffness and structural integrity of NDC Bridge are high.展开更多
The Sutong Yangtze River Bridge(short as Sutong Bridge)is now the largest span cable-stayed bridge in the world.The construction of the superstructure of the middle bridge covered several stages including erection of ...The Sutong Yangtze River Bridge(short as Sutong Bridge)is now the largest span cable-stayed bridge in the world.The construction of the superstructure of the middle bridge covered several stages including erection of the big block girders for the side span,assistant span and tower area,erection of standard girders and closure of the middle span.The big block girders were hoisted by a floating crane,and the standard girders were hoisted by a double crane system on the deck.The pushing assistant method was adopted for the middle span closure construction.Furthermore,key technologies and innovative methods used in the processes of girder erection and cable assemblage in all stages were expatiated systematically.An all-stage self-adaptive geometry control method was used in the construction process.By accurately controlling the unstressed dimensions and shape of all structural components in each step,and realization that the control system and the controlled system adapt to each other,the goal was to make control of the final line shape and inner force of the bridge structure achievable.Two solutions,including GPS based and total station based dynamic geometry monitoring systems,were used to resolve the measure problem under the wide-range of wind-induced vibrations in the long cantilever state.Finally,research on the wind-induced vibration of the superstructure during the construction period was executed.Buffeting response analysis to the longest single and double cantilever states were carried out.The analysis and evaluation of wind resistance safety of the main girders under the longest single cantilever state was made,and corresponding wind resistance measures were suggested.The as-built geometric error and cable force error were controlled in a required design range,and this whole technological achievement can be a benchmark for construction of other large span cable-stayed bridges in the future.展开更多
文摘This paper presents a highly efficient method for recognizing the existence of bridge coating rust defects by using color image processing. The detection of defects on steel bridge surfaces during the operation and maintenance of bridge structures is important to ensure the safety and reliability of them. More advanced techniques such as digital image processing have been studied for better monitoring and detection as existing infrastructure systems are aged and deteriorated rapidly. Recently, image-based defect recognition and assessment methods have gained considerable attention in the civil engineering domain due to their accuracy, speed, and lower cost. The proposed method in this paper is a fast decision-making system by utilizing color image processing. It was developed by processing original bridge coating images to generate color values and calculating eigenvalues from each digitized image. The values from two different groups, a defective group and a nondefective group, are compared each other to figure out the feasibility of this approach. Finally, an automated defect recognition method is presented and tested with more images. This method can be used to make a decision whether a given digitized image contains defects.
文摘This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze.
基金Projects(2004G028, 2004G016) supported by the Science and Technology Development Program of Railways Department, China
文摘Wuhan Tianxingzhou Changjiang (WTC) Bridge and Nanjing Dashengguan Changjiang (NDC) Bridge are two super high-speed railway 3-trusses composite bridges. This is the first time of using three trusses in such large bridges in the world. These two types of railway floor systems of the two bridges have never been used in China before. The problem how to conform the deformations and stress levels of the railway floor system of WTC Bridge was studied. After finite element analysis and comparison,the plan of arranging one expansion stringer every two panels in railway floor system were proposed and good effect was obtained. Because of the application of three trusses,the allocation of the loads acted on the deck in three trusses is different and varies in different places of NDC Bridge. This problem was studied by model experiment and 3D finite element analysis. The results of 3D FEM analysis coincide with the model test results. The allocation rule of the loads acting on the deck in three trusses was presented. Because of the application of monolithic decks,the stiffness and structural integrity of NDC Bridge are high.
基金National Science and Technology Support Program of China(No.2006BAG04B03)
文摘The Sutong Yangtze River Bridge(short as Sutong Bridge)is now the largest span cable-stayed bridge in the world.The construction of the superstructure of the middle bridge covered several stages including erection of the big block girders for the side span,assistant span and tower area,erection of standard girders and closure of the middle span.The big block girders were hoisted by a floating crane,and the standard girders were hoisted by a double crane system on the deck.The pushing assistant method was adopted for the middle span closure construction.Furthermore,key technologies and innovative methods used in the processes of girder erection and cable assemblage in all stages were expatiated systematically.An all-stage self-adaptive geometry control method was used in the construction process.By accurately controlling the unstressed dimensions and shape of all structural components in each step,and realization that the control system and the controlled system adapt to each other,the goal was to make control of the final line shape and inner force of the bridge structure achievable.Two solutions,including GPS based and total station based dynamic geometry monitoring systems,were used to resolve the measure problem under the wide-range of wind-induced vibrations in the long cantilever state.Finally,research on the wind-induced vibration of the superstructure during the construction period was executed.Buffeting response analysis to the longest single and double cantilever states were carried out.The analysis and evaluation of wind resistance safety of the main girders under the longest single cantilever state was made,and corresponding wind resistance measures were suggested.The as-built geometric error and cable force error were controlled in a required design range,and this whole technological achievement can be a benchmark for construction of other large span cable-stayed bridges in the future.