Long span ultra-high voltage(UHV) transmission lines have serious aeolian vibration problems. To control these vibrations,we improved the energy balance method in the following aspects:the wind power input,the conduct...Long span ultra-high voltage(UHV) transmission lines have serious aeolian vibration problems. To control these vibrations,we improved the energy balance method in the following aspects:the wind power input,the conductor self-damping,and the damper dissipated power. Meanwhile,we built a theoretical mechanical model of β wire dampers and derived energy dissipation calculation formulae. This permits the vibration energy dissipated by β wire dampers can be considered in the energy balance method. Then,we developed a computer program based on the improved energy balance method using Matlab,and analyzed UHV long span ground wires of the Han River long span project in P. R. China. The results show that the combination of β wire dampers and Stockbridge dampers can reduce vibration of UHV long span transmission lines,which provides a reference for research and construction of UHV engineering projects.展开更多
基金Funded by the Natural Science Foundation of China (No. 50878093).
文摘Long span ultra-high voltage(UHV) transmission lines have serious aeolian vibration problems. To control these vibrations,we improved the energy balance method in the following aspects:the wind power input,the conductor self-damping,and the damper dissipated power. Meanwhile,we built a theoretical mechanical model of β wire dampers and derived energy dissipation calculation formulae. This permits the vibration energy dissipated by β wire dampers can be considered in the energy balance method. Then,we developed a computer program based on the improved energy balance method using Matlab,and analyzed UHV long span ground wires of the Han River long span project in P. R. China. The results show that the combination of β wire dampers and Stockbridge dampers can reduce vibration of UHV long span transmission lines,which provides a reference for research and construction of UHV engineering projects.