Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equi...Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equilibrium method. The calculation results present that the safety factors of pillars in Sections 19, 20, 24, 28 are less than 1.3, and those of unstable sections are identified preliminarily. Further, a numerical investigation in Sections 18, 20, 22, 24, 25 and 28 implemented with numerical code RFPA20 is employed to further validate the pillar performance and the stability of stopes. The numerical results show the pillars in Sections 18, 22 and 24 are stable and the designed pillar size is suitable. The width of the ore body near Section 28 averages 20 m, failure occurs in the left stope, but the boundary pillars near Section 28 maintain good performance. The pillars in Sections 20 and 25 are unstable which are mainly affected by the Faults F8 and F18. The existence of faults alters the stress distribution, failure mode and water inrush pathway. This work provides a meaningful standard for boundary pillar and stope design in a mine as it transitions from an open pit to underground.展开更多
An effective evaluation system can provide specific and practical suggestions to the deep groundwater management. But such kind of evaluation system has not been proposed in China. In this study, an evaluation index s...An effective evaluation system can provide specific and practical suggestions to the deep groundwater management. But such kind of evaluation system has not been proposed in China. In this study, an evaluation index system is specifically developed to evaluate deep groundwater management efficiency. It is composed of three first-level indicators(law enforcement capability, management ability, and management effectiveness) and eleven second-level indicators. The second-level indicators include seven mandatory indicators and four optional indicators. Piecewise linear function is used to normalize the quantitative indicators, and expert scoring method and questionnaire survey method are used to normalize the qualitative indicators. Then a comprehensive indicator weighting evaluation method is used to evaluate the first-level indicators and the target topic. A case study is carried out to evaluate deep groundwater management efficiency in Tianjin City. According to the evaluation score in each period, the management efficiency of every district in Tianjin City gradually improved. The overall evaluation score in the early deep groundwater extraction period is 0.12. After a series of deep groundwater protection efforts, this score reached to 0.61 in 2007, and met the regulation criteria. The evaluation results also showed that the further groundwater management efforts in Tianjin City should be focused on building a dynamic database to collect comprehensive deep well-log data; and on a reasonable design and distribution of the groundwater monitoring network. It demonstrated that the index system is suitable to locate the deficiencies of current groundwater management systems and to guide further improvements. It can then be used to protect deep groundwater.展开更多
基金Projects(1004025,51174044,50934006)supported by the National Natural Science FoundationProject(2011AA060400)supported by the National High Technique Research and Development Program of ChinaProject(Sklgduek1113)supported by Funds of the State Key Laboratory for Geomechanics&Deep Underground Engineering,Chinese University of Mining and Technology,China
文摘Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equilibrium method. The calculation results present that the safety factors of pillars in Sections 19, 20, 24, 28 are less than 1.3, and those of unstable sections are identified preliminarily. Further, a numerical investigation in Sections 18, 20, 22, 24, 25 and 28 implemented with numerical code RFPA20 is employed to further validate the pillar performance and the stability of stopes. The numerical results show the pillars in Sections 18, 22 and 24 are stable and the designed pillar size is suitable. The width of the ore body near Section 28 averages 20 m, failure occurs in the left stope, but the boundary pillars near Section 28 maintain good performance. The pillars in Sections 20 and 25 are unstable which are mainly affected by the Faults F8 and F18. The existence of faults alters the stress distribution, failure mode and water inrush pathway. This work provides a meaningful standard for boundary pillar and stope design in a mine as it transitions from an open pit to underground.
基金Under the auspices of National Basic Research Program of China(No.2010CB428804)
文摘An effective evaluation system can provide specific and practical suggestions to the deep groundwater management. But such kind of evaluation system has not been proposed in China. In this study, an evaluation index system is specifically developed to evaluate deep groundwater management efficiency. It is composed of three first-level indicators(law enforcement capability, management ability, and management effectiveness) and eleven second-level indicators. The second-level indicators include seven mandatory indicators and four optional indicators. Piecewise linear function is used to normalize the quantitative indicators, and expert scoring method and questionnaire survey method are used to normalize the qualitative indicators. Then a comprehensive indicator weighting evaluation method is used to evaluate the first-level indicators and the target topic. A case study is carried out to evaluate deep groundwater management efficiency in Tianjin City. According to the evaluation score in each period, the management efficiency of every district in Tianjin City gradually improved. The overall evaluation score in the early deep groundwater extraction period is 0.12. After a series of deep groundwater protection efforts, this score reached to 0.61 in 2007, and met the regulation criteria. The evaluation results also showed that the further groundwater management efforts in Tianjin City should be focused on building a dynamic database to collect comprehensive deep well-log data; and on a reasonable design and distribution of the groundwater monitoring network. It demonstrated that the index system is suitable to locate the deficiencies of current groundwater management systems and to guide further improvements. It can then be used to protect deep groundwater.