期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
天然气的加工与处理分析
1
作者 李悦章 《化工管理》 2019年第17期223-223,共1页
天然气作为一种清洁能源,无时无刻不在被人们使用着,它作为一种较清洁的能源,被大力开发,煤炭、石油等能源被取而代之。油田天然气的提取属于一个化工流程,从凝析液中提取后又经过一系列的过程将天然气保存供工厂使用,目前全球都在大力... 天然气作为一种清洁能源,无时无刻不在被人们使用着,它作为一种较清洁的能源,被大力开发,煤炭、石油等能源被取而代之。油田天然气的提取属于一个化工流程,从凝析液中提取后又经过一系列的过程将天然气保存供工厂使用,目前全球都在大力开发天然气,我国也不例外,但是如何高效率的利用油田天然气使它发挥最大的功能和价值,这是我们需要关心的重点内容,文章将从天然气的加工和处理两方面来具体阐述如何对天然气更好的应用。 展开更多
关键词 天然气 天然气加工处理 分析
下载PDF
在《天然气处理与加工》课程中应用外文教材的一点体会 被引量:1
2
作者 张立希 《石油教育》 1998年第3期32-33,共2页
关键词 天然气处理加工 外文教材 专业英语词汇 天然气工业 教学内容 专业课教学 矿场加工 教学实践 专业词汇 石油天然气
原文传递
Innovative Approach to Increase Name Plate Capacity of Oil and Gas Gathering Centre
3
作者 Chirag Parikh Abdulaziz Al-Saeed Bader Mahmoud Raj iv Kukreja 《Journal of Energy and Power Engineering》 2015年第10期860-865,共6页
Purpose: The oil and gas gathering and processing facility of Kuwait Oil Company is built with a nameplate capacity of X MBOPD (thousand barrels oil per day) with 50% water cut. However, the facility was operating ... Purpose: The oil and gas gathering and processing facility of Kuwait Oil Company is built with a nameplate capacity of X MBOPD (thousand barrels oil per day) with 50% water cut. However, the facility was operating with a water cut of 35%. This comprehensive technical study was conducted to evaluate possibility of increasing oil processing capacity of this facility in line with current lower water cut and other operational flexibilities available in the facility without utilizing its design margin. Topic: This paper shares an innovative approach to increase name plate capacity of oil and gas processing facility utilizing available operational flexibility and operational margins with minor modification. It shares a case study where facility capacity is increased by around 19% without utilizing design margins of equipment or pipeline. Method: The study includes theoretical verification and analysis of all major equipment and piping to identify available capacity and limitation, in order to utilize available additional margin and to propose debottleneck options to overcome limitations. Achievement: The study confirmed that, facility name plate capacity can be revised from X MBOPD (with 50% w.c (water cut)) to X + 32 MBOPD (with: 45% w.c) minor modification in separator and utilizing margin available in feed specification ofdesalter trains. 展开更多
关键词 Debottlenecking capacity enhancement production.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部