We discuss the feasibility of using controlled-source electromagnetic (CSEM) in the frequency domain for prospecting marine gas hydrates. Based on the Ocean Drilling Program (ODP) Leg 164 log data, we have establi...We discuss the feasibility of using controlled-source electromagnetic (CSEM) in the frequency domain for prospecting marine gas hydrates. Based on the Ocean Drilling Program (ODP) Leg 164 log data, we have established several 1-D resistivity models which have different gas hydrate concentrations. Meanwhile, we analyzed the electromagnetic response of marine gas hydrates in the frequency domain based on these models. We also studied the relationship between electrical field magnitude or phase and parameters such as receiver-transmitter distance and frequency. Our numerical modeling results provide us with a quantitative reference for exploration and resource evaluation of marine gas hydrates.展开更多
In this letter,capacity estimation for Mobile Ad hoc NETworks (MANETs) using direc- tional antennas are studied.Two Matrix-based Fast Calculation Algorithms (MFCAs) are proposed to estimate the network capacity in a n...In this letter,capacity estimation for Mobile Ad hoc NETworks (MANETs) using direc- tional antennas are studied.Two Matrix-based Fast Calculation Algorithms (MFCAs) are proposed to estimate the network capacity in a network scenario in which there is no channel sharing among multiple sessions and traffic is sensitive to delay with an end-to-end delay constraint.The first algo- rithm MFCA-1 is used to estimate network capacity in a situation where all links have the same delay. It estimates the maximum number of k-hop sessions in a network based on the k-hop adjacency matrix of the network.The second algorithm MFCA-2 is used to estimate network capacity in a situation where different links may have different delays.It calculates the maximum number of sessions in a network with an end-to-end delay constraint based on the adjacency matrix and the link-delay matrix of the network.Numerical and simulation results show that both MFCA-1 and MFCA-2 can calculate network capacity much faster than the well-known Brute-Force Search Algorithm (BFSA) but with the same accuracy.展开更多
With the characteristics of coal seam geology and gas occurrence,a'ground-underground' integrated gas drainage method was formed,which can relieve gaspressure and increase permeability by mining the protection...With the characteristics of coal seam geology and gas occurrence,a'ground-underground' integrated gas drainage method was formed,which can relieve gaspressure and increase permeability by mining the protection seams in conditional regions.After coal seam gas drainage,high gas outburst seam was converted to low gas safetyseam.In the coal face mining process,safety and high efficient coal mining were realizedby the measure of gas-suction over mining.In addition to the drainage gas for civil gasand gas power generation,the Huaibei Mining Group has actively carried out research onthe utilization technology of methane drainage by ventilation.On the one hand,it can saveprecious energy;on the other hand,it can protect the environment for people's survival.In2007,the amount of coal mine gas drainage was 120 hm3;the rate of coal mine gasdrainage was 44%.Compared with the year 2002,the amount of coal mine gas drainageincreased by two times.Meanwhile,the utilization rate of gas increased rapidly.展开更多
基金supported by the Program for New Century Excellent Talents in University(No.NCET-04-0370)
文摘We discuss the feasibility of using controlled-source electromagnetic (CSEM) in the frequency domain for prospecting marine gas hydrates. Based on the Ocean Drilling Program (ODP) Leg 164 log data, we have established several 1-D resistivity models which have different gas hydrate concentrations. Meanwhile, we analyzed the electromagnetic response of marine gas hydrates in the frequency domain based on these models. We also studied the relationship between electrical field magnitude or phase and parameters such as receiver-transmitter distance and frequency. Our numerical modeling results provide us with a quantitative reference for exploration and resource evaluation of marine gas hydrates.
基金Supported by the National Natural Science Foundation of China (No.60402005).
文摘In this letter,capacity estimation for Mobile Ad hoc NETworks (MANETs) using direc- tional antennas are studied.Two Matrix-based Fast Calculation Algorithms (MFCAs) are proposed to estimate the network capacity in a network scenario in which there is no channel sharing among multiple sessions and traffic is sensitive to delay with an end-to-end delay constraint.The first algo- rithm MFCA-1 is used to estimate network capacity in a situation where all links have the same delay. It estimates the maximum number of k-hop sessions in a network based on the k-hop adjacency matrix of the network.The second algorithm MFCA-2 is used to estimate network capacity in a situation where different links may have different delays.It calculates the maximum number of sessions in a network with an end-to-end delay constraint based on the adjacency matrix and the link-delay matrix of the network.Numerical and simulation results show that both MFCA-1 and MFCA-2 can calculate network capacity much faster than the well-known Brute-Force Search Algorithm (BFSA) but with the same accuracy.
文摘With the characteristics of coal seam geology and gas occurrence,a'ground-underground' integrated gas drainage method was formed,which can relieve gaspressure and increase permeability by mining the protection seams in conditional regions.After coal seam gas drainage,high gas outburst seam was converted to low gas safetyseam.In the coal face mining process,safety and high efficient coal mining were realizedby the measure of gas-suction over mining.In addition to the drainage gas for civil gasand gas power generation,the Huaibei Mining Group has actively carried out research onthe utilization technology of methane drainage by ventilation.On the one hand,it can saveprecious energy;on the other hand,it can protect the environment for people's survival.In2007,the amount of coal mine gas drainage was 120 hm3;the rate of coal mine gasdrainage was 44%.Compared with the year 2002,the amount of coal mine gas drainageincreased by two times.Meanwhile,the utilization rate of gas increased rapidly.