The general construction procedure of the steel middle pylon is briefly introduced. The alignment control of the pylon is carried out during the whole process of the construction. The control concept is extended to th...The general construction procedure of the steel middle pylon is briefly introduced. The alignment control of the pylon is carried out during the whole process of the construction. The control concept is extended to the manufacture stage. The manufacturing alignment error is strictly controlled in the segments precast process in factory, and the error is recognized and predicted precisely during the installation stage. The adjusting joints are employed to amend the accumulated error, which ensure that the steel pylon alignment could satisfy the precision requirements after installation.展开更多
A subsea flowline jumper (FJ) is a basic connected component for the wet oil tree, subsea pipeline and riser base, and it plays an irreplaceable role in the subsea production system. During the installation of FJ, c...A subsea flowline jumper (FJ) is a basic connected component for the wet oil tree, subsea pipeline and riser base, and it plays an irreplaceable role in the subsea production system. During the installation of FJ, collisions often happen between FJ and other equipment, which may cause serious damage. Besides, as the operating water depth increases, the demand for the installation equipments, such as the crane and winch, will increase. The research of deepwater FJ installation in China is still in the primary stage, thus an installation method for the deepwater FJ is proposed in this paper. Finite element models of a typical M-shaped FJ installation system are built to simulate the installation procedures. Analysis results show that the installation steps designed are feasible and valid for the deepwater FJ. In order to ensure the safety of the installation process, the collision-sensitive analysis for the FJ is conducted, and results show that it is necessary to set the pick up speed at a proper value, in order to avoid collision in the installation process. Besides, the mechanical characteristics of FJ during the installation are investigated under a range of environmental conditions and it is found that the maximum stress of the FJ always happens at its central position. The basic requirements for the installation equipment are also obtained through the analysis of the main installation steps.展开更多
In this study, we examined the thermal effects throughout the process of the placement of span-scale girder segments on a 6×110-m continuous steel box girder in the Hong Kong-Zhuhai-Macao Bridge. Firstly, when a ...In this study, we examined the thermal effects throughout the process of the placement of span-scale girder segments on a 6×110-m continuous steel box girder in the Hong Kong-Zhuhai-Macao Bridge. Firstly, when a span-scale girder segment is temporarily stored in the open air, temperature gradients will significantly increase the maximum reaction force on temporary supports and cause local buckling at the bottom of the girder segment. Secondly, due to the temperature difference of the girder segments before and after girth-welding, some residual thermal deflections will appear on the girder segments because the boundary conditions of the structure are changed by the girth-welding. Thirdly, the thermal expansion and thermal bending of girder segments will cause movement and rotation of bearings, which must be considered in setting bearings. We propose control measures for these problems based on finite element method simulation with field-measured temperatures. The local buckling during open-air storage can be avoided by reasonably determining the appropriate positions of temporary supports using analysis of overall and local stresses. The residual thermal deflections can be overcome by performing girth-welding during a period when the vertical temperature difference of the girder is within 1 °C, such as after 22:00. Some formulas are proposed to determine the pre-set distances for bearings, in which the movement and rotation of the bearings due to dead loads and thermal loads are considered. Finally, the feasibility of these control measures in the placement of span-scale girder segments on a real continuous girder was verified: no local buckling was observed during open-air storage;the residual thermal deflections after girth-welding were controlled within 5 mm and the residual pre-set distances of bearings when the whole continuous girder reached its design state were controlled within 20 mm.展开更多
基金National Science and Technology Support Program of China ( No. 2009BAG15B02) Key Pro-grams for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-180)
文摘The general construction procedure of the steel middle pylon is briefly introduced. The alignment control of the pylon is carried out during the whole process of the construction. The control concept is extended to the manufacture stage. The manufacturing alignment error is strictly controlled in the segments precast process in factory, and the error is recognized and predicted precisely during the installation stage. The adjusting joints are employed to amend the accumulated error, which ensure that the steel pylon alignment could satisfy the precision requirements after installation.
基金Supported by the Numerical Simulation and Experimental Investigation of FPSO and Offloading System(2011ZX05030-006-002)
文摘A subsea flowline jumper (FJ) is a basic connected component for the wet oil tree, subsea pipeline and riser base, and it plays an irreplaceable role in the subsea production system. During the installation of FJ, collisions often happen between FJ and other equipment, which may cause serious damage. Besides, as the operating water depth increases, the demand for the installation equipments, such as the crane and winch, will increase. The research of deepwater FJ installation in China is still in the primary stage, thus an installation method for the deepwater FJ is proposed in this paper. Finite element models of a typical M-shaped FJ installation system are built to simulate the installation procedures. Analysis results show that the installation steps designed are feasible and valid for the deepwater FJ. In order to ensure the safety of the installation process, the collision-sensitive analysis for the FJ is conducted, and results show that it is necessary to set the pick up speed at a proper value, in order to avoid collision in the installation process. Besides, the mechanical characteristics of FJ during the installation are investigated under a range of environmental conditions and it is found that the maximum stress of the FJ always happens at its central position. The basic requirements for the installation equipment are also obtained through the analysis of the main installation steps.
基金Project supported by the National Natural Science Foundation of China(Nos.51578496 and 51878603)the Zhejiang Provincial Natural Science Foundation of China(No.LZ16E080001)。
文摘In this study, we examined the thermal effects throughout the process of the placement of span-scale girder segments on a 6×110-m continuous steel box girder in the Hong Kong-Zhuhai-Macao Bridge. Firstly, when a span-scale girder segment is temporarily stored in the open air, temperature gradients will significantly increase the maximum reaction force on temporary supports and cause local buckling at the bottom of the girder segment. Secondly, due to the temperature difference of the girder segments before and after girth-welding, some residual thermal deflections will appear on the girder segments because the boundary conditions of the structure are changed by the girth-welding. Thirdly, the thermal expansion and thermal bending of girder segments will cause movement and rotation of bearings, which must be considered in setting bearings. We propose control measures for these problems based on finite element method simulation with field-measured temperatures. The local buckling during open-air storage can be avoided by reasonably determining the appropriate positions of temporary supports using analysis of overall and local stresses. The residual thermal deflections can be overcome by performing girth-welding during a period when the vertical temperature difference of the girder is within 1 °C, such as after 22:00. Some formulas are proposed to determine the pre-set distances for bearings, in which the movement and rotation of the bearings due to dead loads and thermal loads are considered. Finally, the feasibility of these control measures in the placement of span-scale girder segments on a real continuous girder was verified: no local buckling was observed during open-air storage;the residual thermal deflections after girth-welding were controlled within 5 mm and the residual pre-set distances of bearings when the whole continuous girder reached its design state were controlled within 20 mm.