期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
现浇钢筋混凝土空心楼板成孔管的定位施工工法 被引量:2
1
作者 刘彬 张玉源 姜凯 《建筑施工》 2005年第1期25-26,共2页
介绍了现浇混凝土空心楼板GBF管用钢筋网片加剪力撑固定的施工工法及原理,与常用的楔绑法相比,有较明显的技术经济效果。
关键词 空心楼板 戍孔管 网片 定位工法
下载PDF
Positioning of grid points in wave front construction 被引量:6
2
作者 Han Fuxing Sun Jianguo +1 位作者 Sun Zhangqing Yang Hao 《Applied Geophysics》 SCIE CSCD 2009年第3期248-258,300,共12页
In view of the relative positioning problem between non-regular quadrilateral grids and regular rectangle grid nodes in the wave front construction method, concrete realization problems with four grid positioning meth... In view of the relative positioning problem between non-regular quadrilateral grids and regular rectangle grid nodes in the wave front construction method, concrete realization problems with four grid positioning methods (vector cross product judgment, angle sum, intersection-point, and signs comparison algorithms) in wave front construction which are commonly used in computer graphics are compared and analyzed in this paper. Based on the stability analysis of the location method, the calculation examples show that the vector cross product judgment method is faster and more accurate than other methods in the realization of the relative positioning between non-regular quadrilateral grids and regular rectangle grid nodes in wave front construction. It provides precise grid point attribute values for the next steps of migration and demigration. 展开更多
关键词 wave front construction grid localization grid nodes wave front quadrilateral
下载PDF
Dynamic Deformation Monitoring for Long-Span Bridges under Construction and EMD De-noising Method
3
作者 Shengxiang Huang Chao Kang Wen Zhang 《Journal of Civil Engineering and Architecture》 2016年第7期853-859,共7页
Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traff... Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traffic. To exactly evaluate the periodic alignments, internal forces and safety, geometrical and physical monitoring are needed during construction. This study aims at the requirement of dynamic geometric monitoring during Sutong Bridge construction, and introduces the realization and observing schemes of the self-developed GPS real-time dynamic geometrical deformation monitoring system. Affected by wind load and construction circumstance, GPS (global positioning system) monitoring signal contains a variety of noise. And the useful signal can be extracted from the signal after de-noising the noises. A de-noising method based on EMD (empirical mode decomposition) model is introduced here to process the bridge dynamic monitoring data, and with the wavelet threshold de-noising method are compared. The result shows that the EMD method has good adaptability, is free from the choice of wavelet bases and the number of decomposition layer. The method is an effective de-noising method for dynamic deformation monitoring to large-span bridges. 展开更多
关键词 Long-span bridge construction period dynamic deformation monitoring empirical mode decomposition de-noising.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部