In view of the relative positioning problem between non-regular quadrilateral grids and regular rectangle grid nodes in the wave front construction method, concrete realization problems with four grid positioning meth...In view of the relative positioning problem between non-regular quadrilateral grids and regular rectangle grid nodes in the wave front construction method, concrete realization problems with four grid positioning methods (vector cross product judgment, angle sum, intersection-point, and signs comparison algorithms) in wave front construction which are commonly used in computer graphics are compared and analyzed in this paper. Based on the stability analysis of the location method, the calculation examples show that the vector cross product judgment method is faster and more accurate than other methods in the realization of the relative positioning between non-regular quadrilateral grids and regular rectangle grid nodes in wave front construction. It provides precise grid point attribute values for the next steps of migration and demigration.展开更多
Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traff...Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traffic. To exactly evaluate the periodic alignments, internal forces and safety, geometrical and physical monitoring are needed during construction. This study aims at the requirement of dynamic geometric monitoring during Sutong Bridge construction, and introduces the realization and observing schemes of the self-developed GPS real-time dynamic geometrical deformation monitoring system. Affected by wind load and construction circumstance, GPS (global positioning system) monitoring signal contains a variety of noise. And the useful signal can be extracted from the signal after de-noising the noises. A de-noising method based on EMD (empirical mode decomposition) model is introduced here to process the bridge dynamic monitoring data, and with the wavelet threshold de-noising method are compared. The result shows that the EMD method has good adaptability, is free from the choice of wavelet bases and the number of decomposition layer. The method is an effective de-noising method for dynamic deformation monitoring to large-span bridges.展开更多
基金This research work is supported by the Projects of National Science Foundation of China (Grant No, 40574052 and 40437018) and National Basic Research Program of China (973 Program) (Grant No. 2007CB209603).Acknowledgements We wish to thank Researcher Xu Tao for his advice and comment. We also thank Mrs. Wang Kun for her help in the process of translation.
文摘In view of the relative positioning problem between non-regular quadrilateral grids and regular rectangle grid nodes in the wave front construction method, concrete realization problems with four grid positioning methods (vector cross product judgment, angle sum, intersection-point, and signs comparison algorithms) in wave front construction which are commonly used in computer graphics are compared and analyzed in this paper. Based on the stability analysis of the location method, the calculation examples show that the vector cross product judgment method is faster and more accurate than other methods in the realization of the relative positioning between non-regular quadrilateral grids and regular rectangle grid nodes in wave front construction. It provides precise grid point attribute values for the next steps of migration and demigration.
文摘Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traffic. To exactly evaluate the periodic alignments, internal forces and safety, geometrical and physical monitoring are needed during construction. This study aims at the requirement of dynamic geometric monitoring during Sutong Bridge construction, and introduces the realization and observing schemes of the self-developed GPS real-time dynamic geometrical deformation monitoring system. Affected by wind load and construction circumstance, GPS (global positioning system) monitoring signal contains a variety of noise. And the useful signal can be extracted from the signal after de-noising the noises. A de-noising method based on EMD (empirical mode decomposition) model is introduced here to process the bridge dynamic monitoring data, and with the wavelet threshold de-noising method are compared. The result shows that the EMD method has good adaptability, is free from the choice of wavelet bases and the number of decomposition layer. The method is an effective de-noising method for dynamic deformation monitoring to large-span bridges.