期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
实施定项管理是课任教师提高教学质量的重要保证
1
作者 李琳 《科技创新导报》 2011年第31期174-174,共1页
教育管理不仅仅是班主任的职责,也应是课任教师的义务。在教育学生的过程中,教育学生要有计划,有了计划才有目标,有了目标,才有方法,这个方法就是定项管理,即坚持一个施爱标准,调动两个能动积极性,凝聚三重主体力量,发挥四套班子作用。... 教育管理不仅仅是班主任的职责,也应是课任教师的义务。在教育学生的过程中,教育学生要有计划,有了计划才有目标,有了目标,才有方法,这个方法就是定项管理,即坚持一个施爱标准,调动两个能动积极性,凝聚三重主体力量,发挥四套班子作用。定项管理实施得当,教学质量才能得到保证。 展开更多
关键词 实施 定项管理 保证 教学质量
下载PDF
“其它支出”账户不可啥都往里塞
2
作者 付长春 《农村财务会计》 2004年第1期19-20,共2页
关键词 村合作经济组织 会计制度 “其它支出” 会计科目 管理费用 集体财务 定项限额管理
下载PDF
Cost Risk Appraisal: An Application of Project RiskManagement Process in Libyan Construction Projects
3
作者 Fouzi Ahmed Hossen 《Journal of Civil Engineering and Architecture》 2013年第5期591-600,共10页
Projects delay and cost overrun have become general facts in the construction industry. Project cost risk analysis considers the different costs associated with a project and focuses on the uncertainties and risks tha... Projects delay and cost overrun have become general facts in the construction industry. Project cost risk analysis considers the different costs associated with a project and focuses on the uncertainties and risks that may affect these costs. An implementation of PRM (project risk management) process on regional construction project has been carried out to maximize the likelihood of project meeting its objectives within its constraints. Qualitative and quantitative risk analyses have been carried out. The qualitative analysis is presented in a table that shows top ranked risks in Libyan construction projects based on probability-impact grid technique. In quantitative risk analyses, Mont Carlo simulation technique has been conducted to quantify and evaluate the overall level of risk exposure associated with the project completion cost. A project simulation uses a model that translates cost uncertainties into their potential impact on project objectives. A frequency curve model that represents simulation results of project completion costs has been constructed. The frequency curve model shows all possible outcomes of expected project cost at different probabilities. Project manager or decision maker can select the appropriate project budget. If a probability of 0.95 confident project budget is selected that means cost overrun risk can be minimized to a probability of 0.05. It is very helpful for project manager to take decisions based on information that shows project completion cost and its associated probability rather than usin single information of estimated cost. 展开更多
关键词 Project cost risk analysis Monte Carlo simulation delay factors.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部