The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream a...The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream anchorage cables, underwater topography, the drag forces of the caisson cutting edge and frictional resistances of the sidewall and etc. are monitored in real time. According to the synthesized data analysis and decision-making system, the spatial states of the caisson are adjusted in time to locate and embed the deep water caisson precisely. The offset error of the caisson is less than 30 cm and the vertical error is 1/363 at the final stage. The control technology for construction of large caisson under deep water is concluded and would be helpful for the construction of bridge foundation in the future.展开更多
The problems of airport landside capacity assessment are of industry-wide interest. Evaluation of landside capacity enables airport operators and airport designers to identify passenger and baggage flow bottlenecks, i...The problems of airport landside capacity assessment are of industry-wide interest. Evaluation of landside capacity enables airport operators and airport designers to identify passenger and baggage flow bottlenecks, identify the primary cause of bottlenecks formation and take measures mitigating the impact of bottlenecks on the airport terminal operation. Many studies dealing with the problems of airport landside capacity are focused mainly on the processing part of the airport terminal and consider the airport terminal to be an isolated system. Even the most of models of airport landside operations developed using various simulation (both generic and dedicated) software packages (e.g., PaxSim, SLAM, WITNESS, ARENA or EXTEND) are designed for simulating the passenger and baggage flows only between curb-side and apron. Although this approach provides valuable data concerning capacity, delays or processing bottlenecks, in some cases identified capacity constraints are only the symptoms of the actual problem. In order to discover the cause of the problem, it is necessary to consider the airport terminal as an integral part of much more complex regional, national or international transportation system. This article reflects the above mentioned requirements and introduces an innovative approach to passenger and baggage flow simulation based on the fact that airport terminal is considered as an integral part of air passenger door-to-door transportation process.展开更多
Based on the analysis of different requirements of energy management center construction and the data acquisition of various industries in wide area network, as well as the practices of real-lime online system, the pa...Based on the analysis of different requirements of energy management center construction and the data acquisition of various industries in wide area network, as well as the practices of real-lime online system, the paper puts forward the construction scheme of regional energy management center (REMC) which can achieve real time online monitoring of organizations' energy consumption via data collection, and also proposes the design idea of energy data acquisition based on national standards.展开更多
基金National Science and Technology Support Program of China ( No. 2009BAG15B02)Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-150)
文摘The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream anchorage cables, underwater topography, the drag forces of the caisson cutting edge and frictional resistances of the sidewall and etc. are monitored in real time. According to the synthesized data analysis and decision-making system, the spatial states of the caisson are adjusted in time to locate and embed the deep water caisson precisely. The offset error of the caisson is less than 30 cm and the vertical error is 1/363 at the final stage. The control technology for construction of large caisson under deep water is concluded and would be helpful for the construction of bridge foundation in the future.
文摘The problems of airport landside capacity assessment are of industry-wide interest. Evaluation of landside capacity enables airport operators and airport designers to identify passenger and baggage flow bottlenecks, identify the primary cause of bottlenecks formation and take measures mitigating the impact of bottlenecks on the airport terminal operation. Many studies dealing with the problems of airport landside capacity are focused mainly on the processing part of the airport terminal and consider the airport terminal to be an isolated system. Even the most of models of airport landside operations developed using various simulation (both generic and dedicated) software packages (e.g., PaxSim, SLAM, WITNESS, ARENA or EXTEND) are designed for simulating the passenger and baggage flows only between curb-side and apron. Although this approach provides valuable data concerning capacity, delays or processing bottlenecks, in some cases identified capacity constraints are only the symptoms of the actual problem. In order to discover the cause of the problem, it is necessary to consider the airport terminal as an integral part of much more complex regional, national or international transportation system. This article reflects the above mentioned requirements and introduces an innovative approach to passenger and baggage flow simulation based on the fact that airport terminal is considered as an integral part of air passenger door-to-door transportation process.
文摘Based on the analysis of different requirements of energy management center construction and the data acquisition of various industries in wide area network, as well as the practices of real-lime online system, the paper puts forward the construction scheme of regional energy management center (REMC) which can achieve real time online monitoring of organizations' energy consumption via data collection, and also proposes the design idea of energy data acquisition based on national standards.