Estimation method of building damage level was introduced for the accurate and effective estimation of damage extent and relief goods demand according to long-distance image contrast. In order to obtain completion deg...Estimation method of building damage level was introduced for the accurate and effective estimation of damage extent and relief goods demand according to long-distance image contrast. In order to obtain completion degree of building edge extracted from long-distance images before and after disaster, the concentration ratio was analyzed with Hough transformation. Based on the maximum posterior probability, estimation method of affected population was designed to accurately estimate victim population, which can be directly reflected by fugitive population. Moreover, on basis of escape route and fugitive population, demand assignment algorithm by backward calculation was designed to improve rescue efficiency.展开更多
文摘Estimation method of building damage level was introduced for the accurate and effective estimation of damage extent and relief goods demand according to long-distance image contrast. In order to obtain completion degree of building edge extracted from long-distance images before and after disaster, the concentration ratio was analyzed with Hough transformation. Based on the maximum posterior probability, estimation method of affected population was designed to accurately estimate victim population, which can be directly reflected by fugitive population. Moreover, on basis of escape route and fugitive population, demand assignment algorithm by backward calculation was designed to improve rescue efficiency.